W912EF17C0024
IGF::OT::IGF DISASSEMBLY OF UNIT 5, REPAIR THE ROTOR SPIDER, FEA ANALYSIS, TURBINE SEALS
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | US ARMY ENGINEER DISTRICT WALLA WAL |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Z2KA — REPAIR OR ALTERATION OF DAMS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $7.9M |
| Current contract value | $7.9M |
| Potential contract value / ceiling | $8.6M |
| Start date | Sep 27, 2017 |
| Current end date | Dec 30, 2021 |
| Potential end date | Dec 30, 2021 |
| Latest award activity | Dec 17, 2024 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 30 of 30 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 17, 2024 | A00022 | $-10.5K | UPPER BEARING BRACKET REPLACEMENT |
| Aug 19, 2024 | A00021 | $0 | 18" CULVERT REPAIR AND ADD. CONDUIT |
| Apr 4, 2024 | A00020 | $0 | REA CRANE MISHAP MFL TEST |
| Jun 21, 2023 | A00019 | $0 | REA THRUST SHOES DESCOPING |
| Apr 5, 2023 | A00018 | $0 | HEAD COVER SHIMMING |
| Dec 15, 2022 | A00017 | $0 | CR019 FLUSH PIPING AND MANDREL AND CR021 THRUST BEARING SPRING BED DIVIDER REPAIR. |
| Sep 29, 2022 | A00016 | $0 | STRIKE AND COVID DELAYS |
| Apr 1, 2022 | A00015 | $87.1K | IMPLEMENTATION OF MODIFIED FEA ANALYSIS |
| Feb 23, 2022 | A00014 | $240.7K | THRUST BEARING REFURBISHMENT. |
| Nov 16, 2021 | A00013 | $-156.6K | ADDITIONAL WELDING |
| Aug 25, 2021 | A00012 | $140.0K | THRUST BEARING REFURBISHMENT |
| Mar 17, 2021 | P00007 | $0 | NAME CHANGE |
| Mar 8, 2021 | A00011 | $150.0K | IMPLEMENTATION OF MODIFIED FEA ANALYSIS |
| Feb 2, 2021 | A00010 | $383.0K | SUSPENSION OF WORK |
| Jan 27, 2021 | A00009 | $14.7K | MODIFIED BRACKET ANALYSIS. |
| Jan 25, 2021 | P00006 | $0 | MODIFICATION TO ADD CLAUSES 52.204-24, 52.204-25 AND 52.204-26. |
| Sep 2, 2020 | A00008 | $6.0K | MODIFIED BRACKET ANALYSIS. |
| Apr 24, 2020 | P00005 | $2.7M | UPPER BEARING BRACKET REPLACEMENT AT LITTLE GOOSE DAM |
| Jul 30, 2019 | A00007 | $18.2K | CONSTRUCTION MODIFICATION A00007 - PRESERVATION OF SHAFT&ENGINEERING EFFORT SPECIFICATION DEVELOPMENT (CR014) |
| May 14, 2019 | A00006 | $20.8K | CONSTRUCTION MODIFICATION A00006 - KAPLAN PIPE REPLACEMENT (CR011) |
| Apr 24, 2019 | A00005 | $41.7K | CLIN 0013 PHASE TWO INSPECTION (CR008)(A00005) |
| Mar 21, 2019 | A00004 | $14.0K | BRAKE PISTON RE-PLATING (CR010)(A00004) |
| Mar 20, 2019 | A00003 | $76.9K | TGB SHAFT AND OIL HEAD BUSHINGS (CR001)(A00003) |
| Oct 30, 2018 | A00002 | $114.5K | MODIFICATION A00001 - CR003 GENERATOR BRAKE ROTORS |
| Oct 10, 2018 | A00001 | $22.0K | MODIFICATION A00001 - DESCOPE ROTOR SPIDER ARM STRENGTHENERS (CR002); REA - ROTOR LIFTING BEAM (CR005); REA - KAPLAN PIPING REMOVAL (CR007) |
| Jul 20, 2018 | P00004 | $27.9K | IGF::OT::IGF EXERCISE OPTION CLINS 0018 $ 0019 |
| May 1, 2018 | P00003 | $411.4K | IGF::OT::IGF PRE-DISASSEMBLY OPERATIONAL TESTING |
| Apr 13, 2018 | P00002 | $114.6K | IGF::OT::IGF SOLE SOURCE OUT OF SCOPE MODIFICATION TO REPAIR AND LOAD TEST LIFTING BEAMS |
| Feb 9, 2018 | P00001 | $3.4M | IGF::OT::IGF INCREMENTAL FUNDING MOD |
| Sep 27, 2017 | 0 | $50.0K | IGF::OT::IGF DISASSEMBLY OF UNIT 5, REPAIR THE ROTOR SPIDER, FEA ANALYSIS, TURBINE SEALS |