Federal contract award

W912EF18C0001

IGF::OT::IGF REPLACEMENT OF MAIN UNIT GENERATOR TURBINE RUNNERS IN UNITS 1-14 AT MCNARY DAM POWERHOUSE, UMATILLA, OREGON, INCLUDING REWIND OF 3 MAIN UNIT GENERATORS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeUS ARMY ENGINEER DISTRICT WALLA WAL
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2KA — REPAIR OR ALTERATION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT
Obligations$159.3M
Current contract value$424.6M
Potential contract value / ceiling$1.0B
Start dateMar 30, 2018
Current end dateMar 17, 2036
Potential end dateMar 17, 2036
Latest award activityMay 7, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 46 of 46 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 7, 2026P00034$842.2KMCNARY TURBINE REPLACEMENT, UNITS 1-14
Mar 11, 2026A00010$0MCNARY TURBINE REPLACEMENT, UNITS 1-14
Feb 6, 2026P00033$42.7KCONSTRUCTION PROJECT: MCNARY TURBINE REPLACEMENT, UNITS 1-14 SUPPLEMENTAL MODIFICATION CR026 - GENERATOR MAIN AND NEUTRAL LEADS
Dec 5, 2025A00009$0A00009 CR019 MILESTONE ADJUSTMENTS & NTP EXT
Nov 20, 2025P00032$66.6MMNA TURBINE REPLACEMENT EXERCISE AND FULLY FUND OPTIONAL CLINS 1104, 1106AB, 1107AB, & 1108AB AND ADD FY 26 FUNDING.
Oct 21, 2025P00031$65.2KMNA TURBINE REPLACEMENT MODIFICATION F4 CFD EXTENSION (CR048)
Jul 17, 2025P00030$310.9KMNA TURBINE REPLACEMENT, UNITS 1-14 - ADJUSTABLE HUB SHIPPING MODIFICATION
Jun 18, 2025A00008$36.4KTURBINE SHAFT SEAL - ADJ BLADE UNITS
Jun 4, 2025P00029$2.9MMNA TURBINE REPLACEMENT UNITS 1-14 - MODIFICATION
Mar 31, 2025PP0001$0IMPLEMENT EXECUTIVE ORDER 14148 INITIAL RESCISSIONS OF HARMFUL EXECUTIVE ORDERS AND ACTIONS AND CLASS DEVIATION 2025-O0004-REVOCATION OF EXECUTIVE ORDER ON SUSTAINABILITY
Mar 17, 2025P00028$37.4MEXERCISE AND FULLY FUND OPTION CLINS 4102, 4103, 4105 & 7102. ALSO TO ADD FY 25 INCREMENTAL FUNDING.
Dec 23, 2024P00027$4.1MMNA SUPPLY AND INSTALL BLADE WATER LUBRICATED TURBINE GUIDE BEARING SYSTEM (BEARING TO SKID)
Nov 26, 2024P00026$11.8MMNA HYDRAULIC DESIGN CHANGES
Nov 15, 2024A00007$0REASSEMBLY OF ADJUSTABLE BLADE UNITS
Nov 14, 2024P00025$2.1M2018 SUSPENSION COST IMPACT MODIFICATION
Oct 24, 2024P00024$1.8MMODIFICATION TO SUPPORT CLIN 3012 CHANGES.
Jul 16, 2024P00023$170.7KREASSEMBLY OF ADJUSTABLE BLADE UNITS
Jun 21, 2024P00022$247.0KEXERCISE OPTION CLIN 3104
May 17, 2024P00021$82.1KEXERCISE OPTION CLINS 1106, 1107, AND 1108
Feb 6, 2024A00006$229.2KREASSEMBLY OF ADJUSTABLE BLADE UNITS
Jan 12, 2024P00020$14.4MINCREMENTAL FUNDING FOR MCNARY TURBINE REPLACEMENT, UNITS 1-14, W912EF18C0001
Dec 11, 2023P00019$12.8KMNA TURBINE REPLACEMENT UNITS 1-14, CR018 COUPON REMOVAL DELAY-BLADE/HUB
Nov 16, 2023P00018$791.7KEXERCISE OPTIONAL CLIN 6101
Oct 27, 2023A00005$0REASSEMBLY OF ADJUSTABLE BLADE UNITS
Sep 12, 2023P00017$0MODIFICATION TO UPDATE OPTIONAL CLIN TRIGGER & PAYMENT TERMS AND ASSOCIATED TECHNICAL SPECIFICATIONS.
May 5, 2023P00016$2.9MEXERCISE OPTIONAL CLINS 2106, 3108, 3114, AND 3115 AND INCREMENTALLY FUND CLINS 2005AC AND 2006AC.
Apr 11, 2023P00015$0ACTIVATION OF CLINS 2005AC AND 2006AC, MCNARY TURBINE REPLACEMENT, UNITS 1-14
Mar 27, 2023P00014$3.5MINCREMENTAL FUNDING ACTION, MCNARY TURBINE REPLACEMENT, UNITS 1-14
Mar 22, 2023P00013$205.5KMCNARY TURBINE REPLACEMENT UNITS 1-14, CR004 U13 & U14 SPRING BED TB DESIGN
Mar 14, 2023P00012$788.0KCR014 ADJUSTABLE BLADE WATER LUBRICATED TURBINE GUIDE BEARING DESIGN, MODIFICATION TO MCNARY TURBINE REPLACEMENT CONTRACT.
Mar 18, 2022P00011$77.7KMCNARY TURBINES EXERCISE OPTIONAL CLINS 1103 AND 1105.
Nov 17, 2021P00010$1.8MINCREMENTAL FUNDING ACTION, MCNARY TURBINE REPLACEMENT, UNITS 1-14
Sep 10, 2021A00004$0CLIN MODIFICATIONS IN RESPONSE TO P00009 (CR006)(A00004)
Jun 10, 2021P00009$195.1KMCNARY TURBINE EXERCISE OPTIONAL CLIN 1110
Apr 19, 2021P00008$641.0KMCNARY TURBINE REPLACEMENT FUNDING MODIFICATION
Apr 1, 2021A00003$32.7KIHC ADAPTATION STUDY (CR005)(A00003)
Mar 18, 2021P00007$72.2KTHIS MODIFICATION EXERCISES OPTIONAL LINE ITEMS 2102 AND 2103 TO ACCOMMODATE THE NEW RUNNER DESIGN AND NEW OUTER AND INTERMEDIATE HEADCOVER DESIGN.
Mar 17, 2021P00006$0NAME CHANGE
Nov 5, 2020A00002$0DRAFT TUBE DESIGN ITERATION A-3 (CR003)(A00002)
Nov 2, 2020P00005$1.7MINCREMENTAL FUNDING MODIFICATION, MCNARY TURBINE REPLACEMENTS, UNITS 1-14
Oct 14, 2020P00004$0REASSEMBLY OF ADJUSTABLE BLADE UNITS
Aug 25, 2020P00003$546.9KINCREMENTAL FUNDING, W912EF18C0001, MCNARY TURBINE REPLACEMENT, UNITS 1-14
May 13, 2020A00001$0RFI-0011 (CR002)(A00001)
Oct 25, 2019P00002$219.7KCFD DESIGN DEVELOPMENT - MCNARY TURBINE REPLACEMENT, UNITS 1-14
Jun 24, 2019P00001$898.8KCONTRACT MODIFICATION TO PROVIDE ADDITIONAL INCREMENTAL FUNDING FOR CONTRACT LINE ITEMS 1002 AND 1003.
Mar 21, 20180$1.2MIGF::OT::IGF REPLACEMENT OF MAIN UNIT GENERATOR TURBINE RUNNERS IN UNITS 1-14 AT MCNARY DAM POWERHOUSE, UMATILLA, OREGON, INCLUDING REWIND OF 3 MAIN UNIT GENERATORS.

Estimated positioning window

Mar 17, 2035 – Sep 17, 2035

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2036-03-17 (3424 days from calculation)
+5 points
30 historical awards in this buyer and category group
+15 points
46 recorded award transactions
+10 points
Latest award action: 2026-05-07
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.