Federal contract award

W912EF23C0004

MCNARY LOCK AND DAM DRAINAGE, UNWATERING AND EQUALIZATION (DUE) SYSTEM REHABILITATION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeUS ARMY ENGINEER DISTRICT WALLA WAL
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2KA — REPAIR OR ALTERATION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$15.6M
Current contract value$15.6M
Potential contract value / ceiling$15.6M
Start dateJan 24, 2023
Current end dateJan 26, 2026
Potential end dateJan 26, 2026
Latest award activityJan 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jan 28, 2026A00022$51.8KREA ADDITIONAL ELECTRICAL COSTS CONTRACT FOR MNA DRAINAGE UNWATERING EQUALIZATION SYSTEM REHABILITATION AT MCNARY LOCK AND DAMREFERENCE NO. A00022
Oct 28, 2025A00021$-325.7KCR026 DESCOPE EL 207 GALLERY VALVES UNITS 1-12 CR038 DP4 ANALYSIS REA
Sep 25, 2025P00007$397.7KMNA - DRAINAGE HEADER CLEANOUT
Sep 25, 2025P00008$540.6KMNA - SUCTION PIPING UW PUMPS 2&3
Sep 2, 2025A00020$188.1KVALVE STAND FLOOR OPERATORS
Aug 7, 2025A00019$24.5KALARM TERMINAL DETAILS
Jun 17, 2025A00018$143.9KREA LEAD CONTAMINATION
Jun 16, 2025A00017$34.9KPIPING ISOLATION & FARVAL SIGHT GLASSES
Apr 29, 2025A00016$138.9KUW PUMP INTAKE SCREEN & EL 176 CLEANOUT
Apr 8, 2025P00006$725.7KMNA - DRAINAGE HEADER VIDEO ACCESS
Feb 6, 2025A00015$225.0KCR001-2 ELECTRICAL MECHANICAL DESIGN CHANGES (DEFIN) CR0022-3 SS PENSTOCK DRAIN VALVES (DEFIN)
Jan 16, 2025P00005$614.3KMNA - UNWATERING PUMP AND DRAINAGE PUMP SYSTEM
Oct 15, 2024P00004$6.7MBPA INCREMENTAL FUNDING APPLIED TO CONTRACT.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.