Federal contract award

W912EF25FA010

THE PURPOSE OF THIS PROJECT IS TO REPLACE FAILED ORIGINAL COPPER WATERSTOPS AT TWO CONCRETE MONOLITH JOINTS. LOCATIONS FOR REPLACEMENT WATERSTOPS ARE THE ERECTION BAY/SERVICE BAY (EB/SB) JOINT AND THE SOUTH NON-OVERFLOW (SNOF) MONOLITH 7/8 JOINT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeUS ARMY ENGINEER DISTRICT WALLA WAL
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2KA — REPAIR OR ALTERATION OF DAMS
Parent award / vehicleW912EF23D0025
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$0
Current contract value$422.6K
Potential contract value / ceiling$422.6K
Start dateAug 1, 2025
Current end dateOct 1, 2025
Potential end dateOct 1, 2025
Latest award activityAug 4, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 4, 2025P00001$-422.6KTHE PURPOSE OF THIS PROJECT IS TO REPLACE FAILED ORIGINAL COPPER WATERSTOPS AT TWO CONCRETE MONOLITH JOINTS. LOCATIONS FOR REPLACEMENT WATERSTOPS ARE THE ERECTION BAY/SERVICE BAY (EB/SB) JOINT AND THE SOUTH NON-OVERFLOW (SNOF) MONOLITH 7/8 JOINT.
Jul 28, 20250$422.6KTHE PURPOSE OF THIS PROJECT IS TO REPLACE FAILED ORIGINAL COPPER WATERSTOPS AT TWO CONCRETE MONOLITH JOINTS. LOCATIONS FOR REPLACEMENT WATERSTOPS ARE THE ERECTION BAY/SERVICE BAY (EB/SB) JOINT AND THE SOUTH NON-OVERFLOW (SNOF) MONOLITH 7/8 JOINT.