Federal contract award

W912EP21C0023

COMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW074 ENDIST JACKSNVLLE
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1KA — CONSTRUCTION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$178.8M
Current contract value$178.8M
Potential contract value / ceiling$178.8M
Start dateOct 15, 2021
Current end dateNov 20, 2027
Potential end dateNov 20, 2027
Latest award activityMay 21, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 90 of 90 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 12, 2026P00025$0COMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Jun 8, 2026A00064$-154.6KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
May 21, 2026A00063$350.5KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
May 20, 2026A00062$485.4KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
May 7, 2026P00024$17.6MCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Apr 20, 2026A00061$164.0KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Apr 1, 2026P00023$544.0KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Mar 30, 2026P00022$2.9MCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Mar 19, 2026A00060$147.4KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Mar 12, 2026A00059$410.2KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Feb 27, 2026A00058$97.4KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Feb 10, 2026P00021$994.7KCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Dec 10, 2025P00020$0ADMINISTRATIVE MODIFICATION TO REMOVE RMS PICTURES/TABLES SO THAT CONTRACT AWARD CAN MIGRATE INTO NEW ARMY CONTRACT WRITING SYSTEM (ACWS).
Oct 16, 2025P00019$-840.0KWW075 DESCOPE OPTION A
Oct 9, 2025A00057$-25.2KWW088 S-451 LEAKAGE TEST VARIANCE
Sep 17, 2025A00056$239.5KA00056 VEQ (FINAL) CLIN 0038, 0039, 0040 CLIN 0053 & 0054 INCREASE WEATHER TIME EXTENSION JUN 2025 - AUG 2025 (WW079, 80, 81, 92, 97)
Aug 22, 2025A00055$349.8KA00055 - WW069 COMMUNICATIONS CHANGES
Aug 7, 2025P00018$4.2MVEQ (INT) CLIN 0041 & 0088 (WW077 & WW082)
Aug 5, 2025P00017$-4.2MVEQ (INT) CLIN 0037, 0042, 0043
Jul 22, 2025A00054$304.6KWW072 VEQ (FINAL) EMBANKMENT FOUNDATION PREPARATION
Jul 8, 2025A00053$49.5KRANDOM AND SELECT FILL
Jun 26, 2025P00016$633.2KWW074 CLIN 0027 UTILITY INC (FPL INV #3)
Jun 17, 2025A00052$0WW085 WEATHER TIME EXT FEB 25 - MAY 25
Jun 13, 2025P00015$0IRLS C-23/C-24 STA - CLAUSES UPDATE MOD TO IMPLEMENT EXECUTIVE ORDER 14173.
May 21, 2025P00014$7.1MDEFINITIZATION P00009 EMB FILL >115% CONTRACT FOR 114470 FY21 COMPREHENSIVE EVERGLADES RESTORATION PLAN (CERP), INDIAN RIVER LAGOON SOUTH C-23/24 STORMWATER TREATMENT AREA, ST. LUCIE COUNTY, FLORIDA
May 15, 2025P00013$560.3KWW054 STRUCTURE HANDRAILS
Apr 30, 2025P00012$0DEFINITIZATION DUE DATE EXTENSION OF P00009 TO MAY 20, 2025
Apr 10, 2025A00051$120.0KWW070 VEQ (FINAL) CLIN 0057
Mar 20, 2025A00050$167.7KWW059 PERMANENT POWER REVISIONS
Feb 27, 2025A00049$0WW068 WEATHER TIME EXTENSION NOV 24 - JAN 25
Jan 23, 2025P00011$0DEFINITIZATION DUE DATE EXTENSION OF P00009
Jan 22, 2025A00048$301.9KWW063 VEQ (INT) CLIN 0041 SOD TO 115%
Dec 31, 2024P00010$1.1MWW062 VEQ (INTERIM) CLIN 0034 TO 115%
Dec 5, 2024A00047$0WEATHER TIME EXTENSION OCTOBER 2024
Nov 25, 2024A00046$278.2KWW053 UNDERGROUND ELECTRICAL S-432 A/B
Oct 22, 2024A00045$183.4KWW051 CONTROL BUILDING HOODS
Oct 16, 2024A00044$0WW065 WEATHER TIME EXTENSION FEB 2024 - SEP 2024
Sep 30, 2024P00009$994.5KWW057 NTP VEQ (INT) EMBANKMENT FILL OVER 115%
Sep 16, 2024A00043$118.2KWW050 S-450 ELECTRICAL CONDUIT
Aug 26, 2024A00042$107.9KWW052 CONTROL BUILDING ANTENNA PAD CHANGES
Aug 20, 2024A00041$7.7KWW056 CONCRETE PILE INTEGRITY TESTING
Jul 25, 2024A00040$211.7KWW058 VEQ (INTERIM) CLIN 0040
Jul 23, 2024P00008$974.0KWW047 VEQ (INTERIM) CLIN 0036
Jul 1, 2024A00039$0WW055 SHELLROCK VARIANCE
Jun 6, 2024P00007$-1.5MWW046 VEQ (INTERIM) CLIN 0037
May 17, 2024P00006$529.3KWW048 S-425 AFTERBAY RIPRAP
Apr 22, 2024A00038$-20.1KRANDOM AND SELECT FILL
Apr 11, 2024A00037$-6.5KCR 609 DRAINAGE DITCH RE-GRADING
Mar 26, 2024A00036$0UPDATES TO SPECIFICATION 01 22 00
Mar 1, 2024A00035$0WEATHER TIME EXTENSION NOV 23 - JAN 24
Nov 28, 2023A00034$44.0KTELECOMMUNICATION WIRING DIAGRAM CHANGES
Nov 27, 2023A00033$0WEATHER TIME EXTENSION SEP 23 - OCT 23
Nov 1, 2023A00032$15.1KREA-003 S-432B SHEETPILE EMBED SPALL
Oct 26, 2023A00030$16.3KREA-002 S-425 SHEETPILE EMBED SPALL
Oct 26, 2023A00031$3.1KREA-004 POTENTIAL DSC CELL 1 COLLECTION
Sep 29, 2023P00005$4.4MWW020 ESA 2 RING LEVEE
Sep 21, 2023A00029$-936VEQ (FINAL) CLIN 0068 & 0069
Sep 14, 2023A00028$0WEATHER TIME EXTENSION AUG 23 - AUG 23
Aug 30, 2023A00027$0RANDOM AND SELECT FILL
Aug 21, 2023P00004$840.0KEXERCISE OPTION
Aug 2, 2023A00026$177.9KA00026 (WW026) SHEETPILE EMBEDS ADJUSTMENTS
Jul 27, 2023A00025$250.2KRANDOM AND SELECT FILL
Jun 21, 2023A00023$29.0KRANDOM AND SELECT FILL
Jun 21, 2023A00024$0RANDOM AND SELECT FILL
May 8, 2023A00022$0RANDOM AND SELECT FILL
Apr 12, 2023A00021$17.4KRANDOM AND SELECT FILL
Apr 11, 2023A00020$0RANDOM AND SELECT FILL
Apr 6, 2023A00019$0WW013 FPL POLE SWALE ACC. REV. RFI-0021
Mar 28, 2023A00018$0RANDOM AND SELECT FILL
Mar 7, 2023A00017$0RANDOM AND SELECT FILL
Feb 9, 2023A00016$0RANDOM AND SELECT FILL
Feb 8, 2023A00014$150.0KRANDOM AND SELECT FILL
Feb 8, 2023A00015$0RANDOM AND SELECT FILL
Dec 14, 2022A00013$0RANDOM AND SELECT FILL
Nov 29, 2022A00012$0RANDOM AND SELECT FILL
Nov 28, 2022A00011$17.0KRANDOM AND SELECT FILL
Nov 9, 2022A00010$-25.1KMODIFICATION A00010 (WW017) DRY BENTONITE (VARIANCE)
Oct 5, 2022A00009$126.5KVEQ (FINAL) CLIN 0032 CONNECTION CANAL
Sep 23, 2022P00003$-62.2KMODIFICATION FOR STRIPPING AND EMBANKMENT FOUNDATION EXCAVATION
Sep 12, 2022A00008$5.1KREA-001 DRAINAGE STRUCTURES DIMENSIONS
Sep 9, 2022A00007$99.0KMOD FOR FIELD OFFICE INTERNET AND PHONE SERVICES FOR IRLS C-23/24 CONTRACT
Aug 15, 2022A00006$0SPECIFICATION SECTION 01 35 26 CHANGES
Aug 9, 2022A00005$246.2KGOPHER TORTOISE RELOCATION
Aug 5, 2022A00004$0MISC. PLAN CLARIFICATIONS
Jul 22, 2022A00003$0MOD ISSUED FOR ELIMINATION PERPENDICULAR PRE TRENCHING
Jul 20, 2022A00002$0MOD ISSUED FOR FDOT PRESTRESSED PILES (VARIANCE)
Mar 17, 2022A00001$0MOD ISSUED FOR TYPICAL SECTION DIMENSIONS C-160 & C-161
Mar 14, 2022P00002$303.7KMOD ISSUED FOR CONTRACTING OFFICER'S FIELD OFFICE EXPANSION
Oct 27, 2021P00001$0NOTICE TO PROCEED FOR COMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA
Sep 28, 20210$136.6MCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON - SOUTH, C-23/24 STORMWATER TREATMENT AREA ST LUCIE COUNTY, FLORIDA

Estimated positioning window

Nov 20, 2026 – May 20, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-11-20 (391 days from calculation)
+25 points
2 historical awards in this buyer and category group
+10 points
90 recorded award transactions
+10 points
Latest award action: 2026-05-21
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.