Federal contract award

W912EP23C0005

CENTRAL EVERGLADES PLANNING PROJECT (CEPP) SOUTH CONTRACT 1A(R), L-67A STRUCTURES (S-631, S-632, AND S-633) SPOIL PILE REMOVAL AND AGRICULTURAL DITCH BACKFILL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW074 ENDIST JACKSNVLLE
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$66.9M
Current contract value$66.9M
Potential contract value / ceiling$66.9M
Start dateDec 19, 2022
Current end dateMar 28, 2027
Potential end dateMar 28, 2027
Latest award activityMay 5, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 20 of 20 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 5, 2026A00011$25.5KCEPP SOUTH CNT 1A(R)
Dec 5, 2025A00010$84.7KEXCAVATION
Sep 25, 2025P00008$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT FUNDING SOURCE FOR MODIFICATION P00007. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 19, 2025A00009$0EXCAVATION
Sep 16, 2025P00007$2.6MRR017 CLAIMS 001-004 SETTLEMENT
Sep 8, 2025P00006$975.0KRR014 VEQ ROCK EXCAVATION 115%
Aug 4, 2025P00005$-277.8KVECP CNT1 L67A TURN-AROUND
Jun 11, 2025A00008$11.8KEXCAVATION
May 30, 2025A00007$-41.6KEXCAVATION
May 22, 2025A00006$18.1KEXCAVATION
May 14, 2025A00005$0EXCAVATION
Apr 17, 2025A00004$9.1KEXCAVATION
Feb 13, 2025A00003$175.3KEXCAVATION
Nov 8, 2024A00002$0EXCAVATION
Aug 12, 2024P00004$0RR005 COFFERDAM TRANSMITTALS (REA-001).
Aug 2, 2024A00001$493.6KRR004 S-633 WEST COFFERDAM TEST SECTION EXCAVATION.
Aug 4, 2023P00003$0FUNDING ONLY MODIFICATION
May 8, 2023P00002$22.5MEXCAVATION
Feb 3, 2023P00001$0NOTICE TO PROCEED (NTP) FOR LINE ITEMS 0001 THROUGH 0057.
Dec 19, 20220$42.3MCENTRAL EVERGLADES PLANNING PROJECT (CEPP) SOUTH CONTRACT 1A(R), L-67A STRUCTURES (S-631, S-632, AND S-633) SPOIL PILE REMOVAL AND AGRICULTURAL DITCH BACKFILL

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-03-28 (154 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
20 recorded award transactions
+10 points
Latest award action: 2026-05-05
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.