Federal contract award

W912EP24C0021

COMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON SOUTH, C-23/C-24 NORTH RESERVOIR, S-426, CONTRACT 4A PROJECT, ST. LUCIE COUNTY, FLORIDA.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW074 ENDIST JACKSNVLLE
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1KB — CONSTRUCTION OF CANALS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$196.0M
Current contract value$196.0M
Potential contract value / ceiling$196.0M
Start dateOct 15, 2024
Current end dateMay 10, 2028
Potential end dateMay 10, 2028
Latest award activityMay 6, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 30 of 30 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 6, 2026A00024$-59.9KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Apr 29, 2026A00023$24.0KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Apr 27, 2026A00022$20.3KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Apr 20, 2026A00021$214.2KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Mar 24, 2026A00020$63.1KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Mar 3, 2026A00018$337.2KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Mar 3, 2026A00019$110.3KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Feb 27, 2026A00017$198.0KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Feb 25, 2026A00016$28.6KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Feb 5, 2026A00015$90.0KIRL-S C-23/24 NORTH RESERVOIR S-426 CNT 4A
Dec 5, 2025A00013$287.7KWR019 MUCK AREA ACCESS ROAD MITIGATION
Dec 5, 2025A00014$498.4KWR010 REVISION OF PUMP STATION CONTROL SHEETS
Dec 1, 2025A00012$23.9KWR023 (REA-001), WR024 (REA-002), WR025 (REA-003), WR027 (REA-004)
Nov 18, 2025A00011$-39.6KWR017 BENTONITE CHIP VARIANCE
Oct 27, 2025A00010$27.3KWR026 PERMANENT POWER CONDUIT INSTALLATION
Oct 1, 2025P00005$0NTP PHASE III
Sep 29, 2025P00004$702.0KWR012 - INTERIM VEQ FOR CLIN 0056 EXISTING CANALS AND DITCHES EXCAVATION
Sep 25, 2025A00009$62.3KWR015& WR016 - G-791 & PC-37 JOINT REVISIONS/WEATHER TIME EXT. JUL - AUG
Sep 4, 2025A00008$19.1KWR0011 - SWITCH BOX ACCESS ROAD
Aug 20, 2025A00007$109.9KWR009 VERTICAL PUMPS MISC. ADJUSTMENTS
Jul 31, 2025A00006$0WR014 TIME EXTENSION JAN 25- JUN 25
Jun 12, 2025A00005$33.3KWR001 PC-37 & G-791 REINFORCEMENT
Jun 12, 2025P00003$0S-426 CIP CONCRETE AND REINFORCEMENT -- CLAUSES UPDATE MOD TO IMPLEMENT EXECUTIVE ORDER 14173
Jun 4, 2025A00004$4.5KWR005 ROW DESCOPE & RELOCATION
Jun 3, 2025A00003$188.6KWR007 PARTNERING EXTENSIONS
Apr 24, 2025P00002$0PARTIAL NTP TO BEGIN WORK UNDER THE SUBJECT CONTRACT FOR PHASE 3 ON CLIN 0004 G-791 UNGATED CULVERT.
Apr 17, 2025A00002$95.5KWR002 ADDITIONAL FENCING
Mar 14, 2025A00001$0WR003 BORROW SHIFT /WR006 EM-385-1-1 UPDATE
Oct 29, 2024P00001$0S-426 CIP CONCRETE AND REINFORCEMENT
Sep 30, 20240$192.8MCOMPREHENSIVE EVERGLADES RESTORATION PLAN, INDIAN RIVER LAGOON SOUTH, C-23/C-24 NORTH RESERVOIR, S-426, CONTRACT 4A PROJECT, ST. LUCIE COUNTY, FLORIDA.

Estimated positioning window

May 10, 2027 – Nov 10, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-05-10 (556 days from calculation)
+25 points
9 historical awards in this buyer and category group
+15 points
30 recorded award transactions
+10 points
Latest award action: 2026-05-06
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.