Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST MEMPHIS
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1QA — CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$25.1M
Current contract value$25.1M
Potential contract value / ceiling$25.1M
Start dateApr 15, 2022
Current end dateDec 19, 2025
Potential end dateDec 19, 2027
Latest award activityMar 3, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 16 of 16 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 3, 2026A00011$26.6KTHIS CHANGE PROVIDES FOR THE MOBILIZATION AND OPERATION OF A LARGER VIBRATORY HAMMER FOR EXTRACTION OF CONFLICTING SHEETS AT THESE TWO LOCATIONS.
Jan 29, 2026P00003$0REINFORCED CONCRETE FLOODWALL
Jan 29, 2026P00004$0REINFORCED CONCRETE FLOODWALL
Jan 28, 2026P00002$0REINFORCED CONCRETE FLOODWALL
Jul 29, 2025A00010$0PROVIDE A TIME EXTENSION FOR DELAYS IN COMPLETING THE WORK ARISING FROM UNFORESEEABLE CAUSES BEYOND THE CONTROL AND WITHOUT THE FAULT OR NEGLIGENCE OF THE CONTRACTOR.
May 15, 2025A00009$0MODIFICATION IS NECESSARY TO INCREASE THE CONTRACT PERIOD OF PERFORMANCE BY 45 CALENDAR DAYS TO ACCOUNT FOR EXCUSABLE DELAYS TO THE CONTRACT WORK RESULTING FROM UNUSUALLY SEVERE WEATHER OCCURRING DURING THE PERIOD1 DECEMBER 2024 THROUGH 31 MARCH 2025
Mar 26, 2025A00008$0THIS CHANGE IS TO EFFECT AGREEMENTS MADE ON PRICE AND TIME REQUIRED TO REVISE THE ORIGINAL CROSS SECTION, UNIT PRICE, AND AREA OF ASPHALT PAVEMENT ASSOCIATED WITH CLIN 0013 AND INCREASING THE AREA OF CONCRETE SLOPE PAVING ASSOCIATED WITH CLIN 0023.
Dec 17, 2024A00007$0WEATHER TIME EXTENSION MAY-NOV 24. CONTRACT FOR REINFORCED CONCRETE FLOODWALL.
Dec 12, 2024A00006$9.0KTHIS CHANGE IS NECESSARY TO LOWER MANHOLE LID ELEVATION TO FINISH GRADE.
Jun 27, 2024A00005$0THIS MODIFICATION IS NECESSARY TO INCREASE THE CONTRACT PERIOD OF PERFORMANCE BY 50 CALENDAR DAYS TO ACCOUNT FOR EXCUSABLE DELAYS TO THE CONTRACT WORK RESULTING FROM UNUSUALLY SEVERE WEATHER.
Jan 8, 2024A00004$0THIS MODIFICATION IS NECESSARY TO INCREASE THE CONTRACT PERIOD OF PERFORMANCE BY 12 CALENDAR DAYS TO ACCOUNT FOR EXCUSABLE DELAYS TO THE CONTRACT WORK RESULTING FROM UNUSUALLY SEVERE WEATHER THE PERIOD OF 1 OCTOBER 2022 THROUGH 30 NOVEMBER 2023.
Nov 17, 2023A00003$85.5KTHIS CONTRACT IS FOR CARUTHERSVILLE FLOODWALL REPLACEMENT, PEMISCOT COUNTY, MO, CONTRACT NO. W912EQ22C0013. THIS MODIFICATION PROVIDES FOR WORK PERFORMED UNDER THE POWERLINES NOT SHOWN ON THE CONTRACT DRAWINGS.
Nov 14, 2023A00002$14.5KTHIS CHANGE IS NECESSARY TO COMPENSATE FOR THE UNFORESEEN COSTS AND DELAYS INCURRED BY HAVING TO REMOVE THE ADDITIONAL MATERIAL. THE STRUCTURES ELEVATIONS AND GRADES SHOWN ON THE DRAWINGS SHALL NOT BE CHANGED.
Jun 5, 2023A00001$311.5KCONTRACT FOR CARUTHERSVILLE FLOODWALL REPLACEMENT, ST. FRANCIS LEVEE DISTRICT OF MISSOURI, PEMISCOT COUNTY, MO, MISSISSIPPI RIVER LEVEE-CONSTRUCTION. MODIFICATION FOR RALPH CLAYTON ROAD PAVING & WATERSTOP.
Aug 16, 2022P00001$0REINFORCED CONCRETE FLOODWALL
Apr 15, 20220$24.6MREINFORCED CONCRETE FLOODWALL

Estimated positioning window

Dec 19, 2026 – Jun 19, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-12-19 (413 days from calculation)
+25 points
2 historical awards in this buyer and category group
+10 points
16 recorded award transactions
+10 points
Latest award action: 2026-03-03
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.