Federal contract award
W912EQ24C0002
THIS PROJECT CONSIST OF RIPRAP ARMORING OF BANKS AND CHANNEL OF APPROXIMATELY 400FT OF THE ST JOHNS BAYOU DITCH BELOW THE ST. JOHNS CULVERT STRUCTURE UPSTREAM OF THE CONFLUENCE WITH MUD DITCH.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W07V ENDIST MEMPHIS |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $4.0M |
| Current contract value | $4.0M |
| Potential contract value / ceiling | $4.0M |
| Start date | Dec 15, 2023 |
| Current end date | Sep 30, 2025 |
| Potential end date | Sep 30, 2027 |
| Latest award activity | May 8, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 8, 2025 | A00006 | $-132.7K | MODIFICATION TO THIS CONTRACT IS NECESSARY TO REVISE ESTIMATED QUANTITIES TO REFLECT ACTUAL QUANTITIES USED. |
| Apr 15, 2025 | A00005 | $188.6K | REVISE CERTAIN ESTIMATED QUANTITIES TO REFLECT THE CURRENT BEST ESTIMATE OF QUANTITIES REQUIRED TO COMPLETE THE WORK. THIS MODIFICATION IS FOR FUNDING AND PAYMENT PURPOSES ONLY AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES. |
| Mar 25, 2025 | P00001 | $713.3K | STREAMBED AND CHANNEL SLOPE EROSION HAS OCCURRED SINCE DESIGN SURVEYS WERE PERFORMED WHICH REQUIRES FIELD CHANGES TO THE ORIGINAL DESIGN. ADDITIONAL STONE PROTECTION MATERIALS ARE REQUIRED TO MEET DESIGN INTENT. |
| Jan 10, 2025 | A00004 | $0 | THIS MODIFICATION IS NECESSARY TO INCREASE THE CONTRACT PERIOD OF PERFORMANCE BY 92 CALENDAR DAYS TO ACCOUNT FOR EXCUSABLE DELAYS TO THE CONTRACT WORK RESULTING FROM LOW CHANNEL STAGES. |
| Nov 4, 2024 | A00003 | $0 | EXTEND PERIOD OF PERFORMANCE AT NO FAULT OF CONTRACTOR. |
| Oct 3, 2024 | A00002 | $0 | THIS MODIFICATION IS TO CORRECT THE CONTRACT COMPLETION DATE IN THE CONTRACTING WRITING SYSTEMS CONTRACT ACTION REPORT (CAR) TO JANUARY 3, 2025. THIS IS AN ADMINISTRATIVE ACTION AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES. |
Estimated positioning window
Nov 1, 2026 – Mar 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-09-30 (333 days from calculation)
- +35 points
- 13 historical awards in this buyer and category group
- +15 points
- 6 recorded award transactions
- +10 points
- Latest award action: 2025-05-08
- +0 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.