Federal contract award

W912EQ24C0002

THIS PROJECT CONSIST OF RIPRAP ARMORING OF BANKS AND CHANNEL OF APPROXIMATELY 400FT OF THE ST JOHNS BAYOU DITCH BELOW THE ST. JOHNS CULVERT STRUCTURE UPSTREAM OF THE CONFLUENCE WITH MUD DITCH.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST MEMPHIS
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$4.0M
Current contract value$4.0M
Potential contract value / ceiling$4.0M
Start dateDec 15, 2023
Current end dateSep 30, 2025
Potential end dateSep 30, 2027
Latest award activityMay 8, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 8, 2025A00006$-132.7KMODIFICATION TO THIS CONTRACT IS NECESSARY TO REVISE ESTIMATED QUANTITIES TO REFLECT ACTUAL QUANTITIES USED.
Apr 15, 2025A00005$188.6KREVISE CERTAIN ESTIMATED QUANTITIES TO REFLECT THE CURRENT BEST ESTIMATE OF QUANTITIES REQUIRED TO COMPLETE THE WORK. THIS MODIFICATION IS FOR FUNDING AND PAYMENT PURPOSES ONLY AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES.
Mar 25, 2025P00001$713.3KSTREAMBED AND CHANNEL SLOPE EROSION HAS OCCURRED SINCE DESIGN SURVEYS WERE PERFORMED WHICH REQUIRES FIELD CHANGES TO THE ORIGINAL DESIGN. ADDITIONAL STONE PROTECTION MATERIALS ARE REQUIRED TO MEET DESIGN INTENT.
Jan 10, 2025A00004$0THIS MODIFICATION IS NECESSARY TO INCREASE THE CONTRACT PERIOD OF PERFORMANCE BY 92 CALENDAR DAYS TO ACCOUNT FOR EXCUSABLE DELAYS TO THE CONTRACT WORK RESULTING FROM LOW CHANNEL STAGES.
Nov 4, 2024A00003$0EXTEND PERIOD OF PERFORMANCE AT NO FAULT OF CONTRACTOR.
Oct 3, 2024A00002$0THIS MODIFICATION IS TO CORRECT THE CONTRACT COMPLETION DATE IN THE CONTRACTING WRITING SYSTEMS CONTRACT ACTION REPORT (CAR) TO JANUARY 3, 2025. THIS IS AN ADMINISTRATIVE ACTION AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES.

Estimated positioning window

Nov 1, 2026 – Mar 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-09-30 (333 days from calculation)
+35 points
13 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2025-05-08
+0 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.