Federal contract award
W912EQ24C0010
GRAND PRAIRIE PUMP STATION RE-PROCUREMENT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W07V ENDIST MEMPHIS |
| NAICS | 237110 — Water and Sewer Line and Related Structures Construction |
| PSC | Y1NE — CONSTRUCTION OF WATER SUPPLY FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $26.6M |
| Current contract value | $26.6M |
| Potential contract value / ceiling | $26.6M |
| Start date | Jun 21, 2024 |
| Current end date | Oct 31, 2028 |
| Potential end date | Oct 31, 2028 |
| Latest award activity | May 28, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 19 of 19 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 28, 2026 | A00013 | $193.9K | THIS SOLICITATION IS FOR THE RE-PROCUREMENT OF CONSTRUCTION SERVICES. WORK CONSISTS OF CONSTRUCTION OF THE (BASE BID) PUMP STATION SUPERSTRUCTURE ABOVE ELEVATION 190.0. |
| May 20, 2026 | A00012 | $13.1K | THIS SOLICITATION IS FOR THE RE-PROCUREMENT OF CONSTRUCTION SERVICES. WORK CONSISTS OF CONSTRUCTION OF THE (BASE BID) PUMP STATION SUPERSTRUCTURE ABOVE ELEVATION 190.0. |
| Apr 13, 2026 | A00011 | $15.1K | THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, AND MATERIALS AND ANY INCIDENTAL WORK REQUIRED TO PERFORM HIGH RESOLUTION SCANS OF THE FOUR 84IN DISCHARGE PIPES TO DETERMINE THE CURRENT AS-BUILT CONDITIONS AND PROVIDE A REPORT OF FINDINGS. |
| Mar 23, 2026 | A00010 | $125.6K | THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, AND MATERIALS AND ANY INCIDENTAL WORK REQUIRED TO PERFORM HIGH RESOLUTION SCANS OF THE FOUR 84IN DISCHARGE PIPES TO DETERMINE THE CURRENT AS-BUILT CONDITIONS AND PROVIDE A REPORT OF FINDINGS. |
| Mar 4, 2026 | P00005 | $1.2M | THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, AND MATERIALS AND ANY INCIDENTAL WORK REQUIRED TO PERFORM HIGH RESOLUTION SCANS OF THE FOUR 84IN DISCHARGE PIPES TO DETERMINE THE CURRENT AS-BUILT CONDITIONS AND PROVIDE A REPORT OF FINDINGS. |
| Jan 30, 2026 | A00009 | $12.9K | THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, AND MATERIALS AND ANY INCIDENTAL WORK REQUIRED TO PERFORM HIGH RESOLUTION SCANS OF THE FOUR 84IN DISCHARGE PIPES TO DETERMINE THE CURRENT AS-BUILT CONDITIONS AND PROVIDE A REPORT OF FINDINGS. |
| Dec 4, 2025 | A00008 | $88.8K | CMU BOND BEAM VOIDS CONTRACT FOR GRAND PRAIRIE PUMP STATION REPROCUREMENT AT DEVALLS BLUFF, AR REFERENCE NO. R00011 |
| Nov 18, 2025 | A00007 | $112.5K | PCV CABINET, BATHROOM FLOOR, BUSHING BOX CONTRACT FOR GRAND PRAIRIE PUMP STATION REPROCUREMENT AT DEVALLS BLUFF, AR REFERENCE NO. R00010 |
| Oct 22, 2025 | P00004 | $1.2M | ELECTRICAL RFIS AND MOTOR SYNC CONTRACT FOR GRAND PRAIRIE PUMP STATION REPROCUREMENT AT DEVALLS BLUFF, AR REFERENCE NO. R00009 |
| Sep 26, 2025 | A00006 | $172.5K | GROUNDING DEFICIENCIES CONTRACT FOR GRAND PRAIRIE PUMP STATION REPROCUREMENT AT DEVALLS BLUFF, AR REFERENCE NO. R00008 |
| Sep 24, 2025 | A00005 | $60.0K | PROCUREMENT OF CHILLERS FOR MOTOR COOLING SYSTEM. |
| Aug 7, 2025 | A00004 | $452.3K | MV SWGR, MV MCC, CONDUIT, BUSHING BOX, FLOWMETER CONTRACT FOR GRAND PRAIRIE PUMP STATION REPROCUREMENT AT DEVALLS BLUFF, AR REFERENCE NO. R00006 |
| Jul 23, 2025 | A00003 | $234.0K | DISCHARGE PIPE FLANGE MACHINING |
| Jun 26, 2025 | P00003 | $1.1M | GRAND PUMP STATION REPROCUREMENT MODIFICATION FOR ELEVATOR |
| Jun 20, 2025 | P00002 | $1.3M | GRAND PRAIRIE PUMPING STATION RE-PROCUREMENT |
| May 30, 2025 | A00002 | $30.3K | STOP LOG AND LIFTING BEAM STORAGE RACK CONTRACT FOR GRAND PRAIRIE PUMP STATION REPROCUREMENT AT DEVALLS BLUFF, AR REFERENCE NO. R00003 |
| Mar 12, 2025 | A00001 | $5.7K | GRATING SHIMS AT N VALVE ACCESS CONTRACT FOR GRAND PRAIRIE PUMP STATION REPROCUREMENT AT DEVALLS BLUFF, AR REFERENCE NO. R00001 |
| Sep 20, 2024 | P00001 | $0 | GRAND PRAIRIE PUMPING STATION RE-PROCUREMENT |
| Jun 21, 2024 | 0 | $18.6M | GRAND PRAIRIE PUMP STATION RE-PROCUREMENT |
Estimated positioning window
Oct 31, 2027 – Apr 30, 2028
45/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 45/100. Available recorded signals: 40 points.
- Contract end 2028-10-31 (737 days from calculation)
- +15 points
- 1 historical awards in this buyer and category group
- +0 points
- 19 recorded award transactions
- +10 points
- Latest award action: 2026-05-28
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.