Federal contract award

W912ER18C0004

IGF::OT::IGF SOFA SHIELD 5, QATAR

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW076 ENDIST MIDDLE EAS(PROVIS)
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$312.7M
Current contract value$312.7M
Potential contract value / ceiling$313.9M
Start dateNov 16, 2017
Current end dateJul 8, 2026
Potential end dateJul 8, 2026
Latest award activityMay 8, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 33 of 33 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 8, 2026A00006$0EPIC FURY TIME EXTENSION
Sep 22, 2025P00026$1.9MSITE CIVIL WORK. CONSTRUCT EIGHT ADA MISSILE LAUNCH PADS
Sep 7, 2025A00005$0QF004 WEATHER TIME EXTENSION FEB 25 AND JUL 25
Jul 8, 2025A00004$29.2KCR0059 SITE 1 AND 4A MISCELLANEOUS CHANGES
May 19, 2025A00003$0CHANGE CONTRACT COMPLETION DATE (CCD)
Mar 3, 2025A00002$-257.0KA0002-QA0056 DESCOPE CHAIN-LINK FENCE SITE 4A
Jun 5, 2024P00025$21.8MADDITIONAL BUILDINGS AND SITE WORK ADDED.
Feb 15, 2024P00024$0ROLLING 2019 FUNDING THAT WILL EXPIRE/CANCEL TO ANOTHER NEW CLIN
Nov 16, 2023P00023$22.3MQF001 REA SETTLEMENT PROLONGATION COSTS FOR REA, SHIELD 5 SITE 1 AND 4A, QATAR
Jul 12, 2023P00022$0MODIFICATION IS ISSUED TO ROLL OVER FY14 FUNDING TO NEW FY 19 FUNDING.
Apr 4, 2023P00021$2.4M1. THE PURPOSE OF THIS MODIFICATION TO RECORD THE PAYMENT OF A REQUEST FOR EQUITABLE ADJUSTMENT (REA) AND ADD NEW CLIN 0425 REA SITE CIVIL EARTHWORKS ON CONTRACT W912ER-18-C-0004, SHIELD 5 SITE 1 &4.
Feb 2, 2023A00001$69.9KA00001 CLIMATE CONTROL & PAVILION LADDER - ADDITIONAL COSTS INCURRED FOR TEMPERATURE CONTROLLED STORAGE AND ADDITIONAL COSTS INCURRED DUE TO INSTALLATION OF LADDER TO ACCESS HVAC EQUIPMENT ON PAVILION ROOF.
Jun 24, 2022P00020$2.0MMODIFICATION P00020 IS ISSUED FOR THE NEGOTIATED AGREEMENT OF RFP-0025 CONTINUATION (SITE 4A RECONFIGURATION), RFP-0037 (MV WORKS), RFP-0038 (WATER & SEWAGE REMOVAL), AND RFP-0039 (SITE 4A LAYOUT & S1 ACCESS DOOR FOR FACILITY 402).
Apr 12, 2021P00019$3.2MMODIFICATION P00019 IS ISSUED FOR THE NEGOTIATED AGREEMENT OF RFP-0025 (SITE 4A RECONFIGURATION) AND RFP-0036 (SITE 1, ACCESS DOOR BETWEEN ROOMS BE136A AND BE137A IN FACILITY 402).
Nov 18, 2020P00018$7.2KMODIFICATION P00018 IS ISSUED TO ADD TWO (2) SELF-LATCHING METAL DOORS AT THE RAMPS LEADING TO THE SWIMMING POOL LOCATED AT FACILITY 309, OFFICERS CLUB, ON SITE 1.
Oct 30, 2020P00016$1.1MMISCELLANEOUS CHANGES ISSUED FOR THE NEGOTIATED AGREEMENT OF THE FOLLOWING CHANGES ON SITES 1 AND 4A: RFP-0021 (COP #14) RFP-0031 (NETWORK SWITCHES) RFP-0033 (ARMORED GUARD SHACKS) AND THE ADDITION OF THE PROTECTIVE COVERS FOR THE EMERGENCY POWER OFF (EPO) IN FACILITY 406
Oct 30, 2020P00017$4.1MMODIFICATION P00017 IS ISSUED FOR THE NEGOTIATED AGREEMENT OF THE FOLLOWING CHANGES ON SITE 1: RFP-0022 (PDS) RFP-0028 (FOOTBALL PITCH) RFP-0030 (UTILITY EXTENSION) RFP-0032 (FACILITY 503 VRF TO DX) AND RFP-0034 (BATCH 3) INCLUDING THE POLISHING OF THE GRANITE IN FACILITY 402 ENTRYWAY AND SUPPLYING AND INSTALLING FOUR (4) ACCESS CONTROL WORKSTATIONS WITH SPEED GATE SWITCHES FOR SPEED GATE MONITORING AT FACILITY 402 (THREE WORKSTATIONS) AND 406 (ONE WORKSTATION).
May 7, 2020P00015$8.4MMODIFICATION P00015 IS ISSUED FOR THE NEGOTIATED AGREEMENT OF THE FOLLOWING CHANGES ON SITES 1 AND 4A: RFP-0014 (PROVIDE FLOOR FINISH CHANGES IN VARIOUS FACILITIES AND WALL CHANGES IN FACILITY 401) RFP-0016 (FF&E) RFP-0017 (COP #12) RFP-0018 (COP #11) RFP-0019 (SITE 1 ACCESS) RFP-0020 (MISCELLANEOUS CIVIL WORKS ON SITE 4A) RFP-0023 (QESC REQUIRED CHANGES TO FACILITY 311) RFP-0024 (REF RELAY TO FACILITY 212 SUBSTATIONS) REF-0026 (LED VIDEO WALL IN FACILITY 402) RFP-0027 (SEVEN ADDITIONAL TELECOMMUNICATION LINES IN FACILITY 406) RFP-0028 (MISCELLANEOUS QEADF REQUESTED CHANGES (BATCH 1)) AND RFP-0029 ((MISCELLANEOUS QEADF REQUESTED CHANGES (BATCH 2)).
Dec 30, 2019P00014$5.0MMODIFICATION P00014 IS TO ADD THE REQUIREMENT FOR A DESIGN/BUILD OF A MOSQUE, PARADE GROUND AND A PAVILION ON SITE 1.
Dec 1, 2019P00013$625.6KMODIFICATION P00013 IS TO INCORPORATE THE CHANGES OF COP #10.
Jun 28, 2019P00012$221.2KMODIFICATION P00012 IS TO REVISE THE AUDITORIUM SEATS IN FACILITY 402, ADMINISTRATION BUILDING (LARGE) ON SITE 1.
May 12, 2019P00011$41.8KMODIFICATION P00011 IS TO REVISE THE ELEVATOR IN FACILITY 406, C2 MAIN BUILDING (ADOC), FROM A ONE TON ELEVATOR TO A TWO TON ELEVATOR ON SITE 1.
Mar 26, 2019P00010$9.0KMODIFICATION P00010 IS FOR ADDITIONAL 3D RENDERINGS AS IDENTIFIED IN THE MODIFICATION SCOPE OF WORK.
Mar 25, 2019P00009$151.1KMODIFICATION P00009 IS FOR COSTS ASSOCIATED WITH PUBLIC WORKS AUTHORITY (ASHGHAL) TIE-IN AND ROADWAY TO THE ORBITAL HIGHWAY FROM SITE 1.
Feb 16, 2019P00008$19.7KMODIFICATION P00008 IS FOR ABATEMENT OF ASBESTOS CONTAINING MATERIALS (ACM) ON SITE 4A.
Dec 20, 2018P00007$15.9MMODIFICATION P00007 ISSUED FOR CHANGE ORDER PACKAGE ONE (COP #01) SCOPE OF WORK.
Oct 22, 2018P00006$-2.9MMODIFICATION P00006 IS TO DESCOPE BUILDING 312 (GENERAL PURPOSE FACILITY) AND ITS ASSOCIATED STRUCTURES, ROADWAYS, AND UTILITIES AT SITE 1.
Aug 31, 2018P00005$23.5KMODIFICATION P00005 IS FOR 3D RENDERINGS OF ROOMS WITHIN FACILITIES AS IDENTIFIED IN THE MODIFICATION SCOPE OF WORK.
Jul 11, 2018P00004$29.4KMODIFICATION TO IDENTIFY, SAMPLE, TEST, AND PROVIDE A REPORT OF POTENTIAL ASBESTOS CONTAINING MATERIALS (ACM) ON SITE 4A
Jun 26, 2018P00003$33.2KMODIFICATION FOR GEOTECHNICAL INVESTIGATION ON SITE 4A DUE TO COP #01.
Apr 18, 2018P00002$129.5KIGF::OT::IGF ADDITIONAL FUNDING TO SITE CIVIL WORK FOR COP #02 FOR THE REMOVAL OF TREES AND BUSHES FROM SITE 1.
Mar 7, 2018P00001$0IGF::OT::IGF ADMIN MODIFICATION TO REVISE SPECIFICATIONS
Nov 16, 20170$226.3MIGF::OT::IGF SOFA SHIELD 5, QATAR