Federal contract award

W912ER23C0002

CONSTRUCTION OF A WHARF. HARBORMASTER CONTROL TOWER, PIERS, MAINTENANCE/FUELING FACILITIES & INFRASTRUCTURE IN SUPPORT OF ROYAL SAUDI NAVAL FORCE MULTI-MISSION SURFACE COMBATANT SHIPS PROGRAM AT KING ABDULAZIZ NAVAL BASE, KINGDOM OF SAUDI ARABIA.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW076 ENDIST MIDDLE EAS(PROVIS)
NAICS236220 — Commercial and Institutional Building Construction
PSCY1ED — CONSTRUCTION OF SHIP CONSTRUCTION AND REPAIR FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$405.0M
Current contract value$405.0M
Potential contract value / ceiling$508.0M
Start dateMay 8, 2023
Current end dateMar 8, 2027
Potential end dateMar 8, 2027
Latest award activityMay 7, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 27 of 27 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 7, 2026P00010$621.7KTHERE ARE TWO CHANGES IN THIS SF30. SJ020 FUEL SYSTEM PUMP HOUSE CHILLERSJ024 MISC HVAC CHANGES.
Mar 11, 2026P00009$80.8KSCOPE OF WORK
Jan 30, 2026A00016$86.9KSCOPE OF WORK
Jan 20, 2026A00015$41.0KSCOPE OF WORK
Jan 14, 2026A00014$0SEE CONTINUATION PAGE 2
Dec 16, 2025A00013$464.7KSEE CONTINUATION PAGE 2
Nov 3, 2025A00012$176.6KWHARF MARINE UTILITY TRENCH CONNECTION
Jul 17, 2025A00011$0REROUTE MV CABLE / NEW RMU TIE IN KANB03
May 15, 2025A00010$108.0KDIESEL PIPE RE-ROUTE AND TANK SURVEY
Feb 26, 2025A00009$226.3KSEWER & ELEC TIE-IN
Jan 8, 2025A00008$15.4KSAWANS CHANGE
Nov 21, 2024P00008$0PAVING AND POP ADJUSTMENTS
Sep 15, 2024A00007$10.8KA00007 OVERHEAD BRIDGE CRANE CLEARANCE
Aug 27, 2024A00006$0A00006 CITC RE-ROUTE
Aug 20, 2024A00005$0A00005 RE-ROUTE FUEL & COMMS LINE
Jul 10, 2024A00004$0RE-ROUTE BUILDING FIRE MAIN LINE
Jul 8, 2024P00007$243.2KENCLOSURE & CW PUMPS
Jul 1, 2024A00003$5.0KA00003 ADD DOOR A112 IN FUEL SYSTEM PUMP HOUSE
May 21, 2024P00006$0P00006 VAT DISTRIBUTION TO VAT CLIN
May 1, 2024P00005$-4.7MP00005 VE WHARF DESIGN
Apr 7, 2024A00002$0A00002 SCHEDULE SPECIFICATION
Feb 29, 2024P00004$29.0MCONSTRUCT MMSC TRAINING FACILITY, KING ABDULAZIZ NAVAL BASE, JUBAIL, SAUDI ARABIA
Jan 8, 2024P00003$-15.6MCHANGE REQUEST SJ003 DESCOPE CLINS 0029, 0034 & 0046. ROYAL SAUDI NAVAL FORCES MULTI-MISSION SURFACE COMBATANT (MMSC) JUBAIL, KINGDOM OF SAUDI ARABIA
Nov 15, 2023P00002$40.8MP00002 EXERCISE OPTIONS #2 & #3 FUEL SYSTEMS
Nov 6, 2023A00001$0A00001 TIME EXTENSION ACCESS DELAYS 42 DAYS
Sep 22, 2023P00001$29.0MEXERCISE OF OPTION ON THE MMSC IOC CONTRACT, JUBAIL, SAUDI ARABIA
May 8, 20230$319.5MCONSTRUCTION OF A WHARF. HARBORMASTER CONTROL TOWER, PIERS, MAINTENANCE/FUELING FACILITIES & INFRASTRUCTURE IN SUPPORT OF ROYAL SAUDI NAVAL FORCE MULTI-MISSION SURFACE COMBATANT SHIPS PROGRAM AT KING ABDULAZIZ NAVAL BASE, KINGDOM OF SAUDI ARABIA.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-03-08 (134 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
27 recorded award transactions
+10 points
Latest award action: 2026-05-07
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.