W912ES21C0004

I-29 GRADE RAISE AND BORROW DITCH CROSSING OF THE FARGO MOORHEAD METROPOLITAN AREA FLOOD RISK MANAGEMENT PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST ST PAUL
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$68.2M
Current contract value$68.2M
Potential contract value / ceiling$68.2M
Start dateMay 7, 2021
Current end dateJun 30, 2024
Potential end dateJun 30, 2024
Latest award activityMay 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 25 of 25 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 28, 2026P00008$1.1MADJUSTMENT TO LINE ITEMS
May 22, 2026P00007$-2.2MADJUSTMENT TO LINE ITEMS
Oct 25, 2023A00016$42.8KR-033: THE DELETION OF THE #9 DEFORMED BARS AT MID-PANEL DEPTH AND ADJUST THE TRANSITIONS OF THE SOUTHBOUND SOUTH AND NORTH TIE-INS AS REFERENCED IN RFI-0046. R-034 TRAFFIC CONTROL CHANGES. R-036 ADDITIONAL TRAFFIC CONTROL.
Jul 18, 2023A00015$412.6KINCREASE IN THE QUANTITY OF DAM AND LEVEE EMBANKMENT AND INSPECTION TRENCH DUE TO AN ERROR IN QUANTITY CALCULATION DURING THE DESIGN PHASE.
Jun 13, 2023P00006$129.6KPERMANENT I-29 MAINLINE ROADWAY
Mar 28, 2023A00014$96.9KTRAFFIC CONTROL REQUIRED TO CLOSE THE COUNTY ROAD 16 INTERCHANGE RAMPS TO ALLOW THE CONTRACTOR TO MOVE IN PHASE 6 AND 7 OF THE PROJECT. CONTRACTOR WILL NOT BE REQUIRED TO BUILD THE TEMPORARY RAMP CONNECTIONS.
Mar 20, 2023A00013$154.7KINCORPORATE NDDOT DRAWINGS, RECOVER FIXED COSTS DUE TO AN UNDERRUN IN QUANTITY, MODIFY DRAWINGS FOR GUARDRAIL INSTALLATION.
Feb 24, 2023P00005$559.6KFMM I-29 GRADE RAISE AND BORROW DITCH CROSSING - VARIATION IN ESTIMATED QUANTITY CONTRACT MODIFICATION
Jan 19, 2023A00012$-287.2KTHIS CONTRACT IS MODIFIED TO: ADJUST CONTRACT QUANTITIES TO INTERIM QUANTITIES FOR CLIN 0017 PIPE CONDUIT 42-INCH, AND CLIN 0018 PIPE CONDUIT 54-INCH. ADJUST CONTRACT QUANTITIES TO ACTUAL FINAL QUANTITIES FOR CLIN 0046 GRANULAR BLANKET DRAIN.
Nov 23, 2022A00011$407.8KTHIS CONTRACT IS MODIFIED TO CONSTRUCT 2 STABILIZATION BERMS, INCREASE THE BORROW DITCH WIDTH, EXTEND THE SOUTHERN EMBANKMENT AND TO COMPENSATE THE CONTRACTOR FOR UNRECOVERED FIXED COSTS DUE TO QUANTITY UNDERRUNS.
Oct 27, 2022A00010$176.8KREMOVAL OF CROSSOVERS, ELIMINATION OF SHAPE ARRAY PIPING, ADDITION OF EXTRA SIGNS FOR TRAFFIC SAFETY.
Sep 27, 2022P00004$190.9KPERMANENT I-29 MAINLINE ROADWAY
Sep 1, 2022A00009$182.4KADD SIGNS TO THE COUNTY ROAD 18/81 INTERSECTION FOR TRAFFIC SAFETY AND PERFORM BUMP REPAIR ON THE I-29 BYPASS.
May 3, 2022A00008$107.6KTHIS CONTRACT IS MODIFIED TO COMPENSATE THE CONTRACTOR FOR FIXED COSTS NOT RECOVERED DUE TO A REDUCTION IN QUANTITY ALONG WITH COMPENSATION FOR VARIOUS ERRORS IN THE DRAWINGS AND USER REQUESTS.
Apr 28, 2022A00007$-180.6KTHIS CONTRACT IS MODIFIED TO: DECREASE CLIN 0045 VERTICAL WICK DRAIN TO 380,000 LF DUE TO AN ERROR IN CALCULATIONS DURING DESIGN AND TO CAPTURE THE ACTUAL QUANTITY INSTALLED.
Mar 4, 2022A00006$19.2KTHIS CONTRACT IS MODIFIED TO ADD DELINEATORS, MILE MARKERS, AND OBJECT MARKERS ALONG THE I-29 TEMPORARY BYPASS AND TO ADD DELINEATORS TO THE TEMPORARY INTERSTATE RAMP CONNECTIONS INSTALLED.
Dec 10, 2021A00005$0THIS CONTRACT IS MODIFIED TO: EXTEND THE RED RIVER BORROW INTERIM COMPLETION DATE BY 12 CALENDAR DAYS FROM 16 OCTOBER 2021 TO 28 OCTOBER 2021 FOR UNUSUALLY SEVERE WEATHER DURING THE MONTH OF OCTOBER 2021.
Oct 15, 2021A00004$0THIS CONTRACT IS MODIFIED TO: THIS MODIFICATION EXTENDS THE RED RIVER BORROW INTERIM COMPLETION DATE BY 8 CALENDAR DAYS FROM 08 OCTOBER 2021 TO 16 OCTOBER 2021 FOR UNUSUALLY SEVERE WEATHER BETWEEN MAY 2021 AND SEPTEMBER 2021.
Sep 14, 2021A00003$8.7KTHIS CONTRACT IS MODIFIED TO INSTALL ADDITIONAL SIGNS ON HWY 81 AND REIMBURSE THE CONTRACTOR FOR THE GOVERNMENT SHARE OF THE PARTNERING EXPENSE.
Sep 2, 2021A00002$87.4KTHIS CONTRACT IS MODIFIED TO ADJUST THE ESTIMATED QUANTITIES TO INTERIM QUANTITIES FOR PIPE CONDUIT CLINS 0009, 0012, 0013, 0014, 15, 0016, 0017, 0018.
Jul 30, 2021A00001$50.0KREMOVE THE NORTH AND SOUTH CROSSOVERS INSTALLED UNDER NDDOT CONTRACT #IM-8-029(194)053. WORK INCLUDES SALVAGED BASE COURSE REMOVAL, ASPHALT REMOVAL, GEOSYNTHETIC MATERIAL REMOVAL, MATERIAL DISPOSAL, AND NECESSARY TRAFFIC CONTROL.
May 24, 2021P00003$0I-29 GRADE RAISE NO-COST ADMINISTRATIVE MODIFICATION, FARGO, ND
May 4, 2021P00002$0I-29 GRADE RAISE NO-COST CHANGE
Apr 15, 2021P00001$0I-29 GRADE RAISE AND BORROW DITCH CROSSING MODIFICATION
Apr 8, 20210$67.0MI-29 GRADE RAISE AND BORROW DITCH CROSSING OF THE FARGO MOORHEAD METROPOLITAN AREA FLOOD RISK MANAGEMENT PROJECT