Federal contract award

W912ES22C0003

CONSTRUCTION OF THE RED RIVER STRUCTURE OF THE FARGO MOORHEAD METROPOLITAN AREA FLOOD RISK MANAGEMENT PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST ST PAUL
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1KA — CONSTRUCTION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$118.2M
Current contract value$118.2M
Potential contract value / ceiling$118.2M
Start dateMay 15, 2022
Current end dateJun 9, 2027
Potential end dateJun 9, 2027
Latest award activityJun 4, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 16 of 16 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 12, 2026A00013$25.7K(R-026) COMPENSATE THE CONTRACTOR FOR (REA-005) THE NECESSITY TO BUILD AN ACCESS ROAD TO THE RED RIVER STRUCTURE SITE FOLLOWING THE 3RD STREET CLOSURE; (REA-006) COMPENSATE THE CONTRACTOR FOR SEALING CRACKS IN THE CONTROL STRUCTURE.
Jun 4, 2026A00012$0CHANGE THE PROTECTIVE BOLLARD ALONG THE NORTH SIDE OF THE DAM WALLS, RATIO OF NUCLEAR DENSITY AND SAND CONE TESTS, BERM FILL LIFT, COMPACTION AND MOISTURE CONTENT REQUIREMENTS, MAXIMUM MOISTURE CONTROL LIMITS, AND DELETE PORTIONS OF SPECIFICATIONS.
Apr 29, 2026A00011$432.0K(R-025 AND 027) ADJUST THE ESTIMATED CONTRACT QUANTITIES TO ACTUAL FINAL QUANTITIES FOR CLIN 0036AB STEEL H-PILE (HP 14X73), 0037AB STEEL H-PILE (HP 14X102), AND CLIN 0038AB SHEET PILE.
Apr 10, 2026A00010$0THIS CONTRACT IS MODIFIED TO: (R-017) EXTEND THE CONTRACT COMPLETION DATE BY 40 CALENDAR DAYS TO ACCOUNT FOR ADVERSE WEATHER BETWEEN AUGUST 2024 THROUGH DECEMBER 2025
Sep 18, 2025A00009$29.3KREVISE THE SUBMERGENCE RATIO EQUATION AND EQUATION 2 TO CORRECT IDENTIFIED ERRORS AND UPDATE ASSOCIATED SCREENS IDENTIFIES STAIN FOR THE CONCRETE TRUNNION GIRDERS AND ADDS A NEW PLAN SHEET DETAILING PROPER MOUNTING FOR THE OBJECT MARKER ASSEMBLIES.
Jun 9, 2025A00008$186.0KREPLACES THE EXISTING SQUARE ALUMINUM LIGHT POLES, REPLACE THE COMMUNICATION CABLE, RUN 1.5-INCH CONDUIT TO THE MECHANICAL SERVICE BRIDGE, ADD LOW FLOW RADAR GAUGE, AND PROCURE AND INSTALL WIND SENSOR TOWER AND FOUNDATION FOR THE TOWER.
Dec 11, 2024P00002$442.9KCHANGES TO TURF REINFORCEMENT MAT AND J-BULB SIZING
Nov 15, 2024A00007$0(R-17) EXTEND THE CONTRACT COMPLETION DATE BY 42 CALENDAR DAYS TO ACCOUNT FOR UNUSUALLY SEVERE WEATHER EXPERIENCED AT THE RED RIVER STRUCTURE PROJECT SITE BETWEEN THE MONTHS MARCH 2022 THROUGH JULY 2024.
Oct 29, 2024P00001$1.1MINCLUDE RADIOGRAPHIC TESTING FOR ALL DIAGONAL CONNECTIONS IN SKIN PLATE BRACINGS AS IDENTIFIED IN DRAWINGS SG203 AND SG506. TO MITIGATE THE SCHEDULE IMPACTS- THE FINAL GATE WILL BE CONSTRUCTED DURING THE WINTER MONTHS INSIDE A HEATED ENCLOSURE.
Sep 24, 2024A00006$136.5KREQUIRE THE CONTRACTOR TO RELOCATE THE TEMPORARY CONSTRUCTION FACILITIES FROM THEIR CURRENT LOCATION AT THE RED RIVER STRUCTURE SITE, TO INCLUDE MOVING JOB TRAILERS, REMOVING AND RELOCATING THE ACCESS ROAD AND CONSTRUCTING A NEW LAYDOWN PAD.
Aug 15, 2024A00005$182.5K1. (R-0012) REVISE THE PIER AND ABUTMENT STAIRS AND INSTALL ACCORDANCE WITH THE REVISED DESIGN CHANGE THE IMPERVIOUS FILL LIFT THICKNESS TO 9 INCHES. 2. (R0015) CHANGE THE WIDTH (EAST-WEST DIRECTION) OF THE (6) DOGGING PLATFORMS.
Jul 22, 2024A00004$307.2KCHANGE THE SPECIFIED MACHINERY HOISTING EQUIPMENT FROM A WORM GEAR REDUCER TO A HELICAL GEAR AND CONDUCT COMPLIANCE VERIFICATION THROUGH LOAD TESTING BEFORE SHIPPING. THIS MODIFICATION INCLUDES MACHINERY GUARDS ON ALL EXPOSED ROTATING EQUIPMENT.
Jun 27, 2024A00003$116.2KTHE CHANGE ENCOMPASSES DESIGN CHANGES TO THE BRIDGES AND MECHANICAL PLATFORMS SCHEDULE CHANGES TO ALLOW EARLIER PLACEMENT OF EMBANKMENT AND FASTER REVIEWS OF FRACTURE CRITICAL WELDS AND CHANGES TO THE H-PILE TENSION CAPACITY.
Jan 4, 2024A00002$168.6K(1) (R-02) REBAR SIZE CHANGE AND GATE SEAL HEATER (2) (R-04) REVISE TRUNNION GIRDER TRANSVERSE BARS (3) (R-06) COMPENSATE CONTRACTOR FOR REMOVAL OF HOUSE FOUNDATION (4) (R-10) PROVIDE A CREDIT TO THE GOVERNMENT FOR REPLACING THE CQC MANAGER.
Dec 7, 2022A00001$26.0KTHIS CONTRACT IS MODIFIED TO: PROVIDE 6 LICENSES TO ACCESS THE CONTRACTOR'S CONSTRUCTION MANAGEMENT SOFTWARE AND 6 TABLETS SIMILAR IN SIZE AND CAPABILITIES TO THOSE USED BY AMES CONSTRUCTION PROJECT SITE MANAGEMENT.
Mar 15, 20220$114.9MCONSTRUCTION OF THE RED RIVER STRUCTURE OF THE FARGO MOORHEAD METROPOLITAN AREA FLOOD RISK MANAGEMENT PROJECT

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-06-09 (227 days from calculation)
+35 points
11 historical awards in this buyer and category group
+15 points
16 recorded award transactions
+10 points
Latest award action: 2026-06-04
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.