Federal contract award

W912ES23C0007

ROADS WEST PROJECT AT ST. CLOUD VA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST ST PAUL
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2LB — REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Parent award / vehicleNot reported
Set-asideSERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Pricing typeFIRM FIXED PRICE
Obligations$5.7M
Current contract value$5.7M
Potential contract value / ceiling$5.7M
Start dateJun 16, 2023
Current end dateOct 31, 2025
Potential end dateOct 31, 2025
Latest award activityMar 27, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 27, 2025A00005$115.1KREA-003: STOCKPILING UNSUITABLE SOIL, HAULING OFF AND IMPORTING SUITABLE SOIL TO REPLACE UNACCEPTABLE MATERIAL. REA-004: RETAINING WALL FOUNDATION DEMOLITION. REA-005: ADDITIONAL ASPHALT PAVEMENT TO AN EXISTING LOW POINT.
Dec 18, 2024A00004$35.5KINSTALL NEW STORM SEWER PIPING BETWEEN THE GEOTHERMAL AND LOW VOLTAGE DUCT BANKS AND CHANGE THE SLOPE OF THE STORM SEWER LINES TO ENSURE ADEQUATE CLEARANCE FOR THE GEOTHERMAL AND VOLTAGE UTILITIES LINES THAT CROSS THE STORM WATER LINES.
Nov 27, 2024A00003$230.5K(REA-002) CONTAMINATED SOILS: THIS CHANGE IS BASED ON THE REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR STOCKPILING CONTAMINATED SOIL, HAULING OFF AND IMPORTING NEW SOIL TO REPLACE THE CONTAMINATED QUANTITIES.
Nov 20, 2024A00002$83.7K(R-001) REMOVAL AND REPLACEMENT OF EXISTING CURB, PEDESTRIAN RAMP ON THE NORTH SIDE, ASPHALT PAVEMENT, STORM SEWER CASTING, AND ADJUSTING RINGS, BAR GRATING AND ASSOCIATE CONCRETE.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.