Federal contract award

W912ES24C0007

OXBOW, HICKSON, AND BAKKE RING LEVEE OF THE FARGO MOORHEAD METROPOLITAN FLOOD RISK MANAGEMENT PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST ST PAUL
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1KA — CONSTRUCTION OF DAMS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$14.1M
Current contract value$14.1M
Potential contract value / ceiling$14.1M
Start dateFeb 23, 2024
Current end dateNov 14, 2026
Potential end dateNov 14, 2026
Latest award activityJun 5, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 5, 2026A00009$415.3K(R-0010) ADJUST THE ESTIMATED CONTRACT QUANTITIES TO ACTUAL FINAL QUANTITIES FOR CLIN 0003AB, 0009AB, CLIN 0014, CLIN 0016, CLIN 0027 B1 BEDDING, AND CLIN 0028 R20 RIPRAP.
May 29, 2026A00008$426.8KTHIS CONTRACT IS MODIFIED TO: (R-011) ADJUST THE ESTIMATED CONTRACT QUANTITIES TO ACTUAL FINAL QUANTITIES FOR CLIN 0008AB TOPSOIL RESPREAD - OVER 107,334 CY AND CLIN 0038 REMOVE EXISTING ROADWAY.
Mar 11, 2026A00007$327.0K(R-009) DIG THREE CONFIRMATORY TRENCHES PERPENDICULAR TO THE EMBANKMENT ALIGNMENT, AT LOCATIONS SPECIFIED BY THE CONTRACTING OFFICER, TO INSPECT THE COMPLETED WORK IN ACCORDANCE WITH FAR 52.246-12; AND (R-005) EXPAND WEST BORROW AREA
Dec 1, 2025A00006$76.7K1) REQUIRE THE CONTRACTOR TO REMOVE AND REPLACE THE TOP TWO FEET OF BLOCKY MATERIAL FROM THE EMBANKMENT BETWEEN STA. B 59+00 TO B 72+00; 2) INCREASES THE ALLOWABLE MAXIMUM MOISTURE FROM OPTIMUM MOISTURE PLUS 3% TO OPTIMUM MOISTURE PLUS 5%.
Sep 29, 2025A00005$0STORM SEWER PIPE - 54" RCP
Sep 16, 2025A00004$4.8KCONTRACT IS MODIFIED TO PLACE SACRIFICIAL LAYER OF GRAVEL ON THE PUMPHOUSE ACCESS ROAD TO ENSURE THE CITY OF FARGO HAS ACCESS TO THE PUMPHOUSE BEFORE THE FINAL LAYER IS PLACED PER PLAN (R-006).
Jun 18, 2025A00003$0EXTEND THE TIME FOR PERFORMANCE ALLOWED UNDER CONTRACT CLAUSE 52.211-10 BY 23 CALENDAR DAYS FOR DELAYS CAUSED BY ADVERSE WEATHER IN EXCESS OF ANTICIPATED DURING THE PERIOD 01 APRIL 2025 - 31 MAY 2025.
Oct 28, 2024A00002$8.1KLOWER WATERLINE NOTED W AND LABELED 2 IN PVC ON SHEETS CU101-CU103, WITH NO ANNOTATIONS INDICATING DISPOSITION. THIS MODIFICATION COMPENSATES THE CONTRACTOR FOR UNBUDGETED COSTS FOR LABOR, EQUIPMENT, AND SUBCONTRACTOR REQUIRED TO LOWER THE WATERLINE.
Sep 30, 2024A00001$14.3KDRAWING REVISIONS AND TIME EXTENSION FOR WEATHER
Feb 22, 20240$12.8MOXBOW, HICKSON, AND BAKKE RING LEVEE OF THE FARGO MOORHEAD METROPOLITAN FLOOD RISK MANAGEMENT PROJECT

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-11-14 (20 days from calculation)
+35 points
11 historical awards in this buyer and category group
+15 points
10 recorded award transactions
+10 points
Latest award action: 2026-06-05
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.