Federal contract award
W912ES24C0007
OXBOW, HICKSON, AND BAKKE RING LEVEE OF THE FARGO MOORHEAD METROPOLITAN FLOOD RISK MANAGEMENT PROJECT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W07V ENDIST ST PAUL |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1KA — CONSTRUCTION OF DAMS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $14.1M |
| Current contract value | $14.1M |
| Potential contract value / ceiling | $14.1M |
| Start date | Feb 23, 2024 |
| Current end date | Nov 14, 2026 |
| Potential end date | Nov 14, 2026 |
| Latest award activity | Jun 5, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 5, 2026 | A00009 | $415.3K | (R-0010) ADJUST THE ESTIMATED CONTRACT QUANTITIES TO ACTUAL FINAL QUANTITIES FOR CLIN 0003AB, 0009AB, CLIN 0014, CLIN 0016, CLIN 0027 B1 BEDDING, AND CLIN 0028 R20 RIPRAP. |
| May 29, 2026 | A00008 | $426.8K | THIS CONTRACT IS MODIFIED TO: (R-011) ADJUST THE ESTIMATED CONTRACT QUANTITIES TO ACTUAL FINAL QUANTITIES FOR CLIN 0008AB TOPSOIL RESPREAD - OVER 107,334 CY AND CLIN 0038 REMOVE EXISTING ROADWAY. |
| Mar 11, 2026 | A00007 | $327.0K | (R-009) DIG THREE CONFIRMATORY TRENCHES PERPENDICULAR TO THE EMBANKMENT ALIGNMENT, AT LOCATIONS SPECIFIED BY THE CONTRACTING OFFICER, TO INSPECT THE COMPLETED WORK IN ACCORDANCE WITH FAR 52.246-12; AND (R-005) EXPAND WEST BORROW AREA |
| Dec 1, 2025 | A00006 | $76.7K | 1) REQUIRE THE CONTRACTOR TO REMOVE AND REPLACE THE TOP TWO FEET OF BLOCKY MATERIAL FROM THE EMBANKMENT BETWEEN STA. B 59+00 TO B 72+00; 2) INCREASES THE ALLOWABLE MAXIMUM MOISTURE FROM OPTIMUM MOISTURE PLUS 3% TO OPTIMUM MOISTURE PLUS 5%. |
| Sep 29, 2025 | A00005 | $0 | STORM SEWER PIPE - 54" RCP |
| Sep 16, 2025 | A00004 | $4.8K | CONTRACT IS MODIFIED TO PLACE SACRIFICIAL LAYER OF GRAVEL ON THE PUMPHOUSE ACCESS ROAD TO ENSURE THE CITY OF FARGO HAS ACCESS TO THE PUMPHOUSE BEFORE THE FINAL LAYER IS PLACED PER PLAN (R-006). |
| Jun 18, 2025 | A00003 | $0 | EXTEND THE TIME FOR PERFORMANCE ALLOWED UNDER CONTRACT CLAUSE 52.211-10 BY 23 CALENDAR DAYS FOR DELAYS CAUSED BY ADVERSE WEATHER IN EXCESS OF ANTICIPATED DURING THE PERIOD 01 APRIL 2025 - 31 MAY 2025. |
| Oct 28, 2024 | A00002 | $8.1K | LOWER WATERLINE NOTED W AND LABELED 2 IN PVC ON SHEETS CU101-CU103, WITH NO ANNOTATIONS INDICATING DISPOSITION. THIS MODIFICATION COMPENSATES THE CONTRACTOR FOR UNBUDGETED COSTS FOR LABOR, EQUIPMENT, AND SUBCONTRACTOR REQUIRED TO LOWER THE WATERLINE. |
| Sep 30, 2024 | A00001 | $14.3K | DRAWING REVISIONS AND TIME EXTENSION FOR WEATHER |
| Feb 22, 2024 | 0 | $12.8M | OXBOW, HICKSON, AND BAKKE RING LEVEE OF THE FARGO MOORHEAD METROPOLITAN FLOOD RISK MANAGEMENT PROJECT |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-11-14 (20 days from calculation)
- +35 points
- 11 historical awards in this buyer and category group
- +15 points
- 10 recorded award transactions
- +10 points
- Latest award action: 2026-06-05
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.