Federal contract award
W912ES24C0008
FMM SE-1B
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W07V ENDIST ST PAUL |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1KA — CONSTRUCTION OF DAMS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $15.1M |
| Current contract value | $15.2M |
| Potential contract value / ceiling | $15.2M |
| Start date | Feb 27, 2024 |
| Current end date | Aug 1, 2027 |
| Potential end date | Aug 1, 2027 |
| Latest award activity | May 26, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 26, 2026 | P00004 | $0 | (R-004) COMPENSATE THE CONTRACTOR FOR REMOVAL AND REPLACEMENT OF UNSUITABLE MATERIAL AND FOR IMPACT COSTS RELATED TO TRAFFIC CONTROL; PROVIDE A CONTRACT TIME EXTENSION OF 51 CALENDAR DAYS; (R-006) CORRECT THE CONTRACT TIME EXTENSION GIVEN IN A00003. |
| May 13, 2026 | P00003 | $780.0K | (R-004) COMPENSATE THE CONTRACTOR FOR REMOVAL AND REPLACEMENT OF UNSUITABLE MATERIAL AND FOR IMPACT COSTS RELATED TO TRAFFIC CONTROL; PROVIDE A CONTRACT TIME EXTENSION OF 51 CALENDAR DAYS; (R-006) CORRECT THE CONTRACT TIME EXTENSION GIVEN IN A00003. |
| Feb 5, 2026 | A00003 | $0 | THIS CONTRACT IS MODIFIED TO: (R-004) EXTEND THE CONTRACT COMPLETION DATE BY 42 CALENDAR DAYS TO ACCOUNT FOR ADVERSE WEATHER BETWEEN APRIL 2024 THROUGH DECEMBER 2025. |
| Sep 16, 2025 | A00002 | $137.2K | (R-005) ASSUME AUTHORITY AND RESPONSIBILITY FOR THE STORM WATER POLLUTION PREVENTION PLAN FOR SE-2A, TO INCLUDE INSTALLATION OF FEATURES (PLUGS, STRAW BALES, EROSION PROTECTION) AND REPORTING. WORK SHALL INCLUDE WEED CONTROL ON THE SE-2A SITE. |
| Jul 21, 2025 | A00001 | $69.1K | R-002: REMOVE APPROXIMATELY 10" THICK CONCRETE DISCOVERED UNDER ASPHALT ROAD (CR16) WEST OF CR17/16 INTERSECTION TO THE WEST PROJECT LIMIT LINE, R-003: PROVIDE A CREDIT TO THE GOVERNMENT FOR THE GOVERNMENT TRAILER IN THE FIRST YEAR OF CONSTRUCTION. |
| Mar 27, 2025 | P00002 | $0 | FMM SE-1B FUNDING |
| Aug 26, 2024 | P00001 | $866.7K | REQUIRE THE CONTRACTOR TO REMOVE ALL BORROW MATERIAL FROM THE CITY OF FARGO STOCKPILE WITHIN 2024, ALTER SEASONAL LIMITATION DATES, AND SPECIFY THAT SEEDING ATOP OF TRM MUST BE HYDRAULICALLY SEEDED. |
| Feb 27, 2024 | 0 | $13.2M | FMM SE-1B |
Estimated positioning window
Oct 25, 2026 – Feb 1, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-08-01 (280 days from calculation)
- +35 points
- 11 historical awards in this buyer and category group
- +15 points
- 8 recorded award transactions
- +10 points
- Latest award action: 2026-05-26
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.