Federal contract award
W912ES25CA009
THE PROJECT INCLUDES REPAIR OF APPROXIMATELY 3150 FEET OF LEVEE. LEVEE DAMAGE MUST BE REPAIRED BY STRIPPING TOPSOIL, DEBRIS, AND DAMAGED SOIL FROM THE LEVEE AND RECOMPACTING LEVEE FILL EXCAVATED FROM THE EXISTING LEVEE AND BORROW AREA.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W07V ENDIST ST PAUL |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1QA — CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $525.4K |
| Current contract value | $525.4K |
| Potential contract value / ceiling | $525.4K |
| Start date | Jul 10, 2025 |
| Current end date | Oct 14, 2025 |
| Potential end date | Oct 13, 2026 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | A00002 | $-35.0K | THIS CONTRACT IS MODIFIED TO: DELETE CLIN 0002 CULVERT CLEANING, AND CLIN 0008 TEMPORARY ACCESS RAMP. |
| Jan 23, 2026 | A00001 | $-78.8K | THE PROJECT INCLUDES REPAIR OF APPROXIMATELY 3150 FEET OF LEVEE. LEVEE DAMAGE MUST BE REPAIRED BY STRIPPING TOPSOIL, DEBRIS, AND DAMAGED SOIL FROM THE LEVEE AND RECOMPACTING LEVEE FILL EXCAVATED FROM THE EXISTING LEVEE AND BORROW AREA. |
| Jul 10, 2025 | 0 | $639.2K | THE PROJECT INCLUDES REPAIR OF APPROXIMATELY 3150 FEET OF LEVEE. LEVEE DAMAGE MUST BE REPAIRED BY STRIPPING TOPSOIL, DEBRIS, AND DAMAGED SOIL FROM THE LEVEE AND RECOMPACTING LEVEE FILL EXCAVATED FROM THE EXISTING LEVEE AND BORROW AREA. |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.