W912GB16C0015

IGF::OT::IGF ELEMENTARY SCHOOL, STUTTGART, GERMANY

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST EUROPE
NAICS238990 — All Other Specialty Trade Contractors
PSCY1CA — CONSTRUCTION OF SCHOOLS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$58.9M
Current contract value$58.9M
Potential contract value / ceiling$58.9M
Start dateApr 12, 2016
Current end dateDec 30, 2028
Potential end dateDec 30, 2028
Latest award activityMay 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 30 of 30 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 28, 2026A00010$170.4KABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY. THE PROJECT CONSISTS OF CONSTRUCTION OF 80,906 SQUARE FEET ELEMENTARY SCHOOL FOR APPROXIMATELY 315 STUDENTS FROM PRE-K THROUGH 5TH GRADE.
Jan 23, 2026A00009$17.0KRELOCATE THE EXISTING GRENADIER BUS STOP FROM ITS CURRENT LOCATION WITHIN THE ACP FOOTPRINT TO A NEW LOCATION EAST OF THE EAST ACP BARRIER, OUTSIDE OF THE CONTROLLED CONSTRUCTION AREA.
Jan 21, 2026A00008$113.2KREVISED INTERPRETATION OF AT/FP REQUIREMENTS FOR THE ROBINSON BARRACKS ELEMENTARY SCHOOL MASS NOTIFICATION SYSTEM (MNS) AND LOCKDOWN SYSTEM. TO ADD, RELOCATE, AND ADJUST POLICE LOCKDOWN BUTTONS AND LOCAL OPERATING CABINETS (LOCS).
Nov 24, 2025A00007$28.8KABG5 - ADDITIONAL CLEARING & GRUBBING CONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART REFERENCE NO. R00027
Sep 15, 2025A00006$384.7KCONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY. AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00026. TOTAL CONTRACT PRICE INCREASED BY 358,881.44 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
Aug 27, 2025A00005$-106.1KCONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00025. TOTAL CONTRACT PRICE DECREASED BY 98,994.33 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
Aug 18, 2025A00004$153.0KCONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY. REFERENCE NO. R00024. TOTAL CONTRACT PRICE INCREASED BY 142,709.70 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
Apr 23, 2025P00019$456.1KSOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL, STUTTGART
Nov 13, 2024P00018$-18.2MSOFA ABG-X CONSTRUCT ELEMENTARY SCHOOL, ROBINSON BARRACKS, STUTTGART
Sep 11, 2024A00003$0DISPOSAL CHANGES AND LANDSCAPING, CONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY, AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00021 CR003 DISPOSAL CHANGES AND LANDSCAPING. ZERO USD/EUR MODIFICATION. ZERO DAYS ADDED.
Apr 22, 2024P00017$385.9KSOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL, STUTTGART
Mar 6, 2024A00002$-0ROBINSON ELEMENTARY SCHOOL, STUTTGART. REF # R00018 CR002 TRANSPORT COSTS & UNKNOWN CONDITIONS. TOTAL CONTRACT PRICE IS DECREASED BY 0.10 EU. CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 94 CD BY REASON OF THIS MODIFICATION.
Jan 26, 2024P00016$214.4KSOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BARRACKS, STUTTGART
Dec 21, 2023P00015$120.7KSOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART
Nov 9, 2023A00001$109.0KCONTRACT FOR ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00015 CR001 SCREED, KMF AND TOPSOIL
Sep 15, 2023P00014$34.1MSOFA ABG-X REPLACE ES ROBINSON BARRACKS STUTTGART
Jul 7, 2023P00013$-715.3KSOFA ABG-X REPLACE ES ROBINSON STUTTGART
Feb 1, 2023P00012$-641.3KSOFA ABG-X ROBINSON ELEMENTARY SCHOOL - BUILDING DEMOLITION AND UTILITY RELOCATIONS
Nov 8, 2022P00011$0SOFA ABG-X CONSTRUCT ES ROBINSON BARRACKS STUTTGART ABG4 TREE CUTTING
Oct 28, 2022P00010$0SOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BKS. STUTTGART
Sep 15, 2022P00009$1.3MSOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART
Jul 21, 2022P00008$437.6KSOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART
Apr 21, 2022P00007$34.6KSOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART
Sep 30, 2021P00006$38.0MABGX SOFA CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BARRACKS STUTTGART GERMANY
Sep 18, 2020P00005$88.6KSOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BKS STUTTGART
Mar 17, 2020P00004$70.8KSOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BARRACKS STUTTGART
Jun 26, 2019P00003$406.3KSOFA ABG-X REPLACE ROBINSON BARRACKS ELEMENTARY SCHOOL STUTTGART, ADD LOST DESIGN EFFORT
Jan 11, 2019P00002$335.5KSOFA - ABG-X REPLACE ROBINSON ELEMENTARY SCHOOL, STUTTGART GERMANY
May 8, 2017P00001$1.1MIGF::OT::IGF ROBINSON ELEMENTARY/MI SCHOOL, STUTTGART
Sep 24, 20160$480.9KIGF::OT::IGF ELEMENTARY SCHOOL, STUTTGART, GERMANY

Estimated positioning window

Dec 30, 2027 – Jun 30, 2028

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2028-12-30 (790 days from calculation)
+15 points
13 historical awards in this buyer and category group
+15 points
30 recorded award transactions
+10 points
Latest award action: 2026-05-28
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.