Federal contract award
W912GB16C0015
IGF::OT::IGF ELEMENTARY SCHOOL, STUTTGART, GERMANY
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST EUROPE |
| NAICS | 238990 — All Other Specialty Trade Contractors |
| PSC | Y1CA — CONSTRUCTION OF SCHOOLS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $58.9M |
| Current contract value | $58.9M |
| Potential contract value / ceiling | $58.9M |
| Start date | Apr 12, 2016 |
| Current end date | Dec 30, 2028 |
| Potential end date | Dec 30, 2028 |
| Latest award activity | May 28, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 30 of 30 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 28, 2026 | A00010 | $170.4K | ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY. THE PROJECT CONSISTS OF CONSTRUCTION OF 80,906 SQUARE FEET ELEMENTARY SCHOOL FOR APPROXIMATELY 315 STUDENTS FROM PRE-K THROUGH 5TH GRADE. |
| Jan 23, 2026 | A00009 | $17.0K | RELOCATE THE EXISTING GRENADIER BUS STOP FROM ITS CURRENT LOCATION WITHIN THE ACP FOOTPRINT TO A NEW LOCATION EAST OF THE EAST ACP BARRIER, OUTSIDE OF THE CONTROLLED CONSTRUCTION AREA. |
| Jan 21, 2026 | A00008 | $113.2K | REVISED INTERPRETATION OF AT/FP REQUIREMENTS FOR THE ROBINSON BARRACKS ELEMENTARY SCHOOL MASS NOTIFICATION SYSTEM (MNS) AND LOCKDOWN SYSTEM. TO ADD, RELOCATE, AND ADJUST POLICE LOCKDOWN BUTTONS AND LOCAL OPERATING CABINETS (LOCS). |
| Nov 24, 2025 | A00007 | $28.8K | ABG5 - ADDITIONAL CLEARING & GRUBBING CONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART REFERENCE NO. R00027 |
| Sep 15, 2025 | A00006 | $384.7K | CONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY. AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00026. TOTAL CONTRACT PRICE INCREASED BY 358,881.44 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Aug 27, 2025 | A00005 | $-106.1K | CONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00025. TOTAL CONTRACT PRICE DECREASED BY 98,994.33 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Aug 18, 2025 | A00004 | $153.0K | CONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY. REFERENCE NO. R00024. TOTAL CONTRACT PRICE INCREASED BY 142,709.70 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Apr 23, 2025 | P00019 | $456.1K | SOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL, STUTTGART |
| Nov 13, 2024 | P00018 | $-18.2M | SOFA ABG-X CONSTRUCT ELEMENTARY SCHOOL, ROBINSON BARRACKS, STUTTGART |
| Sep 11, 2024 | A00003 | $0 | DISPOSAL CHANGES AND LANDSCAPING, CONTRACT FOR ABG4 ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY, AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00021 CR003 DISPOSAL CHANGES AND LANDSCAPING. ZERO USD/EUR MODIFICATION. ZERO DAYS ADDED. |
| Apr 22, 2024 | P00017 | $385.9K | SOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL, STUTTGART |
| Mar 6, 2024 | A00002 | $-0 | ROBINSON ELEMENTARY SCHOOL, STUTTGART. REF # R00018 CR002 TRANSPORT COSTS & UNKNOWN CONDITIONS. TOTAL CONTRACT PRICE IS DECREASED BY 0.10 EU. CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 94 CD BY REASON OF THIS MODIFICATION. |
| Jan 26, 2024 | P00016 | $214.4K | SOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BARRACKS, STUTTGART |
| Dec 21, 2023 | P00015 | $120.7K | SOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART |
| Nov 9, 2023 | A00001 | $109.0K | CONTRACT FOR ROBINSON ELEMENTARY SCHOOL - STUTTGART, GERMANY AB4-22-0019 AT ROBINSON BARRACKS, STUTTGART. REFERENCE NO. R00015 CR001 SCREED, KMF AND TOPSOIL |
| Sep 15, 2023 | P00014 | $34.1M | SOFA ABG-X REPLACE ES ROBINSON BARRACKS STUTTGART |
| Jul 7, 2023 | P00013 | $-715.3K | SOFA ABG-X REPLACE ES ROBINSON STUTTGART |
| Feb 1, 2023 | P00012 | $-641.3K | SOFA ABG-X ROBINSON ELEMENTARY SCHOOL - BUILDING DEMOLITION AND UTILITY RELOCATIONS |
| Nov 8, 2022 | P00011 | $0 | SOFA ABG-X CONSTRUCT ES ROBINSON BARRACKS STUTTGART ABG4 TREE CUTTING |
| Oct 28, 2022 | P00010 | $0 | SOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BKS. STUTTGART |
| Sep 15, 2022 | P00009 | $1.3M | SOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART |
| Jul 21, 2022 | P00008 | $437.6K | SOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART |
| Apr 21, 2022 | P00007 | $34.6K | SOFA ABG-X CONSTRUCT NEW ES ROBINSON BKS STUTTGART |
| Sep 30, 2021 | P00006 | $38.0M | ABGX SOFA CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BARRACKS STUTTGART GERMANY |
| Sep 18, 2020 | P00005 | $88.6K | SOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BKS STUTTGART |
| Mar 17, 2020 | P00004 | $70.8K | SOFA ABG-X CONSTRUCT NEW ELEMENTARY SCHOOL ROBINSON BARRACKS STUTTGART |
| Jun 26, 2019 | P00003 | $406.3K | SOFA ABG-X REPLACE ROBINSON BARRACKS ELEMENTARY SCHOOL STUTTGART, ADD LOST DESIGN EFFORT |
| Jan 11, 2019 | P00002 | $335.5K | SOFA - ABG-X REPLACE ROBINSON ELEMENTARY SCHOOL, STUTTGART GERMANY |
| May 8, 2017 | P00001 | $1.1M | IGF::OT::IGF ROBINSON ELEMENTARY/MI SCHOOL, STUTTGART |
| Sep 24, 2016 | 0 | $480.9K | IGF::OT::IGF ELEMENTARY SCHOOL, STUTTGART, GERMANY |
Estimated positioning window
Dec 30, 2027 – Jun 30, 2028
50/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 50/100. Available recorded signals: 45 points.
- Contract end 2028-12-30 (790 days from calculation)
- +15 points
- 13 historical awards in this buyer and category group
- +15 points
- 30 recorded award transactions
- +10 points
- Latest award action: 2026-05-28
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.