Federal contract award
W912GB17C0011
IGF::OT::IGF REPAIR 20KV POWER SUPPL GERMANY SOFA IGF::OT::IGF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST EUROPE |
| NAICS | 238990 — All Other Specialty Trade Contractors |
| PSC | Z1BG — MAINTENANCE OF ELECTRONIC AND COMMUNICATIONS FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $16.7M |
| Current contract value | $16.7M |
| Potential contract value / ceiling | $16.7M |
| Start date | Aug 10, 2017 |
| Current end date | Jan 31, 2028 |
| Potential end date | Jan 31, 2028 |
| Latest award activity | Jun 5, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 5, 2026 | A00006 | $16.0K | CONTRACT FOR ABG4 REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA. AT GRAFENWOEHR, GERMANY. REFERENCE NO. R00012. TOTAL CONTRACT PRICE INCREASED BY 15,029.02 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Apr 24, 2026 | A00005 | $-626 | CR006 NA03 (PHASE 4-5)-TO PROPERLY COMMISSION THE 20 KV SWITCHGEAR, SEVERAL ITEMS SHALL BE ADDED TO THE SPECIFICATION. AT THE SAME TIME, ITEMS CAN BE REDUCED, UNNECESSARY COMPONENTS CAN BE ELIMINATED, SO THAT NO ADDITIONAL COSTS ARE INCURRED. |
| Sep 13, 2024 | A00004 | $117.9K | CONTRACT FOR REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA. AT GRAFENWOEHR, GERMANY. REFERENCE NO. R00009 CR003 NA 09 TRANSFORMER STATION RANGE 305. CONTRACT AMOUNT IS INCREASED BY 102,624.34 EU, CONTRACT DURATION IS UNCHANGED. |
| Sep 6, 2024 | P00009 | $-971.4K | SOFA ABG-X REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA GRAFENWOEHR |
| May 24, 2024 | A00003 | $5.0K | CONTRACT FOR REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA. AT GRAFENWOEHR, GERMANY. REFERENCE NO. R00008 CR002 ADDITIONAL EMERGENCY POWER SUPPLY, PHS 2. CONTRACT AMOUNT IS INCREASED BY 4,352.58 EU, CONTRACT DURATION IS UNCHANGED. |
| Jun 28, 2023 | P00008 | $410.9K | SOFA ABG-X REPAIR 20KV POWER, GRAFENWOEHR |
| May 24, 2023 | A00002 | $272 | CONTRACT FOR REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA. AT GRAFENWOEHR, GERMANY. REFERENCE NO. R00005 CR001 CABLE PROTECTION PIPE SEALS. CONTRACT AMOUNT IS INCREASED BY 3,391.63 EU, CONTRACT DURATION IS UNCHANGED. |
| May 17, 2023 | P00007 | $9.7M | ABGX SOFA REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA GRAFENWOEHR, GERMANY |
| Dec 6, 2022 | P00006 | $-760.9K | SOFA ABG-X REPAIR 20KV POWER SUPPLY |
| Sep 9, 2022 | P00005 | $3.1M | SOFA ABG-X REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA GRAFENWOEHR |
| Jun 15, 2022 | P00004 | $-112.3K | SOFA ABG-X REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA GRAFENWOEHR |
| May 23, 2022 | P00003 | $1.9M | SOFA ABG-X REPAIR 20KV POWER SUPPLY SYSTEM GRAFENWOEHR |
| Mar 22, 2022 | P00002 | $2.5M | SOFA ABG-X REPAIR 20KV POWER SUPPLY SYSTEM AROUND TRAINING AREA GRAFENWOEHR |
| Sep 19, 2019 | P00001 | $-2.9M | SOFA ABG-X REPAIR 20KV POWER,GRAFENWOEHR |
| Sep 30, 2017 | 0 | $3.7M | IGF::OT::IGF REPAIR 20KV POWER SUPPL GERMANY SOFA IGF::OT::IGF |
Estimated positioning window
Jan 31, 2027 – Jul 31, 2027
45/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 45/100. Available recorded signals: 40 points.
- Contract end 2028-01-31 (456 days from calculation)
- +25 points
- 1 historical awards in this buyer and category group
- +0 points
- 15 recorded award transactions
- +10 points
- Latest award action: 2026-06-05
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.