Federal contract award
W912GB17C0037
IGF::OT::IGF SOFA REPAIR BLDG 2345, STUTTGART
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST EUROPE |
| NAICS | 238990 — All Other Specialty Trade Contractors |
| PSC | Z2PZ — REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $7.9M |
| Current contract value | $7.9M |
| Potential contract value / ceiling | $7.9M |
| Start date | Sep 27, 2017 |
| Current end date | Apr 23, 2024 |
| Potential end date | Apr 23, 2024 |
| Latest award activity | Sep 26, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 27 of 27 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 26, 2025 | P00007 | $-407.4K | ABGX SOFA REPAIR BLDG. 2345 TO CDC, PATCH BARKS STUTTGART GERMANY |
| Dec 2, 2024 | A00019 | $-4.4K | CONTRACT FOR ABG4 FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS. REF NO. R00025,CR022 STROBE LIGHTS, SMALLER QUANTITIES. TOTAL CONTRACT PRICE IS DECREASED BY 4,111.35 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Jun 27, 2024 | A00018 | $-3.5K | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS AT PATCH BARRACKS, STUTTGART.REFERENCE NO. R00024 CR021 PROTEC. ITEMS, MATERIAL, QUANTITIES. CONTRACT AMOUNT DECREASED BY (3,143.35)EU, CONTRACT DURATION IS UNCHANGED. |
| May 22, 2024 | A00017 | $21.7K | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00023 CR016-3 FLAT ROOF REPAIR-PART 3. CONTRACT AMOUNT IS INCREASED BY 20,316.88, CONTRACT DURATION IS UNCHANGED. |
| Feb 23, 2024 | A00016 | $-693 | CONELECTRICAL/ CARPENTRY/DEMO CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00022 CR019 ELECTRICAL/CARPENTRY/DEMO |
| Feb 22, 2024 | A00015 | $-85.8K | CONABG5- FLAT ROOF REPAIR-PART 2 CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00021 CR016-2 ABG5- FLAT ROOF REPAIR -PART 2 |
| Nov 20, 2023 | A00014 | $-26 | ASBESTOS, QUANTITIES, TECHN. ADJUSTMENTS CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00020 CR018 ASBESTOS, QUANTITIES, TECHN. ADJUSTMENTS |
| Sep 12, 2023 | A00013 | $265.2K | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00019 CR015 COST INCREASE |
| Sep 5, 2023 | P00006 | $11.0K | SOFA ABG-X REPAIR BLDG # 2345 TO CDC, PATCH BKS STUTTGART |
| Aug 23, 2023 | A00012 | $286.5K | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00017 CR016-1 FLAT ROOF REPAIR |
| Mar 8, 2023 | A00011 | $28.9K | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. CR012 ATFP DOORS, ELECTRIC BLINDS CR014 U-PROFILES ENTRANCE CEILING |
| Dec 5, 2022 | A00010 | $-143 | CONSTRUCTION |
| Nov 1, 2022 | A00009 | $90.5K | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00014 CR010 CONTROL LINE WIRING CR011 PREPONED WORK - PART II |
| Oct 31, 2022 | A00008 | $-269 | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00013 CR006-2 PREPONED WORK - PART I |
| Sep 7, 2022 | A00007 | $155.7K | FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION FOR CR009 PART I FLOOR SLAB STORAGE ROOM CDC, PATCH BARRACKS, STUTTGART GERMANY |
| Aug 5, 2022 | A00006 | $299.7K | DEMOLISH, REMOVE, AND DISPOSE OF THE EXISTING FLOOR SLAB IN THE BALLROOM AND SLOT ROOM. CONSTRUCT A NEW SUBGRADE AND REINFORCED FLOOR SLAB IN THE ENTIRE AREA OF BALLROOM AND SLOT ROOM FOR B.2345 CDC PATCH, STUTTGART, GERMANY |
| Jul 26, 2022 | P00005 | $-3.3K | ABGX SOFA REPAIR BLDG. 2345 CDC, PATCH BKS. GERMANY |
| Jul 19, 2022 | A00005 | $113.8K | FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION AND SUPERVISION TO PREPONED WORK - PART I FOR CDC, AT PATCH BARRACKS, STUTTGART |
| Jul 8, 2022 | A00004 | $42.1K | CONTRACT FOR FY13 REPAIR B2345 CHILD DEVELOPMENT CENTER, PATCH BARRACKS N1-00515-5P AT PATCH BARRACKS, STUTTGART. REFERENCE NO. R00008 CR005 ADD. ASBESTOS ABATEMENT. CONTRACT AMOUNT IS INCREASED BY 37,774.09, CONTRACT DURATION IS UNCHANGED. |
| Jun 14, 2022 | A00003 | $53.8K | FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION AND SUPERVISION TO DEMOLISH, REMOVE, AND DISPOSE OF THE EXISTING FLOOR SLAB IN THE ENTRANCE AREA FOR THE CDC B2345, STUTTGART, GERMANY |
| Jun 1, 2022 | A00002 | $12.9K | FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION AND SUPERVISION TO DEMOLISH ADDITIONAL LAYERS OF FLOORING AND REMOVE THE STORAGE CONTAINER IN FRONT OF BUILDING 2345, PATCH BARRACKS, GERMANY |
| May 17, 2022 | A00001 | $160.1K | FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION AND SUPERVISION TO CONDUCT ADDITIONAL HAZMAT ABATEMENT IN BUILDING 2345 (CR001) AND DEMOLISH AND DISPOSE OF ALL ADDITIONAL VENTILATION SYSTEM (CR002) FOR CDC, PATCH BARRACKS. |
| Nov 18, 2021 | P00004 | $877.4K | SOFA ABG-X REPAIR BLDG. 2345, CDC, PATCH BKS. STUTTGART |
| Jun 30, 2021 | P00003 | $5.6M | ABG-X SOFA CDC STUTTGART |
| Dec 19, 2019 | P00002 | $6.6K | SOFA ABG-X INCREASE ECC, BLDG 2345 TO CDC, STUTTGART |
| May 23, 2019 | P00001 | $97.7K | SOFA ABG-X REPAIR BLDG 2345 TO CDC, STUTTGART |
| Sep 30, 2017 | 0 | $275.2K | IGF::OT::IGF SOFA REPAIR BLDG 2345, STUTTGART |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.