Federal contract award
W912GB20C0011
ABGX SOFA EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1 EAST CAMP GRAFENWOEHR GERMANY
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST EUROPE |
| NAICS | 238990 — All Other Specialty Trade Contractors |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $107.7M |
| Current contract value | $107.9M |
| Potential contract value / ceiling | $107.9M |
| Start date | May 13, 2020 |
| Current end date | Dec 30, 2029 |
| Potential end date | Dec 30, 2029 |
| Latest award activity | Apr 23, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 37 of 37 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 23, 2026 | P00018 | $534.5K | CR039-FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION TO COMPLETE THE SURFACE WATER DRAINAGE SYSTEM VIA DRAINAGE BASINS INTO THE WETLAND AREA EAST OF THE ORTC PROJECT SITE. |
| Apr 22, 2026 | A00018 | $2.1K | CR 5C001-EXTERIOR GLAZING COMPONENTS INSTALLED IN OCCUPIED AREAS MUST PROVIDE A LOW LEVEL OF PROTECTION (L-LOP) IN ACCORDANCE WITH UFC 4-010-01. THE HAZARD RATING FOR THE PROPOSED EXTERIOR GLAZING COMPONENTS MUST BE NO LESS THAN VERY LOW RATING. |
| Apr 22, 2026 | A00019 | $8.2K | CR 5C002-THE NEW WASTEWATER SEWAGE MANHOLE SHALL BE EQUIPPED WITH AN EXTERNAL PIPE DROP, WHICH ENSURES THE NECESSARY ACCESSIBILITY FOR REVISIONS, INSPECTIONS, MAINTENANCE, AND CLEANING WORK IN ACCORDANCE WITH THE APPLICABLE TECHNICAL REGULATIONS. |
| Apr 20, 2026 | A00017 | $12.1K | CR 3C001-CONCRETE TESTING- INSTALLATION OF CONCRETE OF MONITORING CLASS 2. CLASSIFICATIONS IN THE MONITORING CLASSES AND MONITORING OF THE INSTALLATION ACCORDING TO DIN 1045-3. MONITORING CONCRETE QUALITY FROM C25/C30. |
| Apr 16, 2026 | A00015 | $25.1K | CR035 SEALING OF CABLE CONDUIT-PROVIDE ADDITIONAL CABLE CONDUIT SEALS, AND QTY REDUCTIONS: LOW VOLTAGE CABLES CR037 FLEX CONDUIT TO TRANSFORMERS-PROVIDE A FLEXIBLE CONDUIT SYSTEM FOR POWER CABLES FROM MANHOLES TO TRANSFORMER STATIONS |
| Apr 16, 2026 | A00016 | $237.5K | CR018 - UXO INVESTIGATIONS- FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION TO CONDUCT ADDITIONAL SURVEYS/SOUNDING TO DETERMINE THE EXTENT OF UXO PRESENCE AND DENSITY ON THE ORTC 1.1A CONSTRUCTION AREA. |
| Apr 7, 2026 | P00017 | $4.5M | ABG-3 INCREASE ESTIMATED CONSTRUCTION COSTS AND FEES FOR PART 6 EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) - PHASE 1.1A GRAFENWOEHR-PART 6 DINING FACILITY (DFAC) |
| Apr 6, 2026 | A00014 | $32.1K | CR042 - NA 91.30 - REPLACE HV/MV CABLE VAULT COVERS- FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION TO REPLACE TWENTY-SIX (26) INSTALLED HV/MV MANHOLE VAULT COVERS WITH NEW WATERTIGHT COVERS. |
| Apr 1, 2026 | A00013 | $196.0K | CR014 NA-91.09, RE-ROUTE EXISTING SIGNALS COMM CABLE CR027 NA-91.18, MANHOLE ENTRY LADDERSCR028 NA-91.19, CONTAMINATED MATERIAL DISPOSALCR029 NA-91.20, LOWER DISTRICT HEATING LINES A VMS |
| Mar 31, 2026 | P00016 | $2.0M | DISPOSE OF APPROX. 20,000 M OF LIGHTLY TO HEAVILY CONTAMINATED TOPSOIL, INCLUDING LOADING, TRANSPORT, AND FINAL DISPOSAL AT CERTIFIED DISPOSAL SITES. |
| Mar 26, 2026 | A00012 | $10.2K | SOIL REPLACEMENT IS NECESSARY TO ENSURE THE PLATE LOAD TESTS PASS. DURING THE EXCAVATION WORK, WATER ACCUMULATED FROM THE EMPTY PIPELINES EXISTING IN THE SUBSOIL LEAKED INTO THE SUBSOIL. |
| Mar 24, 2026 | A00010 | $0 | CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. |
| Mar 24, 2026 | A00011 | $0 | CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. |
| Mar 23, 2026 | A00009 | $0 | CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. |
| Mar 18, 2026 | A00008 | $0 | CHANGE REQUIRED TO IMPLEMENT CURRENT UFC CRITERIA FOR FACILITY BATTERY SYSTEMS. |
| Nov 17, 2025 | P00014 | $-258.0K | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1.1A, EAST CAMP GRAFENWOEHR |
| Sep 30, 2025 | P00013 | $-86.2K | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1.1A, GRAFENWOEHR |
| Sep 12, 2025 | A00007 | $84.2K | CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY AT GRAFENWOHR, GERMANY. REFERENCE NO. R00018. TOTAL CONTRACT PRICE INCREASED BY 73,565.78 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Sep 12, 2025 | P00012 | $-1.6M | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1.1A, EAST CAMP GRAFENWOEHR |
| Jul 18, 2025 | A00006 | $283.8K | CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY. REFERENCE NO. R00015. TOTAL CONTRACT PRICE INCREASED BY 248,127.58 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Jul 17, 2025 | A00005 | $444.3K | CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY. REFERENCE NO. R00014. TOTAL CONTRACT PRICE INCREASED BY 388,348.75 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Jul 17, 2025 | P00011 | $393.8K | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX, ORTC, PHASE 1.1A GRAFENWOEHR |
| May 27, 2025 | P00010 | $31.2M | SOFA ABG-X CONSTRUCT EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1.1A |
| May 13, 2025 | A00004 | $283.6K | CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY, REFERENCE NO. R00012. TOTAL CONTRACT PRICE INCREASED BY 247,947.66 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Dec 12, 2024 | P00009 | $1.5M | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1.1A GRAFENWOEHR |
| Sep 20, 2024 | A00003 | $1.1M | CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY AT GRAFENWHR, GERMANY. REFERENCE NO. R00009 CR002 ABG5-01, ADDITIONAL UXO CLEARANCE. CONTRACT AMOUNT IS INCREASED BY 999,807.99 EU, CONTRACT DURATION IS UNCHANGED. |
| Sep 12, 2024 | A00002 | $87.1K | CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMAN AT GRAFENWOHR, GERMANY. REFERENCE NO. R00008 CR023 NA 92.06, NORTH/COMPACT XFMR STN CHANGES. CONTRACT AMOUNT IS INCREASED BY 75,820.86, CONTRACT DURATION IS UNCHANGED. |
| Jul 31, 2024 | A00001 | $457.0K | CONTRACT FOR ABG4 EDI OPERATIONAL READINESS TRAINING COMPLEX GRAFENWOEHR GERMANY AT GRAFENWHR, GERMANY. REFERENCE NO. R00007 CR013 ABG5-02, REVISE RAINWATER DRAIN SYSTEM. CONTRACT AMOUNT IS INCREASED BY 397,975.47 EU, CONTRACT DURATION IS UNCHANGED. |
| May 8, 2024 | P00008 | $9.3M | PART 5: CONSTRUCTION |
| Apr 26, 2024 | P00007 | $25.3M | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1.1A GRAFENWOEHR |
| Jul 25, 2023 | P00006 | $227.2K | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC), GRAFENWOEHR |
| Apr 14, 2023 | P00005 | $14.6M | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC PHASE 1.1A |
| Sep 30, 2022 | P00004 | $13.5M | SOFA ABG-X EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1.1A EAST CAMP GRAFENWOEHR |
| Nov 30, 2021 | P00003 | $242.8K | ABGX SOFA EDI OPERATIONAL READINESS TRAINING COMPLEX (ORTC) PHASE 1, EAST CAMP GRAFENWOEHR GERMANY |
| Sep 30, 2021 | P00002 | $100.0K | ABGX SOFA EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1, GRAFENWOEHR GERMANY |
| Sep 29, 2020 | P00001 | $249.2K | ABGX SOFA EDI OPERATIONAL READINESS TRAINING COMPLEX PHASE 1 GRAFENWOEHR GERMANY |
| May 13, 2020 | 0 | $2.8M | ABGX SOFA EDI OPERATIONAL READINESS TRAINING COMPLEX ORTC PHASE 1 EAST CAMP GRAFENWOEHR GERMANY |
Estimated positioning window
Dec 30, 2028 – Jun 30, 2029
40/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 40/100. Available recorded signals: 35 points.
- Contract end 2029-12-30 (1155 days from calculation)
- +5 points
- 32 historical awards in this buyer and category group
- +15 points
- 37 recorded award transactions
- +10 points
- Latest award action: 2026-04-23
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.