Federal contract award
W912GB22F0172
SOFA: CONSTRUCTION OF SCHOOL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST EUROPE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | W912GB19D0023 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $491.5K |
| Current contract value | $491.5K |
| Potential contract value / ceiling | $491.5K |
| Start date | Aug 17, 2022 |
| Current end date | Feb 3, 2026 |
| Potential end date | Feb 3, 2026 |
| Latest award activity | Jan 12, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jan 12, 2026 | A00006 | $0 | SANITARY SEPTIC SYSTEM DESIGN DELAY ASSOCIATED DELAYS TO CONSTRUCTION START AS A RESULT OF THE TIME REQUIRED FOR DESIGN, REVIEW, AND APPROVAL OF THE SANITARY SEWER SEPTIC SYSTEM AND STORM DRAINAGE SYSTEM CHANGES FROM CR006. |
| Oct 17, 2025 | P00002 | $19.6K | SOFA: INSTALL A NEW SEPTIC SYSTEM, ON THE SITE, TO SERVE THE NEW FACILITY IN LIEU OF CONNECTING THE NEW FACILITY SANITARY SYSTEM TO THE MUNICIPAL SANITARY SEWER NETWORK AND CONNECT BUILDING DOWNSPOUTS TO SPLASH BLOCKS. |
| Sep 12, 2025 | A00005 | $41.3K | SOFA: FURNISH ALL NECESSARY DESIGN, PLANT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, AND SUPERVISION TO PROVIDE NEW FENCE FROM POINT 1 (P1) TO POINT 2 (P2), INTERIOR COOLING CONDITIONS, AND WATER STORAGE CAPACITY. |
| Aug 14, 2025 | A00004 | $0 | SOFA: HOST NATION PERMIT DELAY TIME EXTENSION ISSUED IN ACCORDANCE WITH FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) PART (B)(2). |
| Jun 17, 2025 | A00003 | $0 | SOFA: HOST NATION PERMIT DELAY TIME EXTENSION ISSUED IN ACCORDANCE WITH FAR 552.249-10, DEFAULT (FIXED PRICE CONSTRUCTION). |
| Jan 30, 2024 | A00002 | $0 | SOFA: HOST NATION PERMIT DELAY TIME EXTENSION ISSUED IN ACCORDANCE WITH FAR 552.249-10, "DEFAULT (FIXED PRICE CONSTRUCTION). |
| Nov 2, 2022 | A00001 | $0 | SOFA: THE REQUIREMENT FOR THE GOVERNMENT PROJECT OFFICE IS NOT REQUIRED AND IS TO BE REMOVED FROM THE CONTRACT DOCUMENTS. |
| Sep 26, 2022 | P00001 | $0 | SOFA CONSTRUCTION OF SCHOOL |
| Aug 17, 2022 | 0 | $430.5K | SOFA: CONSTRUCTION OF SCHOOL |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.