Federal contract award
W912GB22F0295
REPAIR BUILDING 196 ROBINSON BARRACKS, STUTTGART, GERMANY
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST EUROPE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | W912GB22D0008 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $11.6M |
| Current contract value | $11.6M |
| Potential contract value / ceiling | $11.6M |
| Start date | Sep 21, 2022 |
| Current end date | Oct 28, 2026 |
| Potential end date | Oct 28, 2026 |
| Latest award activity | May 21, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 21, 2026 | A00007 | $5.6K | THE CONTRACT IS BEING MODIFIED TO INCLUDE THE INSTALLATION OF A FIRE ALARM SYSTEM FROM THE MANUFACTURER HEKATRON. |
| Mar 17, 2026 | A00006 | $195.3K | PROVIDE COMPLETE REPLACEMENT OF ALL UNDERGROUND SANITARY PIPING BRANCHES UP TO THE EXISTING MAIN SEWER LINE. REMOVE EXISTING LINES. TEST SANITARY LINES IN ACCORDANCE WITH INTERNATIONAL CODE COUNCIL (ICC), UFGS, UFC, AND ANY OTHER GOVERNING DOCTRINE. |
| Feb 13, 2026 | A00005 | $447.9K | INSTALLATION OF A LIGHTWEIGHT SCREED MATERIAL UNDER THE SPECIFIED LINOLEUM IN THE BEDROOMS AND LIVING ROOMS. THE SUBFLOORING INSTALLATION IS NEEDED IN ORDER FOR THE TOP OF LINOLEUM ELEVATION TO BE FLUSH WITH THE ADJACENT ROOMS. |
| Aug 1, 2025 | A00004 | $63.6K | CONTRACT FOR REPAIR BLDG 196 ROBINSON BARRACKS, DC-22-0042 AT KELLEY BARRACKS, STUTTGART, GERMANY. REFERENCE NO. R00008. TOTAL CONTRACT PRICE INCREASED BY 55,386.04 EU. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Sep 30, 2024 | A00003 | $11.6K | CONTRACT FOR REPAIR BLDG 196 ROBINSON BARRACKS DC-22-0042 AT KELLEY BARRACKS, STUTTGART, GERMANY. REFERENCE NO. R00007 CR013 SPECIES CONSERVATION. CONTRACT AMOUNT IS INCREASED BY 10,061.76 EU, CONTRACT DURATION IS UNCHANGED. |
| Sep 30, 2024 | P00004 | $518.8K | CONTRACT FOR REPAIR BLDG. 196 ROBINSON BARRACKS DC-22-0042 AT KELLEY BARRACKS, STUTTGART, GERMANY. REFERENCE NO. R00006 CR010 HAZARDOUS /CONTAMINATED MATERIAL REMOVAL. CONTRACT AMOUNT IS INCREASED BY 451,503.12 EU, CONTRACT DURATION IS UNCHANGED. |
| Jul 23, 2024 | A00002 | $85.0K | CONTRACT FOR REPAIR BLDG 196 ROBINSON BARRACKS DC-22-0042 AT KELLEY BARRACKS, STUTTGART, GERMANY. REFERENCE NO. R00005 CR011 PERIMETER BACKFILL. CONTRACT AMOUNT IS INCREASED BY 74,000.00 EU, CONTRACT DURATION IS UNCHANGED. |
| Mar 26, 2024 | P00003 | $652.6K | BUILDING 196 REPAIR |
| Sep 28, 2023 | A00001 | $253.8K | REPAIR BLDG 196 ROBINSON BARRACKS DC-22-0042 AT KELLEY BARRACKS, STUTTGART, GERMANY. REFERENCE NO R00003 CR002 EXT WINDOWS CR003 MISC DESCOPE CR004 MAILBOXES INSTALL CR005 REMOVE CHIMNEY CR007 ROLLADEN ROLLING SHUTTER INSTALL CR008 KITCHEN FLOOR/WALL |
| Mar 27, 2023 | P00002 | $-763.3K | DESCOPE THE MAILROOM ON BUILDING 196 REPAIR AT STUTTGART |
| Nov 8, 2022 | P00001 | $0 | REPAIR BLDG. 19 ROBINSON BARRACKS, STUTTGART, GERMANY MODIFICATION TO ISSUE NTP |
| Sep 20, 2022 | 0 | $10.1M | REPAIR BUILDING 196 ROBINSON BARRACKS, STUTTGART, GERMANY |