Federal contract award

W912GB25C0011

SOFA: CONSTRUCT PARALLEL TAXIWAY AND CONSTRUCT AIRFIELD UPGRADES, KECSKEMET AIR BASE, HUNGARY

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST EUROPE
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1BD — CONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$35.4M
Current contract value$35.4M
Potential contract value / ceiling$35.4M
Start dateApr 7, 2025
Current end dateDec 4, 2027
Potential end dateDec 4, 2027
Latest award activityMay 5, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 5, 2026A00005$759CHANGE:CR006 TITLE:CARGO PROTECTION OF UNFORESEEN CABLE FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIP., TRANSPORTATION TO: PROVIDE ADDITIONAL FILL TO ACHIEVE THE REQUIRED SURFACE ELEVATIONS OF THE PARALLEL TWY, AF PARKING APRON, AND CARGO ROAD.
Apr 28, 2026A00004$430.6KCHANGE: CR003 TITLE: EARTHWORK FOR EXISTING SURFACE FURNISH ALL NECESSARY PLANT, LABOR, MATERIAL, EQUIP., TRANSPORTATION TO: PROVIDE ADDITIONAL FILL TO ACHIEVE THE REQUIRED SURFACE ELEVATIONS OF THE PARALLEL TWY, AF PARKING APRON, AND CARGO ROAD.
Apr 24, 2026A00003$412.0KCR001 ARCHAEOLOGICAL SITE INVESTIGATION PROVIDE FULL-SURFACE EXCAVATION AND SOIL REMOVAL TO SUPPORT THE ARCHAEOLOGICAL SITE INVESTIGATIONS IDENTIFIED IN SECTION 3.4.1 OF THE ERD 1 AT THREE ARCHAEOLOGICAL SITES WITHIN THE PROJECT BOUNDARY.
Mar 30, 2026A00002$15.0KCR005 DEMOLITION OF UNFORESEEN CABLES DEMOLISH AND REMOVE APPROXIMATELY 500 METERS OF UNFORESEEN DIRECT-BURY CABLES BETWEEN STATION 2+150 AND LADDER TWY Z.
Mar 6, 2026A00001$75.7KCR002 APRON UNFORESEEN SW PIPE DEMOLISH AN UNFORESEEN 1-METER DIAMETER CONCRETE STORMWATER DRAINAGE PIPE UNDER THE AIRFIELD PARKING APRON AND TAXIWAY TO THE EXTENTS OF CONSTRUCTION LIMITS. CAP EACH END OF DRAINAGE PIPE AT THE EXTENTS OF DEMOLITION.
May 19, 2025P00001$0NOTICE TO PROCEED GIVEN
Apr 7, 20250$34.4MSOFA: CONSTRUCT PARALLEL TAXIWAY AND CONSTRUCT AIRFIELD UPGRADES, KECSKEMET AIR BASE, HUNGARY

Estimated positioning window

Dec 4, 2026 – Jun 4, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-12-04 (398 days from calculation)
+25 points
2 historical awards in this buyer and category group
+10 points
7 recorded award transactions
+10 points
Latest award action: 2026-05-05
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.