Federal contract award

W912HN20C3006

PN 88724 SCI TRAINING, RESEARCH&NETWORK CENTER, FORT GORDON, GEORGIA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW074 ENDIST SAVANNAH
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$99.7M
Current contract value$102.6M
Potential contract value / ceiling$102.6M
Start dateJun 19, 2020
Current end dateDec 14, 2023
Potential end dateDec 14, 2023
Latest award activityMay 11, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 61 of 61 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 11, 2026A00052$76.3KMCA1 - SCI TRAINING, RESEARCH NETWORK CENTER AT FORT GORDON, GA GC074 REA - CURTAIN WALL DELAYS
Feb 23, 2026A00051$274.9KMCA1 - SCI TRAINING, RESEARCH NETWORK CENTER AT FORT GORDON, GA
Jan 27, 2026A00050$0MCA1 - SCI TRAINING, RESEARCH NETWORK CENTER AT FORT GORDON, GA
Nov 12, 2025A00049$0PRIMARY FACILITY CONSTRUCTION MCA1 GC072 MOVE STAIRWELL THERMOSTATS FOR FCUS ADDED COST AND TIME, $8,687.63, 2 CALENDAR DAYS.
Sep 29, 2025A00048$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC071 DELETE LIGHTS IN LABS 443 & 446 DELETED COST -$5,437.00, NO TIME
Sep 25, 2025A00047$68.3KPRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC070 GC060 FOLLOW-UP, ADDED COST $68,308.00, NO TIME, ADDITIONALLY, A CORRECTION FOR A00019 MOVE FUNDS FROM CLIN 0003 TO CLIN 0001.
Sep 12, 2025A00046$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC068 ADD FILM FOR COMMAND SUITE & EXIT SIGNS ADDED COST $7,389.00, ADDED TIME 4 CALENDAR DAYS
Aug 29, 2025A00045$12.3KPRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC069 DELETE X-10 LOCKS, ADDED COST $12,334.00, ADDED TIME 3 NON-COMPENSABLE CALENDAR DAYS
May 8, 2025A00044$-55.8KPRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC060 DESCOPE IRRIGATION, A CREDIT OF $55,780.00. UNILATERAL.
Apr 17, 2025A00043$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC067 DOOR FIRE RATING, ADDED COST $2,663.00 ADDED TIME 1 CALENDAR DAY
Nov 12, 2024A00042$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC065 HURRICANE HELENE EXCUSABLE DELAY NO COST, ADDED TIME 19 CALENDAR DAYS.
Nov 7, 2024A00041$0PRIMARY FACILITY CONSTRUCTION MCA1 GC063 FLOOR STOPS FOR DOORS ADDED COST $379.00, 1 CALENDAR DAY.
Oct 31, 2024A00040$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC062 ADD RF MEDIA CONVERTERS AND WAVE GUIDES ADDED COST $6,799.00 AND TIME 13 CALENDAR DAYS.
Aug 14, 2024A00038$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC061 ELEVATOR LIGHTS & POWER FOR DAMPER R00044 A0040, ADDED COST $5,914.00, ADDED TIME 3 CALENDAR DAYS, UNILATERAL
Jun 18, 2024A00037$6.0KPRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC059 MISCELLANEOUS ARCHITECTURAL CHANGES ADDED COST $6,008.00, ADDED TIME $3 NON-COMPENSABLE CALENDAR DAYS
May 9, 2024A00036$0PRIMARY FACILITY CONSTRUCTION MCA1 UNILATERAL MODIFICATION FOR GC056 MISC. CHANGES ADDED COST $33,387.64 ADDED TIME 9 CALENDAR DAYS.
Apr 26, 2024A00035$9.3KPRIMARY FACILITY CONSTRUCTION MCA1 TELECOMMUNICATIONS PATHWAY CORRECTIONS ADDED COST $9,280.00, ONE CALENDAR DAY, UNILATERAL
Feb 21, 2024A00034$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC052 DELETE REQUIREMENT FOR KEYED CONNECTORS NO TIME OR COST
Feb 13, 2024A00033$10.8KPRIMARY FACILITY CONSTRUCTION MCA1 GC051 REMOVE BOLLARD ON HTHW LID ADDED COST $10,762.00 NO TIME
Jan 12, 2024A00032$0PRIMARY FACILITY CONSTRUCTION MCA1 GC054 SECURE PERIMETER CHANGES 2 ADDED COST $93,066.00 AND TIME 41 CALENDAR DAYS. UNILATERAL.
Jan 10, 2024A00031$0PRIMARY FACILITY CONSTRUCTION MCA1 MOD FOR GC049 CHILLED BEAM/LIGHTING CONFLICT ADDED COST $9,381.93, NO TIME.
Dec 13, 2023A00030$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC055 WEATHER JULY-SEP 2023, ADD TWO DAYS
Dec 11, 2023A00029$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC048 SECURE PERIMETER CHANGES ADDED COST $123,222.00 NO TIME.
Sep 12, 2023A00028$22.2KPRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC046 DOCK STATION CHANGES & RELOCATE BOLLARDS ADDED COST NO TIME, $22,161.00.
Aug 15, 2023A00027$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC045 RELOCATE HUMIDIFIER&ELEVATOR CTRL PANEL ADDED COST NO TIME, $40,260.00
Jul 14, 2023P00010$456.9KPRIMARY FACILITY CONSTRUCTION
Jun 21, 2023A00026$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC042 MOVE EXTERIOR LIGHTS AND POWER FOR PUMPS, ADDED COST $21,637.00, NO TIME.
May 25, 2023A00025$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION GC041 DELETE INSULATION FROM EXTERIOR WALLS, CREDIT -$77,259.00.
Apr 26, 2023A00024$71.6KPRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 REA - CHILLED WATER STRIKE ADDED COST $71,564.00, NO TIME
Apr 5, 2023A00023$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC038 REA CURTAINWALL SUPPLY CHAIN DELAY NO COST, ADDED TIME 67 CALENDAR DAYS.
Mar 14, 2023A00022$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC040 DOOR HARDWARE CONFLICTS ADDED COST $48,361.00, NO TIME.
Feb 3, 2023A00021$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC039 MISC. WALL CHANGES R00027 A00023, ADDED COST $47,641.00, NO TIME
Sep 30, 2022A00020$0PRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC032 CORRECT ROOF DRAINS AT SLAB ON GRADE ADDED COST $99,600.00 NO TIME.
Sep 16, 2022A00019$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC033 ADD QEI ACCEPTANCE TESTING, INSP. CX ADDED COST $10,250.00, NO TIME.
Aug 16, 2022A00018$0PRIMARY FACILITY CONSTRUCTION WEATHER TIME EXTENSION JAN 22 - JUN 22 ADDED 5 CALENDAR DAYS NO COST.
Jul 1, 2022A00017$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC028 MISC. ELECTRICAL CHANGES ADDED COST NO TIME
Apr 27, 2022A00016$0PRIMARY FACILITY CONSTRUCTION GC027 COVID-19 DELAYS THROUGH 12JAN22 (UNILATERAL) R00021 A00018 NO COST ADDED TIME 8 CALENDAR DAYS
Mar 4, 2022A00015$-72PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC017 PROVIDE RM621 WALLS, LIGHTS, FINISHES R00020 ADDED COST $46,407.00 ON CLIN 0001 AN ADJUSTMENT OF -$72.00 ON CLIN 0002 BECAUSE GC021 R00017 WAS SHORTED A DEDUCTION OF -$72.00.
Feb 11, 2022A00013$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC025 PARTNERING LAYDOWN YARD NO COST NO TIME. MCA1
Feb 11, 2022A00014$25.6KPRIMARY FACILITY CONSTRUCTION MCA1 MODIFICATION FOR GC026 USACE OFFICE TRAILER UPGRADES R00019 ADDED COST $25,627.00, AND NO TIME.
Feb 4, 2022A00011$29.8KPRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC023 CONNECT SALTZMAN HALL ROOF DRAIN ADDED COST $29,786.00, NO TIME
Feb 4, 2022A00012$-60.1KPRIMARY FACILITY CONSTRUCTION MODIFICATION FOR MCA1 GC021 COMMS DUCT BANK CONFLICT REDUCED COST -$60,180.00, NO TIME
Jan 28, 2022A00010$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC020 BATHROOM ACCESSORY CHANGES ADDED COST $9,099.00 NO TIME. MCA1
Nov 1, 2021A00009$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC009 ELEVATOR AND LEED V4.1 SPEC CHANGE NO COST NO TIME MCA1
Oct 28, 2021A00008$6.3KGC019 WEST HOT WATER TIE-INS ADDED COST $6,307.00, NO TIME FOR MCA1
Oct 28, 2021P00008$0PRIMARY FACILITY CONSTRUCTION
Oct 12, 2021P00007$870.8KPRIMARY FACILITY CONSTRUCTION
Apr 29, 2021P00006$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC006 ARCH. ELECTRICAL PANEL CONFLICT ADDED COST $7,000.00 AND NO TIME.
Apr 27, 2021P00005$0PRIMARY FACILITY CONSTRUCTION UNILATERAL GC016 HOT WATER VAULT CHANGES ADDED COST $35,846.00 NO TIME,
Apr 15, 2021A00007$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC004 GEORGIA POWER REVISED SCOPE ADDED COST $135,266.00 AND ADD TIME 43 CALENDAR DAYS.
Apr 9, 2021A00006$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC005 R00010 REVISED STORM DRAIN AND DETENTION POND CREDIT FOR -$24,109.00 NO TIME
Apr 8, 2021A00005$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC010 ATLANTA GAS REROUTE CREDIT -$26,990.18, NO TIME CHANGE.
Apr 5, 2021A00003$0PRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC011 ISEC CABLES AND TELECOM SERVER RACKS ADDED COST $66,781.00, NO TIME.
Apr 5, 2021A00004$0PRIMARY FACILITY CONSTRUCTION GC008 TR ROOMS TELECOM RACK POWER ADDED COST $5,992.00 NO TIME.
Mar 2, 2021A00002$30.7KPRIMARY FACILITY CONSTRUCTION MODIFICATION FOR GC014 AUD WATERLINE CONFLICTS HW VAULT ADDED COST $30,708.00 NO TIME.
Dec 22, 2020P00004$0PRIMARY FACILITY CONSTRUCTION-ADMINISTRATIVE CLARIFICATION
Dec 21, 2020P00003$872.8KREMOVAL OF ABANDONED STEAM PIPES
Nov 5, 2020A00001$0PRIMARY FACILITY CONSTRUCTION MODIFICATION GC001 CHANGES TO ESCP DRAWINGS R00001, NO COST, NO TIME, MCA1
Oct 23, 2020P00002$87.1KPN 88724 SCI TRAINING, RESEARCH&NETWORK CENTER (MCA1), FORT GORDON, GEORGIA
Jul 17, 2020P00001$0NOTICE TO PROCEED MODIFICATION FOR PN 88724 SCI TRAINING, RESEARCH&NETWORK CENTER (MCA1), FORT GORDON, GEORGIA
Jun 19, 20200$96.9MPN 88724 SCI TRAINING, RESEARCH&NETWORK CENTER, FORT GORDON, GEORGIA