Federal contract award
W912HY23C0018
DESIGN-BID-BUILD REINFORCEMENT OF EXISTING LEVEES FROM SABINE PASS TO GALVESTON BAY, PORT ARTHUR AND VICINITY JEFFERSON COUNTY, TEXAS FOR COASTAL STORM RISK MANAGEMENT AND ECOSYSTEM RESTORATION AND HURRICANE FLOOD PROTECTION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W076 ENDIST GALVESTON |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1KA — CONSTRUCTION OF DAMS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $99.4M |
| Current contract value | $99.4M |
| Potential contract value / ceiling | $104.9M |
| Start date | Aug 31, 2023 |
| Current end date | Feb 5, 2028 |
| Potential end date | Feb 5, 2028 |
| Latest award activity | May 20, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 20, 2026 | P00003 | $1.3M | REA ZONE 7-1 SLIP JOINT UNDERMINING LEAK |
| Apr 2, 2026 | A00005 | $91.9K | REA ZONE 7-1 SLIP JOINT UNDERMINING LEAK |
| Feb 25, 2026 | A00004 | $40.3K | ZONE 5 FLOOD PROTECTION ACTION |
| Sep 22, 2025 | A00003 | $39.7K | ZONES 5, 6, AND 7 |
| Aug 29, 2025 | A00002 | $163.4K | REA HURRICANE FRANCINE |
| Mar 27, 2025 | P00002 | $0 | ZONES 5, 6, AND 7 |
| Oct 11, 2024 | A00001 | $0 | CT::SWG::CT REPLACE SITE OFFICE WITH QA TESTING LAB PROVIDING A 3/4"WATER LINE & SINGLE PHASE 200 AMP 110/220 VOLT POWERFENCE SHALL BE 70'X80'WITH AT LEAST 4" COMPACTED ROAD BASEEXISTING GATE RELOCATED TO NW CORNER REPLACED BY A 12' WIDE ROLLER GATE. |
| Sep 4, 2024 | P00001 | $2.8M | ZONES 8 - EXERCISE OPTION 2 FOR CLINS 0013, 0014 AND 0015 |
| Sep 8, 2023 | 0 | $94.2M | DESIGN-BID-BUILD REINFORCEMENT OF EXISTING LEVEES FROM SABINE PASS TO GALVESTON BAY, PORT ARTHUR AND VICINITY JEFFERSON COUNTY, TEXAS FOR COASTAL STORM RISK MANAGEMENT AND ECOSYSTEM RESTORATION AND HURRICANE FLOOD PROTECTION |
Estimated positioning window
Feb 5, 2027 – Aug 5, 2027
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2028-02-05 (461 days from calculation)
- +25 points
- 1 historical awards in this buyer and category group
- +0 points
- 9 recorded award transactions
- +10 points
- Latest award action: 2026-05-20
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.