Federal contract award
W912NW23C0004
POWERTRAIN CLEANING SYSTEMS: 1. IMMERSION CLEANING SYSTEM, 2. WASTEWATER MINIMIZATION SYSTEM, 3. PRESSURE WASHING SYSTEM, AND 4. REVERSE OSMOSIS/DEIONIZED WATER SYSTEM.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK CCAD CONTR OFF |
| NAICS | 333248 — All Other Industrial Machinery Manufacturing |
| PSC | 3694 — Clean Work Stations, Controlled Environment, and Related Equipment |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $20.1M |
| Current contract value | $32.1M |
| Potential contract value / ceiling | $32.1M |
| Start date | Sep 26, 2023 |
| Current end date | Aug 24, 2026 |
| Potential end date | Oct 8, 2026 |
| Latest award activity | Apr 23, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 23, 2026 | P00004 | $0 | 1. GENERAL 1.1. OBJECTIVE: THE CONTRACTOR SHALL MANUFACTURE, DELIVER, AND INSTALL A TURNKEY IMMERSION CLEANING AND WASTEWATER MINIMIZATION SYSTEM.1.2. CORPUS CHRISTI ARMY DEPOT (CCAD) MISSION: CCAD PERFORMS OVERHAUL, REPAIR, MODIFICATION, RETROFI |
| Feb 5, 2026 | P00003 | $0 | 1. GENERAL 1.1. OBJECTIVE: THE CONTRACTOR SHALL MANUFACTURE, DELIVER, AND INSTALL A TURNKEY IMMERSION CLEANING AND WASTEWATER MINIMIZATION SYSTEM.1.2. CORPUS CHRISTI ARMY DEPOT (CCAD) MISSION: CCAD PERFORMS OVERHAUL, REPAIR, MODIFICATION, RETROFI |
| Jan 20, 2026 | P00002 | $12.1M | 1. GENERAL 1.1. OBJECTIVE: THE CONTRACTOR SHALL MANUFACTURE, DELIVER, AND INSTALL A TURNKEY IMMERSION CLEANING AND WASTEWATER MINIMIZATION SYSTEM.1.2. CORPUS CHRISTI ARMY DEPOT (CCAD) MISSION: CCAD PERFORMS OVERHAUL, REPAIR, MODIFICATION, RETROFI |
| Sep 24, 2025 | P00001 | $0 | FUNDING FOR CLIN 0001 |
| Sep 26, 2023 | 0 | $20.1M | POWERTRAIN CLEANING SYSTEMS: 1. IMMERSION CLEANING SYSTEM, 2. WASTEWATER MINIMIZATION SYSTEM, 3. PRESSURE WASHING SYSTEM, AND 4. REVERSE OSMOSIS/DEIONIZED WATER SYSTEM. |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.