Federal contract award
W912P520C0018
BARKLEY POWER PLANT TURBINE GENERATOR REHABILITATION FOR UNITS 1-4.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W072 ENDIST NASHVILLE |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Z2PZ — REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $80.4M |
| Current contract value | $80.4M |
| Potential contract value / ceiling | $84.0M |
| Start date | Sep 29, 2020 |
| Current end date | Sep 15, 2027 |
| Potential end date | Sep 15, 2027 |
| Latest award activity | May 15, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 40 of 40 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 15, 2026 | P00017 | $741.8K | W912P5-20-C-0018 P00017: BAR-TG - BH010-2, BH016-2, BH021 AND BH027-2 |
| May 7, 2026 | A00022 | $161.3K | BAR TG MOD A00021 - CASE BH035, VEQ FOR OPTIONS CLINS ABOVE 115 PERCENT |
| Feb 27, 2026 | A00021 | $263.5K | BAR TG MOD A00021 - CASE BH035, VEQ FOR OPTIONS CLINS ABOVE 115 PERCENT |
| Oct 10, 2025 | A00020 | $25.3K | A00020 BH038 UNIT 3 TO UNIT 2 OUTAGE RESEQUENCE |
| Sep 26, 2025 | P00016 | $0 | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Sep 24, 2025 | P00015 | $396.0K | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Sep 22, 2025 | A00019 | $-3.5K | MODIFICATION A000019 BH002 GENERATOR & STATION PUMP WATER FLOWMETER |
| Sep 19, 2025 | A00018 | $280.3K | MODIFICATION A00018 BH036 UNIT 4 LOWER BRACKET REPAIRS |
| Aug 28, 2025 | A00017 | $92.0K | A00017 BH041 POWERHOUSE MVMT U4 NCR 9801 259 PART 1 |
| Jul 16, 2025 | A00016 | $94.5K | CASE A00016 BH022 HEAD COVER BOLTED CONNECTION UNIT 4 |
| Jul 8, 2025 | P00014 | $0 | TGB COVERS CHANGE MOD |
| May 5, 2025 | A00015 | $50.7K | CASE BH030 & BH034 A00015 "INC. OPT. CLINS 115% / PARTNERING 2025" |
| Apr 24, 2025 | P00013 | $160.4K | EXERCISE OPTIONS 0538 & 0548 |
| Apr 2, 2025 | A00014 | $269.8K | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Feb 28, 2025 | P00012 | $35.3K | EXERCISE OPTION 539 MACHINIST HIRE. |
| Feb 18, 2025 | A00013 | $87.0K | MODIFICATION BH018 A00013 "POTENTIAL TRANSFORMER" |
| Jan 29, 2025 | A00012 | $7.2K | CASE BH017 MODIFICATION A00012 GUIDE BEARING PUCKS |
| Dec 11, 2024 | A00011 | $20.3K | A00011 BH029 TECH SUB ADD WORK 4. INTERMEDIATE SHAFT |
| Dec 9, 2024 | A00010 | $40.0K | CASE A00010 BH027 "UNIT 4 DR LINER CONTRACTION PART 1 NTP" |
| Nov 26, 2024 | P00011 | $200.0K | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Nov 25, 2024 | A00009 | $64.6K | MODIFICATION A00009 TECHNICAL SUBMITTAL ADDITIONAL WORK 3 |
| Nov 20, 2024 | A00008 | $247.5K | MOD A00008 CASE BH025 |
| Nov 15, 2024 | A00007 | $100.0K | CASE BH-019-1 TECHNICAL SUBMITTAL ADDITIONAL WORK 1 MOD A00007 |
| Nov 13, 2024 | A00006 | $140.0K | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Oct 7, 2024 | P00010 | $343.3K | EXERCISE OPTIONAL CLINS 0192, 0302, 0408 |
| Sep 20, 2024 | P00009 | $0 | ADDING PAYMENT PROCEDURES FOR OFF-SITE MATERIALS. |
| Jul 23, 2024 | P00008 | $86.8K | OPTIONS 0196, 0210 AND 0215 |
| May 3, 2024 | A00005 | $11.5K | CASE BH012 MODIFICATION A00005 "PARTNERING MEETINGS 1 & 2" |
| Apr 17, 2024 | A00004 | $325.4K | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Apr 11, 2024 | P00007 | $108.5K | BARKLEY POWER PLANT TURBINE GENERATOR REHAB: OPTIONS 0545, 0547, & 0556. |
| Feb 22, 2024 | P00006 | $187.4K | BARKLEY TURBINE GENERATOR REHAB - EXERCISE OPTIONS |
| Feb 16, 2024 | A00003 | $300.1K | CASE BH003 MODIFICATION A00003 DC PUMP, DRAFT TUBE, CAPILLITARY/ADDITION |
| Sep 8, 2023 | A00002 | $43.0K | CASE BH010-1 MODIFICATION A00002 "UNIT 4 HEADCOVER SEAM WELD PART 1 NTP" |
| Jul 28, 2023 | A00001 | $95.0K | CASE BH-004 MODIFICATION A00001 "PMG REBUILD" |
| Jun 30, 2023 | P00005 | $67.0K | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Mar 9, 2023 | P00004 | $162.8K | DESIGN, MANUFACTURE, TEST AND DELIVER |
| Mar 3, 2023 | P00003 | $308.3K | MODIFICATION TO EXERCISE OPTION 0206 WICKET GATE END FACES (UNIT 4) |
| Mar 30, 2022 | P00002 | $36.8K | EXERCISE OPTION 0541, WELDING SERVICES |
| Feb 4, 2021 | P00001 | $0 | MODIFICATION IS TO ESTABLISH THE CONTRACT COMPLETION DATES WHICH ARE BASED UPON THE CONTRACTOR ACKNOWLEDGING THE NOTICE TO PROCEED ON 28 OCTOBER 2020 IN ACCORDANCE WITH FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. |
| Sep 29, 2020 | 0 | $74.8M | BARKLEY POWER PLANT TURBINE GENERATOR REHABILITATION FOR UNITS 1-4. |
Estimated positioning window
Oct 25, 2026 – Mar 15, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-09-15 (325 days from calculation)
- +35 points
- 2 historical awards in this buyer and category group
- +10 points
- 40 recorded award transactions
- +10 points
- Latest award action: 2026-05-15
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.