THIS PROJECT INVOLVES REPLACING THE EXISTING SEWER TREATMENT SYSTEM AT OLD HICKORY WITH A SEPTIC/LIFT STATION SYSTEM AND PUMP. THE CONTRACTOR MUST ALSO REPLACE THE EXISTING 4-INCH BACKFLOW PREVENTERS, ASSOCIATED VALVES, ACCESSORIES AND PIPING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW072 ENDIST NASHVILLE
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCY1ND — CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$2.9M
Current contract value$2.9M
Potential contract value / ceiling$2.9M
Start dateApr 7, 2025
Current end dateJul 24, 2026
Potential end dateJul 24, 2026
Latest award activityApr 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 28, 2026A00002$49.7KTHIS MODIFICATION WILL IMPLEMENT A REMOTE WIRELESS CONTROL SYSTEM TO FUNCTIONALLY LINK LIFT STATION 1 (LS1) AND LIFT STATION 2 (LS2) AS AN AUTOMATED SAFETY SHUTOFF.
Apr 1, 2026A00001$9.0KTHIS MODIFICATION REQUIRES THE CONTRACTOR TO PERFORM THE REMOVAL AND DECONSTRUCTION OF ITEMS RELATING TO THE OLD HICKORY SEWER SYSTEM, REMOVE RADIO TOWER, DESCOPE AIR VALVE, AND SUPPLY AND INSTALL NEW WATER METER.
Mar 17, 2026P00003$0THIS MODIFICATION EXTENDS THE DELIVERY DATE FROM 31 MARCH 2026 TO 30 APRIL 2026. THIS PROJECT INVOLVES REPLACING THE EXISTING SEWER TREATMENT SYSTEM AT OLD HICKORY WITH A SEPTIC/LIFT STATION SYSTEM AND PUMP.
May 29, 2025P00002$0MODIFICATION IS TO UPDATE DELIVERY DATE IN ALL CLINS. DATE CHANGED FROM 1 MARCH 2026 TO 21 MARCH 2026.
May 20, 2025P00001$0THIS PROJECT INVOLVES REPLACING THE EXISTING SEWER TREATMENT SYSTEM AT OLD HICKORY WITH A SEPTIC/LIFT STATION SYSTEM AND PUMP. THE CONTRACTOR MUST ALSO REPLACE THE EXISTING 4-INCH BACKFLOW PREVENTERS, ASSOCIATED VALVES, ACCESSORIES AND PIPING.
Mar 27, 20250$2.8MTHIS PROJECT INVOLVES REPLACING THE EXISTING SEWER TREATMENT SYSTEM AT OLD HICKORY WITH A SEPTIC/LIFT STATION SYSTEM AND PUMP. THE CONTRACTOR MUST ALSO REPLACE THE EXISTING 4-INCH BACKFLOW PREVENTERS, ASSOCIATED VALVES, ACCESSORIES AND PIPING.