Federal contract award
W912P823C0046
WEST SHORE LAKE PONTCHARTRAIN, WSLP-104 LEVEE AND PIPELINE CROSSING FLOODWALL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W07V ENDIST NEW ORLEANS |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $57.1M |
| Current contract value | $57.1M |
| Potential contract value / ceiling | $57.1M |
| Start date | Aug 25, 2023 |
| Current end date | Feb 14, 2028 |
| Potential end date | Feb 14, 2028 |
| Latest award activity | Apr 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 14, 2026 | A00011 | $0 | CONTRACT NO. W912P823C0046 WSLP-104 LEVEE AND T-WALL MODIFICATION NO. A00011 R00014 - WEATHER (10/1/2025 - 2/28/2026) |
| Nov 14, 2025 | A00010 | $0 | WEATHER (6/1/2025 - 9/30/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LOUISIANA ED 19-023 AT ST. JOHN THE BAPTIST PARISH |
| Nov 12, 2025 | P00003 | $992.1K | VEQ CLINS 0016 & 0050 MODIFICATION |
| Jul 3, 2025 | A00009 | $0 | WEATHER (3/1/2025 - 5/31/2025) WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LOUISIANA ED 19-023 AT ST. JOHN THE BAPTIST PARISH REFERENCE NO. R00011 |
| May 15, 2025 | P00002 | $2.1M | EMBANKMENT COMPACTED FILL GOVERNMENT |
| Mar 18, 2025 | A00008 | $0 | WEATHER (12/1/2024-2/28/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 AT ST. JOHN THE BAPTIST PARISH REFERENCE NO. R00009 |
| Jan 22, 2025 | A00007 | $29.2K | MODIFICATIOIN NO. A00007 R00007 - REVISED GEOTECH INSTRUMENT INSTALL |
| Jan 16, 2025 | A00006 | $0 | WEATHER (9/1/2024 - 11/30/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023. REFERENCE NO. R00008 T003 WEATHER (9/1/2024 - 11/30/2024) SEE PAGE 2 |
| Oct 15, 2024 | A00005 | $0 | WEATHER (6/1/2024 - 8/31/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 REFERENCE NO. R00006 T002 WEATHER (6/1/2024 - 8/31/2024) SEE PAGE 2. |
| Aug 2, 2024 | P00001 | $15.0M | WEST SHORE LAKE PONTCHARTRAIN, WSLP-104 LEVEE AND PIPELINE CROSSING FLOODWALL. MODIFICATION TO EXERCISE OPTIONS. |
| Jul 29, 2024 | A00004 | $0 | CONT. FOR W. SHORE LAKE PONTCHARTRAIN, LA, HURRICANE & STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE & T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 AT ST. JOHN THE BAPTIST PARISH. REF. NO. R00005 C004 UTILITIES AND IMPROVEMENTS SEE PG 2. |
| Jul 18, 2024 | A00003 | $37.2K | CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA HURRICANE & STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 @ ST. JOHN THE BAPTIST PARISH. REF# R00004 C001 DEF. OF C001A: ACCESS ROAD P CULVERT |
| Jun 27, 2024 | A00002 | $0 | WEATHER (9/22/2023-5/31/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE/T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 @ ST. JOHN THE BAPTIST PARISH. REF NO. R00003 T001 WEATHER (9/22/2023-5/31/2024) |
| May 3, 2024 | A00001 | $0 | ACCESS ROAD P CULVERTS CONTRACT FOR W SHORE LAKE PONTCHARTRAIN, LA, HSDRR, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LOUISIANA ED 19-023 AT ST. JOHN THE BAPTIST PARISH. REFERENCE NO. R00001 C001A ACCESS ROAD P CULVERTS |
| Aug 25, 2023 | 0 | $38.9M | WEST SHORE LAKE PONTCHARTRAIN, WSLP-104 LEVEE AND PIPELINE CROSSING FLOODWALL |
Estimated positioning window
Feb 14, 2027 – Aug 14, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-02-14 (477 days from calculation)
- +25 points
- 59 historical awards in this buyer and category group
- +15 points
- 15 recorded award transactions
- +10 points
- Latest award action: 2026-04-14
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.