Federal contract award

W912P823C0046

WEST SHORE LAKE PONTCHARTRAIN, WSLP-104 LEVEE AND PIPELINE CROSSING FLOODWALL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST NEW ORLEANS
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$57.1M
Current contract value$57.1M
Potential contract value / ceiling$57.1M
Start dateAug 25, 2023
Current end dateFeb 14, 2028
Potential end dateFeb 14, 2028
Latest award activityApr 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 14, 2026A00011$0CONTRACT NO. W912P823C0046 WSLP-104 LEVEE AND T-WALL MODIFICATION NO. A00011 R00014 - WEATHER (10/1/2025 - 2/28/2026)
Nov 14, 2025A00010$0WEATHER (6/1/2025 - 9/30/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LOUISIANA ED 19-023 AT ST. JOHN THE BAPTIST PARISH
Nov 12, 2025P00003$992.1KVEQ CLINS 0016 & 0050 MODIFICATION
Jul 3, 2025A00009$0WEATHER (3/1/2025 - 5/31/2025) WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LOUISIANA ED 19-023 AT ST. JOHN THE BAPTIST PARISH REFERENCE NO. R00011
May 15, 2025P00002$2.1MEMBANKMENT COMPACTED FILL GOVERNMENT
Mar 18, 2025A00008$0WEATHER (12/1/2024-2/28/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 AT ST. JOHN THE BAPTIST PARISH REFERENCE NO. R00009
Jan 22, 2025A00007$29.2KMODIFICATIOIN NO. A00007 R00007 - REVISED GEOTECH INSTRUMENT INSTALL
Jan 16, 2025A00006$0WEATHER (9/1/2024 - 11/30/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023. REFERENCE NO. R00008 T003 WEATHER (9/1/2024 - 11/30/2024) SEE PAGE 2
Oct 15, 2024A00005$0WEATHER (6/1/2024 - 8/31/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 REFERENCE NO. R00006 T002 WEATHER (6/1/2024 - 8/31/2024) SEE PAGE 2.
Aug 2, 2024P00001$15.0MWEST SHORE LAKE PONTCHARTRAIN, WSLP-104 LEVEE AND PIPELINE CROSSING FLOODWALL. MODIFICATION TO EXERCISE OPTIONS.
Jul 29, 2024A00004$0CONT. FOR W. SHORE LAKE PONTCHARTRAIN, LA, HURRICANE & STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE & T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 AT ST. JOHN THE BAPTIST PARISH. REF. NO. R00005 C004 UTILITIES AND IMPROVEMENTS SEE PG 2.
Jul 18, 2024A00003$37.2KCONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA HURRICANE & STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 @ ST. JOHN THE BAPTIST PARISH. REF# R00004 C001 DEF. OF C001A: ACCESS ROAD P CULVERT
Jun 27, 2024A00002$0WEATHER (9/22/2023-5/31/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-104 LEVEE/T-WALL, ST. JOHN THE BAPTIST PARISH, LA ED 19-023 @ ST. JOHN THE BAPTIST PARISH. REF NO. R00003 T001 WEATHER (9/22/2023-5/31/2024)
May 3, 2024A00001$0ACCESS ROAD P CULVERTS CONTRACT FOR W SHORE LAKE PONTCHARTRAIN, LA, HSDRR, PROJECT, WSLP-104 LEVEE AND T-WALL, ST. JOHN THE BAPTIST PARISH, LOUISIANA ED 19-023 AT ST. JOHN THE BAPTIST PARISH. REFERENCE NO. R00001 C001A ACCESS ROAD P CULVERTS
Aug 25, 20230$38.9MWEST SHORE LAKE PONTCHARTRAIN, WSLP-104 LEVEE AND PIPELINE CROSSING FLOODWALL

Estimated positioning window

Feb 14, 2027 – Aug 14, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-02-14 (477 days from calculation)
+25 points
59 historical awards in this buyer and category group
+15 points
15 recorded award transactions
+10 points
Latest award action: 2026-04-14
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.