Federal contract award

W912P823C0047

WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP - 108, T-WALL AND DRAINAGE STRUCTURE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST NEW ORLEANS
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$27.8M
Current contract value$27.8M
Potential contract value / ceiling$30.1M
Start dateAug 25, 2023
Current end dateMar 9, 2027
Potential end dateMar 9, 2027
Latest award activityApr 30, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 30, 2026A00009$350.0KQTY VAR CLIN: 0060 CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALLAND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LOUISIANA AT ST. JOHN THE BAPTIST PARISHREFERENCE NO. R00014
Sep 15, 2025A00008$0WEATHER (4/1/2025 - 7/31/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALL AND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LOUISIANA AT ST. JOHN THE BAPTIST PARISH
Jul 22, 2025P00005$0ASSIGNMENT OF CLAIMS
Jun 5, 2025A00007$0WEATHER (1/1/2025 - 3/31/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALL AND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LOUISIANA AT ST. JOHN THE BAPTIST PARISH
Feb 18, 2025A00006$0WEATHER (10/1/2024 - 12/31/2024) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALL AND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LOUISIANA REFERENCE NO. R00009
Nov 26, 2024A00005$-362.0KCONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALL AND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LOUISIANA AT ST. JOHN THE BAPTIST PARISH. REF# R00008 V001 QTY VAR CLINS: 0004,0010,0015AB...0044
Oct 28, 2024A00004$0WEATHER (7/1/2024 - 9/30/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALL AND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LA. REFERENCE NO. R00007 T003 WEATHER (7/1/2024 - 9/30/2024) SEE PAGE 2.
Aug 21, 2024A00003$0WEATHER (4/1/2024 - 6/30/2024) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALL AND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LOUISIANA. REF NO. R00005 T002 WEATHER (4/1/2024 - 6/30/2024) SEE PAGE 2.
Aug 13, 2024P00003$0EMBANKMENT, COMPACTED FILL
Aug 5, 2024P00002$5.4MEMBANKMENT, COMPACTED FILL
Apr 26, 2024A00002$0WEATHER (10/1/2023-3/31/2024) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-108 T-WALL AND DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LA REF NO. R00003 T001 WEATHER (10/1/2023-3/31/2024)
Jan 16, 2024A00001$0CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION, PROJECT, WSLP-108 T-WALL & DRAINAGE STRUCTURE, ST. JOHN THE BAPTIST PARISH, LA AT ST. JOHN THE BAPTIST PARISH. REF# R00002 C001 STOP LOGS & SLIDE GATES DESIGN CHANGE
Sep 13, 2023P00001$0EMBANKMENT, COMPACTED FILL
Aug 25, 20230$22.4MWEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP - 108, T-WALL AND DRAINAGE STRUCTURE

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-03-09 (135 days from calculation)
+35 points
59 historical awards in this buyer and category group
+15 points
14 recorded award transactions
+10 points
Latest award action: 2026-04-30
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.