Federal contract award
W912P824C0012
WSLP-103 LEVEE, FLOODWALL, AND GATE, ST. JOHN THE BAPTISTE PARISH, LOUISIANA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W07V ENDIST NEW ORLEANS |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $35.0M |
| Current contract value | $35.0M |
| Potential contract value / ceiling | $35.0M |
| Start date | May 21, 2024 |
| Current end date | May 16, 2028 |
| Potential end date | May 16, 2028 |
| Latest award activity | Jun 8, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 8, 2026 | A00007 | $0 | WEATHER (8/1/2025 - 5/31/2026) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION SYSTEM, WSLP-103 LEVEE, FLOODWALL AND GATE, STA. 770+00 B/L TO STA. 827+95 B/L, ST. JOHN THE BAPTIST PARISH, LOUISIANA |
| Jun 1, 2026 | P00004 | $30.0K | PIPE PILE AND PDA TESTING CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION SYSTEM, WSLP-103 LEVEE, FLOODWALL AND GATE, STA. 770+00 B/L TO STA. 827+95 B/L, ST. JOHN THE BAPTIST PARISH, LOUISIANA. ED 19-022REFERENCE NO. R00009 |
| Dec 30, 2025 | P00003 | $13.1M | NO FUNDS ARE REQUIRED. A. SCOPE OF WORKCHANGE: T002 TITLE: WEATHER (2/1/2025 - 7/31/2025)IN VIEW OF DELAYS IN THE COMPLETION OF WORK DUE TO CAUSES BEYOND THE CONTROL AND WITHOUT THE FAULT OR NEGLIGENCE OF THE CONTRACTOR, NAMELY ADVERSE WEATHER, DUR |
| Oct 21, 2025 | A00006 | $0 | WEATHER (2/1/2025 - 7/31/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION SYSTEM, WSLP-103 LEVEE, FLOODWALL AND GATE, STA. 770+00 B/L TO STA. 827+95 B/L, ST. JOHN THE BAPTIST PARISH, LOUISIANA. ED 19-022 |
| Aug 1, 2025 | A00005 | $51.1K | MODIFICATION NO. A00005 R00006 - DEF C002A:WICK DRAINS AND SAND EXTENSION |
| Jul 2, 2025 | A00004 | $181.4K | QTY VAR CLINS: 0007, 0008, & 0009 CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE & STORM DAMAGE RISK REDUCTION SYSTEM, WSLP-103 LEVEE, FLOODWALL AND GATE, STA. 770+00 B/L TO STA. 827+95 B/L, ST. JOHN THE BAPTIST PARISH, LA. REF. NO. R00005 |
| Jun 13, 2025 | A00003 | $128.5K | MODIFICATION NO. A00003 R00004 - ADD'L SAND AND FABRIC FOR PRELOAD AREA |
| Mar 7, 2025 | P00002 | $0 | WEATHER (8/5/2024 - 1/31/2025) CONTRACT FOR WSLP, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION SYSTEM, WSLP-103 LEVEE, FLOODWALL AND GATE, STA. 770+00 B/L TO STA. 827+95 B/L, ST. JOHN THE BAPTIST PARISH, LOUISIANA. ED 19-022 REFERENCE NO. R00002 |
| Jan 15, 2025 | A00001 | $0 | MODIFICATION NO. A00001 R00003 - WICK DRAINS AND SAND EXTENSION |
| Sep 26, 2024 | P00001 | $2.3M | EMBANKMENT, COMPACTED FILL |
| May 21, 2024 | 0 | $19.1M | WSLP-103 LEVEE, FLOODWALL, AND GATE, ST. JOHN THE BAPTISTE PARISH, LOUISIANA |
Estimated positioning window
May 16, 2027 – Nov 16, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-05-16 (569 days from calculation)
- +25 points
- 59 historical awards in this buyer and category group
- +15 points
- 11 recorded award transactions
- +10 points
- Latest award action: 2026-06-08
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.