Federal contract award

W912P824C0037

WEST SHORE LAKE PONTCHARTRAIN, LA HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-114A, ST. JOHN THE BAPTIST AND ST. CHARLES PARISH, LOUISIANA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW07V ENDIST NEW ORLEANS
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$74.3M
Current contract value$74.6M
Potential contract value / ceiling$78.5M
Start dateSep 19, 2024
Current end dateJun 14, 2028
Potential end dateJun 14, 2028
Latest award activityApr 30, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 30, 2026P00005$1.2MWEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-114A, ST. JOHN THE BAPTIST AND ST. CHARLES PARISH, LOUISIANA (ED 22-019) IS HEREBY MODIFIED TO DEF. C001A SAND BASE REVISION. REFERENCE NO. R00004.
Jan 27, 2026P00004$682.2KWEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-114A, ST. JOHN THE BAPTIST AND ST. CHARLES PARISH, LOUISIANA (ED 22-019) IS HEREBY MODIFIED TO DEF. C001A SAND BASE REVISION. REFERENCE NO. R00004.
Nov 18, 2025A00002$139.0KCLEARING & GRUBBING & CANAL EXCAVATION CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-114A, ST. JOHN THE BAPTIST AND ST. CHARLES PARISH, LOUISIANA (ED 22-019) REFERENCE NO. R00003
Sep 22, 2025A00001$0WEATHER (10/7/2024 - 8/31/2025) CONTRACT FOR WEST SHORE LAKE PONTCHARTRAIN, LA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-114A, ST. JOHN THE BAPTIST AND ST. CHARLES PARISH, LOUISIANA (ED 22-019) REFERENCE NO. R00002
Jun 18, 2025P00003$401.8KCO001 SAND BASE REVISE QUANTITIES FOR SAND FILL
Jun 13, 2025P00002$0STEEL H-PILING (HP14 X 89) - PC

Estimated positioning window

Jun 14, 2027 – Dec 14, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-06-14 (598 days from calculation)
+25 points
59 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2026-04-30
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.