Federal contract award

W912PM23C0020

PHILPOTT LANDSLIDE MITIGATION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW074 ENDIST WILMINGTON
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1KA — CONSTRUCTION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$24.6M
Current contract value$24.6M
Potential contract value / ceiling$24.6M
Start dateOct 13, 2023
Current end dateFeb 26, 2027
Potential end dateFeb 26, 2027
Latest award activityMay 14, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 14, 2026P00009$1.1MW912PM23C0020 P00009 IS NEEDED TO INCREASE THE QUANTITY OF CREW DAYS BY 10 FROM 14 TO 24 DAYS.
Mar 16, 2026P00008$2.6MW912PM23C0020 P00008 ADDITIONAL ROCK SCALING AND GEOLOGICAL FIELD WORK. THE ADDITIONAL WORK WILL INCREASE THE PERIOD OF PERFORMANCE AN ADDITIONAL 306 DAYS.
Dec 9, 2025P00007$6.6KW912PM23C0020 P00005 INCREASE LF FOR SECANT PILES THIS CHANGE IS MADE BASED UPON THE REQUEST OF THE CONTRACTOR, DAVID BOLAND, BASED UPON THE ACTUAL LF EXCEEDED FOR THE ESTIMATED LINEAR FOOTAGE (DEPTH) STATED AT AWARD FOR THE PRIMARY AND SECONDARY S
Nov 18, 2025P00006$77.6KW912PM23C0020 P00005 INCREASE LF FOR SECANT PILES THIS CHANGE IS MADE BASED UPON THE REQUEST OF THE CONTRACTOR, DAVID BOLAND, BASED UPON THE ACTUAL LF EXCEEDED FOR THE ESTIMATED LINEAR FOOTAGE (DEPTH) STATED AT AWARD FOR THE PRIMARY AND SECONDARY S
May 20, 2025P00005$576.0KSECONDARY SECANT PILE
Sep 24, 2024P00003$0WAGE DETERMINATION CHANGE
Sep 24, 2024P00004$0REVISE WD TO CAPTURE WD IN EFFECT AT TIME OF AWARD - VA20230025
May 17, 2024A00001$83.2KSECONDARY SECANT PILE
Dec 4, 2023P00002$0ADD OMITTED WEATHER CLAUSE.
Nov 9, 2023P00001$0ISSUE NOTICE TO PROCEED - SET CCD AS 26APR2026
Sep 28, 20230$19.7MPHILPOTT LANDSLIDE MITIGATION

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-02-26 (124 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
11 recorded award transactions
+10 points
Latest award action: 2026-05-14
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.