D/B FULL FACILITY RESTORATION F OR PFC CLOYSE E. HALL US ARMY RESERVE CENTER SALEM, VIRGINIA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW072 ENDIST LOUISVILLE
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2FC — REPAIR OR ALTERATION OF TROOP HOUSING FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$20.0M
Current contract value$20.0M
Potential contract value / ceiling$20.0M
Start dateSep 29, 2022
Current end dateDec 23, 2024
Potential end dateDec 23, 2024
Latest award activityMay 12, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 20 of 20 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 12, 2026A00015$8.1KFULL FACILITY RESTORATION FOR PFC CLOYSE E. HALL U.S. ARMY RESERVE CENTER IN SALEM, VIRGINIA. THIS INCLUDES BASE PROPOSAL CONSTRUCTION WORK REQUIRED WITHIN A LINE FIVE FEET OUTSIDE OF THE BUILDING EXCEPT THAT WORK COVERED BY ITEM NO. 0005.
Apr 17, 2026A00014$152.8KFULL FACILITY RESTORATION FOR PFC CLOYSE E. HALL U.S. ARMY RESERVE CENTER IN SALEM, VIRGINIA. THIS INCLUDES BASE PROPOSAL CONSTRUCTION WORK REQUIRED WITHIN A LINE FIVE FEET OUTSIDE OF THE BUILDING EXCEPT THAT WORK COVERED BY ITEM NO. 0005.
Feb 24, 2026A00013$14.5KFULL FACILITY RESTORATION FOR PFC CLOYSE E. HALL U.S. ARMY RESERVE CENTER IN SALEM, VIRGINIA. THIS INCLUDES BASE PROPOSAL CONSTRUCTION WORK REQUIRED WITHIN A LINE FIVE FEET OUTSIDE OF THE BUILDING EXCEPT THAT WORK COVERED BY ITEM NO. 0005.
Jan 14, 2026P00004$111.5KA. SCOPE OF WORK THIS MODIFICATION INCREASES THE CONTRACT PERIOD OF PERFORMANCE BY 25 CALENDAR DAYS AND INCREASES THE CONTRACT PRICE BY $111,483.75, PER A PARTIAL MERIT DETERMINATION OF THE CONTRACTORS TIME IMPACT ANALYSIS DATED 26 NOV 2024.
Nov 3, 2025A00012$40.2KR 018 REPLACE DRAIN LINE FROM MECHANICAL - EXCAVATION REMOVAL AND REPLACEMENT OF SANITARY LINE
Apr 23, 2025A00011$7.2KCR: 00017 USER REQUESTED CHANGES
Feb 19, 2025A00010$13.6KCR 00014 00015 00016
Jan 8, 2025A00009$67.3KCR 0011 ADDITIONAL DOOR FRAMES AND HARDWARE CR 0012 INSTALL NATURAL GAS LINE TO VMS CR 0013 ACOUSTICAL PANELS FOR ASSEMBLY HALL
Dec 3, 2024A00008$8.3KCR 009 REPLACE UNIT HEATERS IN VMS TC BUILDING REPAIR
Sep 11, 2024A00007$33.0KCR 8-2, CMU WALL REPLACEMENT
Jun 25, 2024A00006$26.8KCR 8-1, CMU WALL REPLACEMENT
Jun 18, 2024A00005$26.4KCR 07 CMU WALLS AND HEATERS
May 24, 2024P00003$105.0KEXERCISE CLIN 0011 - CFCI BONA FIDE NEED OMAR ITEMS
May 20, 2024A00004$54.0KCHANGE REQUEST 5-2, UNFORESEEN ACM PIPING INSULATION REMOVAL
May 2, 2024A00003$65.0KCR 003 DESIGN CHARRETTE CHANGES
Mar 25, 2024A00002$15.4KCR 004 DOOR REPLACEMENT/CHANGES PRIMARY FACILITIES TC BUILDING REPAIR
Sep 8, 2023A00001$67.4KTC BUILDING REPAIR FFR SALEM VA CR 05 UNFORESEEN ACM PIPE INSULATION REMOVAL PART 1 NTP
Nov 16, 2022P00002$0ADMIN MOD TO REMOVE FAR 52.229-12
Nov 2, 2022P00001$0FULL FACILITY RESTORATION F OR PFC CLOYSE E. HALL US ARMY RESERVE CENTER SALEM, VIRGINIA NOTICE TO PROCEED
Sep 29, 20220$19.1MD/B FULL FACILITY RESTORATION F OR PFC CLOYSE E. HALL US ARMY RESERVE CENTER SALEM, VIRGINIA