Federal contract award
W912QR23C0008
RENOVATE/REPAIR BUILDING 10262, PHASE 1
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W072 ENDIST LOUISVILLE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2AZ — REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $127.3M |
| Current contract value | $127.3M |
| Potential contract value / ceiling | $127.3M |
| Start date | May 9, 2023 |
| Current end date | Apr 16, 2027 |
| Potential end date | Apr 16, 2027 |
| Latest award activity | May 13, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 28 of 28 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 9, 2026 | A00017 | $257.0K | AFMC HEADQUARTERS PH1 |
| May 13, 2026 | P00010 | $1.6M | AFMC HEADQUARTERS PH1 |
| Apr 13, 2026 | A00016 | $448.7K | AFMC HEADQUARTERS PH1 |
| Mar 31, 2026 | P00009 | $1.3M | CR 0077,0087,0091,0094,0103,0106,0119 |
| Feb 10, 2026 | P00008 | $679.0K | CHANGE REQUEST 0031, DOOR STANDARDIZATION CAC UCR |
| Sep 9, 2025 | A00015 | $12.8K | CR 116-1 MISSING COLUMN REPLACEMENT, PART I NTP |
| Sep 8, 2025 | A00014 | $255.6K | CR 67 EXTERIOR DEMO DIFFERING SITE CR 81 WATER SERVICE LINE DEMOLITION CR 92 NW ROOF REPAIRS |
| Aug 21, 2025 | A00013 | $434.0K | CR35-FIRE DAMPERS CR40 EXT ELEV CONDITIONS CR43 N205 COM RELOC CR47 AHU ELEC REV RTU PLTFORM CR59 EXST STEEL BRAC CR60 LV2 TEMP BACKBONE CR61 PK SPACE UCR CR62 STEEL PLTS FRP CR64 PENTHSE CLERESTORY STRUCT CR72 RAF COMM CR73 CMU DEMO CR 78 COL WRAPS |
| Aug 13, 2025 | A00012 | $497.9K | CR 014 STC RATINGS CR 015 10264 OH DOOR UCR CR 037 REROUTE EXISTING AHU OA DUCTWORK CR 052 EAST EXISTING OA INTAKE CR 058 EXTERIOR DEMO EXISTING CONDITIONS |
| Aug 4, 2025 | A00011 | $36.0K | CR 0076 CARPET UCR |
| Aug 4, 2025 | P00007 | $62.2K | CR 054-1 AAFES & CHAPLAIN UCR, PART I NTP REVISE CASEWORK AND ADD WALLS PER USER REQUEST RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
| Jul 30, 2025 | A00010 | $426.0K | CR011 EXISTING TUNNEL LOCATIONS CR025 CONCEALED PIPES LOADING DOCK CR042 RELOC TRANSFORMER PAD WTRPRFING CR 051, STR 6 CRACK/VOIDS CR056 UNDGRD CONCRETE STRUCTURE CR063 LVL 1 FLOOR INFILLS CR082 L2 EAST BUMPOUT RPRS CR088 EXPANS JOINT FLR TRANSITION |
| Mar 31, 2025 | P00006 | $150.0K | EXERCISING OPTION 1 IN THE AMOUNT OF $150,000.00 LEAVING SIX (6) ITERATIONS REMAINING. |
| Dec 27, 2024 | P00005 | $659.0K | EXERCISING OPTION 5 IN THE AMOUNT OF $659,000. |
| Dec 4, 2024 | A00009 | $132.9K | CR 026 STAIRWELL SPRINKLER MODIFICATIONS CR 0033 CONSTRUCTION BARRIER ASSEMBLIES CR 0045 CURTAINWALL ASSEMBLY MCP CR 0050 COMM DEMO S106 & S212 BUILDING 10262, PHASE 1 |
| Nov 20, 2024 | A00008 | $365.7K | CR 19 DELETE LIGHT TUNING CR 24 LOADING DOCK SPRINKLER COVERAGE CR 29 STEEL PLATES FOR FRP CR 32 MECH PIPING & DUCT RECONFIGURATIONS CR 36 SARRIS/CORONA POWER REFEED CR 38 ELEV 3 & STAIR 10 EXISTING STEEL CR 41 BASEMENT MEP EXISTING CONDITIONS |
| Oct 15, 2024 | A00007 | $-480.0K | CR 010 PROTECTIVE ENCLOSURES RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
| Sep 30, 2024 | P00004 | $1.1M | CR 018 STEAM TUNNEL ROAD SECTIONS RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
| Sep 11, 2024 | A00006 | $-52.1K | CR 004 ARC RESISTANT SWITCHGEAR CR 0023 PAINTING PIPE ABOVE SUSPENDED CEILNGS RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
| Jul 31, 2024 | A00005 | $77.0K | CR 006 REMOVE TECTUM FOR WALL PARTITIONS CR 0030 EXTERIOR MISCELLANEOUS DEMOLITION RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
| Jul 8, 2024 | A00004 | $8.6K | CR 008 CRAC UNIT CR 0028 PLUMBING RECONFIGURATIONS NAD MECH DEMO CR 0020 CORNER AND END GUARDS |
| Jun 18, 2024 | A00003 | $482.9K | CR 07 LEVEL 1 MISC DEMO CR 016 LEVEL 2 MISC DEMO CR 017 ELECTRICAL RECONFIGURATIONS CR 021 BUCKEYE CONF ROOM DUCTWORK CR 022 COMM RECONFIGURATIONS RENOVATE REPAIR BUILDING 10262, PHASE 1 |
| Jun 11, 2024 | A00002 | $-358.5K | CR 009 CONSTRUCTION SITE CHANGES RENOVATE REPAIR BUILDING 10262, PHASE 1 |
| Sep 30, 2023 | P00003 | $1.4M | OPTION MOD - RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
| Sep 12, 2023 | A00001 | $0 | CR 002 MOVEMENT SUPPORT DELAYS RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
| Aug 31, 2023 | P00002 | $605.4K | OPTIONS 1,2,3 & 4 EXERCISED ONE (1) TIME. (CLINS 6,7,8 & 9) |
| Jun 22, 2023 | P00001 | $0 | RENOVATE/REPAIR BUILDING 10262, PHASE 1 ISSUANCE OF ADMINISTRATIVE NOTICE TO PROCEED |
| May 25, 2023 | 0 | $116.6M | RENOVATE/REPAIR BUILDING 10262, PHASE 1 |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-04-16 (166 days from calculation)
- +35 points
- 3 historical awards in this buyer and category group
- +10 points
- 28 recorded award transactions
- +10 points
- Latest award action: 2026-05-13
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.