Federal contract award

W912QR24C0002

CONSTRUCTION AND RENOVATION OF AHU-5 AT WPAFB, OH

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW072 ENDIST LOUISVILLE
NAICS238220 — Plumbing, Heating, and Air-Conditioning Contractors
PSCJ041 — Maintenance, Repair and Rebuilding of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$9.9M
Current contract value$9.9M
Potential contract value / ceiling$9.9M
Start dateFeb 12, 2024
Current end dateDec 1, 2025
Potential end dateJan 30, 2026
Latest award activityMar 18, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 18, 2026A00008$274.1KCR0025, CR0026, CR0028, CR0030
Feb 24, 2026A00007$373.8KCR0021, CR0023, CR0027
Sep 29, 2025A00006$7.7KCR 013 SIGNAGE - CHANGE SIGNAGE TYPE
Jul 29, 2025A00005$32.1KCR 015 SOUND DOORS FRAMING - PROVIDE KING STUDS FOR ALL STC DOORS CR 016 WALL BOXES AT SOUND WALLS - SURFACE MOUNT ALL COMM BOXES, ELECTRICAL AND LIGHTING COMPONETS CR 0024 FLOORING IN W219 AND W225B EXISTING VCT FLOOR TO REMAIN
Jul 2, 2025A00004$33.5KCR 006 RF FILTERPP-39A-REMOVE RF FILTER CR 009 REMOVE PANEL PU856-1 DEMO EXISTING PANEL CR 017 W220F EAST WALL FINISH TO TRUE CEILING WITH GYPSUM CR 018 EXISTING COMMUNICATON CONDUITS CONST STUD AND GYPSUM BOARD CHASE CR 019 COMM AND FIRE EXTING.DEMO
Jun 25, 2025A00003$110.0KCR 007 CHANGE FIBER FROM 62.5 MICRON TO 50 MICRON
Feb 12, 2025A00002$7.5KCR 002 SOUND RATED WALL W209A
Feb 4, 2025A00001$17.7KCR 003 EXISTING DUCT W220 CR 004 EXISTING PANEL PP-B CR 0008 FIRESTOPPING JOINTS
Dec 30, 2024P00006$5.2KASBESTOS ABATEMENT, PART II FINAL
Nov 15, 2024P00005$1.1MBASE - BUILDING RENOVATIONS
Nov 14, 2024P00004$0BASE - BUILDING RENOVATIONS

Research next steps

  1. Verify whether remaining options may extend performance beyond the current end date.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.