Federal contract award

W912QR24C0006

DESIGN BUILD CONSTRUCTION OF A CHILD DEVELOPMENT CENTER AT SCOTT AIR FORCE BASE, IL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW072 ENDIST LOUISVILLE
NAICS236220 — Commercial and Institutional Building Construction
PSCY1CA — CONSTRUCTION OF SCHOOLS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$21.0M
Current contract value$21.0M
Potential contract value / ceiling$22.2M
Start dateApr 11, 2024
Current end dateMar 24, 2027
Potential end dateMar 24, 2027
Latest award activityJun 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026A00011$248.2KCHANGE REQUEST CR28 - REAL PROPERTY ITEMS CR30 - CCTV AND INTERCOM ADDITIONSINCREASED: $248,235.04TIME EXTENSION: 0 DAYS CONTRACT REQUIRED COMPLETION DATE 24 MARCH 2027
May 14, 2026A00010$228.0KCHANGE REQUEST CR18-2 TELECOMM OUTSIDE PLANT - INSTALL INCREASED: $228,037.43TIME EXTENSION: 0 DAYS CONTRACT REQUIRED COMPLETION DATE 24 MARCH 2027
May 1, 2026A00009$199.2KCHANGE REQUEST CHANGE ELEC. UTIL. - PART 2 INSTALL INCREASED: $199,187.75TIME EXTENSION: 0 DAYS CONTRACT REQUIRED COMPLETION DATE 24 MARCH 2027
Jan 27, 2026A00008$81.7KCHANGE REQUEST CR24 TITLE: DOAS SYSTEM CHANGE (RFI-47) INCREASED: $81,666.12TIME EXTENSION: 0 DAYS CONTRACT REQUIRED COMPLETION DATE 24 MARCH 2027
Jan 6, 2026A00007$20.9KCHANGE REQUEST CR26 DESIGN DELAY REA INCREASED $20,857.09TIME EXTENSION: 92 DAYS CONTRACT REQUIRED COMPLETION DATE 24 MARCH 2027
Sep 29, 2025A00006$280.4KCR12 UPDTD DOORS CR13 KITCHN DRAIN PPNG PVC SWAP CR14 ENTRY VESTBLE GLASS WALLS CR15 EVAC PAD RELOCAT CR16 PLAYGRND DESIGN PCKGE CR17 UPDTD CASEWORK DETAILS CR19 UPDTD WINDOW DETAILS CR21 CONTAMD SOIL BURIAL CR22 HVAC SPLIT SYST CR23 SEPTIC TANK RMVL
Sep 22, 2025A00005$243.9KCR9-2 CHANGE ELECT UTIL. - EQUIPMENT
Jun 23, 2025A00004$75.0KCR18 1 TELECOMM OUTSIDE PLANT PART 1
Jun 13, 2025A00003$-280.0KCHANGE REQUEST CR07 AMERICAN WATER DLA PAYMENT
Jun 13, 2025P00002$0EXECUTIVE ORDER MODIFICATION
Apr 23, 2025A00002$32.1KCR 002 DELETE STORM SHELTER CR 003 DELETE ACS CR 004 DELETE CATV CR 005 CHANGE SAN SEWER CR 008 REDUCE COMMUNICATIONS OUTSIDE PLANT CR 010 DAYLIGHT HARVESTING CONSTRUCTION OF SAFB CDC
Dec 6, 2024A00001$50.0KCR 009-1 PART 1 - CHANGE ELECTRIC UTILITY (NTP) BASE - CONSTRUCTION OF SAFB CDC
May 2, 2024P00001$0ISSUANCE OF NOTICE TO PROCEED (NTP) - CONSTRUCTION OF SAFB CDC
Apr 11, 20240$19.7MDESIGN BUILD CONSTRUCTION OF A CHILD DEVELOPMENT CENTER AT SCOTT AIR FORCE BASE, IL

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-03-24 (143 days from calculation)
+35 points
3 historical awards in this buyer and category group
+10 points
14 recorded award transactions
+10 points
Latest award action: 2026-06-11
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.