Federal contract award
W912QR24C0017
CONSTRUCTION OF AN ARMY RESERVE CENTER (ARC), AREA MAINTENANCE SUPPORT ACTIVITY (AMSA), AND VEHICLE MAINTENANCE SHOP (VMS) AT WRIGHT-PATTERSON AIR FORCE BASE (WPAFB), OH.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W072 ENDIST LOUISVILLE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $44.9M |
| Current contract value | $44.9M |
| Potential contract value / ceiling | $45.1M |
| Start date | Jun 20, 2024 |
| Current end date | Aug 7, 2027 |
| Potential end date | Aug 7, 2027 |
| Latest award activity | May 14, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 14, 2026 | A00007 | $3.6K | CR 22, RMS 106 AND 103 GYPSUM HT. |
| Mar 17, 2026 | A00006 | $63.2K | CRS 14 AND 15, SOFFIT DETAIL AND EXHAUST REELS |
| Jan 28, 2026 | A00005 | $23.8K | CRS 18 AND 19, SAG RODS AND TRANSFORMER |
| Nov 12, 2025 | A00004 | $30.4K | CR 03 LEED LIGHTING-CRI CHNGD FROM 80 TO 90 CR 05 AMSA STRUCT STEEL-INSTALL CURVED GRIT CR 011 AMSA FUME EXHAUST REELS-INSTALL HORIZNTL #5 REBAR CR 012 ARC MAIN ENTRANCE PRECAST-INCR FASCIA AROUND ENTRNCE CR 016 AMSA AUXILIARY DRAIN-INSTALL AUX DRAIN |
| Sep 18, 2025 | A00003 | $242.6K | CR 007 ARC EXCESS TOPSOIL- REMOVE EXCESS TOPSOIL |
| Aug 26, 2025 | A00002 | $14.8K | CR06 ARC FOLDING PARTITIONS CONNECTION DETAIL-INSTL SOUND BAFFLE ,INSULATON CR08 AMSA MECHANICAL CHANGES-ADJST FLOW AND ALARMS CR09 ARC MECHANICAL CHANGES-UPDATE MIN. COOLING SEQ. OF OPERATION CR 0010 ARC DOOR HARDWARE SET-RPLCE NON ELECT WITH ELECT |
| Jul 16, 2025 | A00001 | $92.6K | CR 004 CLIN006 AES PRICE INCREASE -PRICE INCREASE TO ELECTRIC CONNECTION WPAFB ARC - PRIMARY FACILITY |
| Jun 9, 2025 | P00003 | $0 | WPAFB ARC - PRIMARY FACILITY - EO MODIFICATION |
| Jul 24, 2024 | P00002 | $0 | WPAFB ARC - ISSUANCE OF ADMINISTRATIVE NOTICE TO PROCEED (NTP). |
| Jul 15, 2024 | P00001 | $299.0K | WRIGHT PATTERSON AFB ARC-AMSA-VMS EXERCISE CLIN 0009- OPTION 1 IN THE AMOUNT OF $53,000.00 EXERCISE CLIN 0016- OPTION 7 IN THE AMOUNT OF $246,000.00 |
| Jun 20, 2024 | 0 | $44.0M | CONSTRUCTION OF AN ARMY RESERVE CENTER (ARC), AREA MAINTENANCE SUPPORT ACTIVITY (AMSA), AND VEHICLE MAINTENANCE SHOP (VMS) AT WRIGHT-PATTERSON AIR FORCE BASE (WPAFB), OH. |
Estimated positioning window
Nov 1, 2026 – Feb 7, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-08-07 (279 days from calculation)
- +35 points
- 129 historical awards in this buyer and category group
- +15 points
- 11 recorded award transactions
- +10 points
- Latest award action: 2026-05-14
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.