Federal contract award
W912QR24C0026
DESIGN-BUILD MAINTENANCE AND REPAIR OF AN ARMY RESERVE CENTER TRAINING BUILDING, BUILDING 505, AT FORT SNELLING, MINNESOTA. THIS REQUIREMENT INCLUDES A-E DESIGN AND CONSTRUCTION SERVICES.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W072 ENDIST LOUISVILLE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $31.8M |
| Current contract value | $31.8M |
| Potential contract value / ceiling | $31.8M |
| Start date | Aug 28, 2024 |
| Current end date | Dec 26, 2026 |
| Potential end date | Dec 26, 2026 |
| Latest award activity | Jun 5, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 5, 2026 | P00004 | $218.1K | MODIFICATION TO EXERCISE OPTION B FOR DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. |
| Apr 30, 2026 | A00008 | $39.4K | DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. |
| Apr 22, 2026 | P00003 | $449.5K | DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. |
| Apr 1, 2026 | A00007 | $101.3K | DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. |
| Feb 9, 2026 | A00006 | $35.9K | DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. |
| Jan 29, 2026 | A00005 | $37.7K | DESIGN-BUILD MAINTENANCE AND REPAIR ARMY RESERVES (MRAR) FORT SNELLING B505 AT FORT SNELLING IN SAINT PAUL, MN. |
| Nov 12, 2025 | A00004 | $5.7K | SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGESTHE FOLLOWING HAVE BEEN ADDED BY FULL TEXT: DESCRIPTION OF CHANGE R00005 CHANGE 12 - INVESTIGATE EXISTING PIPE |
| Oct 24, 2025 | A00003 | $5.9K | CR 0014 ABATE BOILER STACK |
| Oct 17, 2025 | A00002 | $118.4K | R 13 CORE FILLS AT WINDOW JAMBS-IDENTIFY TO GOV CURRENT CONDITIONS OF ALL EXISTING WINDOW JAMBS AND APPROPRIATE REPAIR METHODS |
| Aug 28, 2025 | A00001 | $42.1K | CR 003 MEP GUARDRAILS AT INFILTRATION BASINS-CONSTRUCT BARRIER SYSTEM CR 005 OVERHEAD DOOR STAGING RM 139 - CHANGE DIMENSIONS OF OVH DOOR CR 008 MECHANICAL EQUIP DOOR CHANGE - CHANGE EGRESS TO SINGLE DOOR CR 009 ADDITONAL URINALS RMS 122A&238A |
| May 20, 2025 | P00002 | $0 | ADMINISTRATIVE MODIFICATION TO COMPLY WITH EXECUTIVE ORDER 14173 & EXECUTIVE ORDER 14148. REMOVING FAR CLAUSES 52.222-21, 52.222-26, AND 52.222-27. REVISED FAR CLAUSES 52.222-9, 52.244-6, AND 52.223-23. |
| Sep 27, 2024 | P00001 | $0 | ISSUE NOTICE-TO-PROCEED TO PROVIDE DESIGN AND CONSTRUCTION SERVICES FOR THE MAINTENANCE AND REPAIR OF A FAILING ARMY RESERVE CENTER TRAINING BUILDING, B505, AT FORT SNELLING, MN. |
| Aug 28, 2024 | 0 | $30.2M | DESIGN-BUILD MAINTENANCE AND REPAIR OF AN ARMY RESERVE CENTER TRAINING BUILDING, BUILDING 505, AT FORT SNELLING, MINNESOTA. THIS REQUIREMENT INCLUDES A-E DESIGN AND CONSTRUCTION SERVICES. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-12-26 (62 days from calculation)
- +35 points
- 19 historical awards in this buyer and category group
- +15 points
- 13 recorded award transactions
- +10 points
- Latest award action: 2026-06-05
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.