DESIGN-BUILD FULL FACILITY RESTORATION OF PRIMARY FACILITY BUILDING 100 ARMY RESERVE CENTER IN DES MOINES, IA.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW072 ENDIST LOUISVILLE
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$32.2M
Current contract value$32.9M
Potential contract value / ceiling$32.9M
Start dateSep 19, 2024
Current end dateJun 29, 2027
Potential end dateJun 29, 2027
Latest award activityMay 29, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 29, 2026A00006$-34.2KSECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGESTHE FOLLOWING HAVE BEEN ADDED BY FULL TEXT:DESCRIPTION OF CHANGE R10003 (CR003-2) FINAL PART II REDUCE OFFICE COUNT FLOOR PLANE1. SCOPE:IT HAS BEEN DETERMINED NECESSARY AND IN THE
Apr 17, 2026A00005$95.0KSECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGESTHE FOLLOWING HAVE BEEN ADDED BY FULL TEXT:DESCRIPTION OF CHANGE R10003 (CR003-2) FINAL PART II REDUCE OFFICE COUNT FLOOR PLANE1. SCOPE:IT HAS BEEN DETERMINED NECESSARY AND IN THE
Mar 18, 2026P00003$632.9KSECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGESTHE FOLLOWING HAVE BEEN ADDED BY FULL TEXT:DESCRIPTION OF CHANGE R10003 (CR003-2) FINAL PART II REDUCE OFFICE COUNT FLOOR PLANE1. SCOPE:IT HAS BEEN DETERMINED NECESSARY AND IN THE
Feb 9, 2026A00004$94.9KSECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGESTHE FOLLOWING HAVE BEEN ADDED BY FULL TEXT:DESCRIPTION OF CHANGE R10003 (CR003-2) FINAL PART II REDUCE OFFICE COUNT FLOOR PLANE1. SCOPE:IT HAS BEEN DETERMINED NECESSARY AND IN THE
Jul 7, 2025A00003$75.8KCR 003-2 FINAL PART II REDUCE OFFICE COUNT FLOOR PLANE - CHANGE IN FLOOR LAYOUT PRIMARY FAC. BLDG. 100 ARC REPAIR
May 29, 2025P00002$0ADMINISTRATIVE MODIFICATION TO COMPLY WITH EXECUTIVE ORDER 14173. REMOVING FAR CLAUSES 52.222-21, 52.222-26, AND 52.222-27. REVISED FAR CLAUSES 52.222-9, AND 52.244-6.
Mar 7, 2025A00002$10.0KA00002, R00003 CR 03-1 NTP NTE REDUCE OFFICE COUNT FLOOR PLAN
Feb 24, 2025A00001$0REFERENCE NO. R00002 CR 02 TIME EXTENSION FOR CHARRETTE MEETING
Oct 28, 2024P00001$0THIS MODIFICATION SERVES TO ISSUE NOTICE TO PROCEED (NTP) TO THE CONTRACTOR FOR THE PRIMARY FAC. BLDG. 100 ARC REPAIR IN DES MOINES, IA.
Sep 19, 20240$31.1MDESIGN-BUILD FULL FACILITY RESTORATION OF PRIMARY FACILITY BUILDING 100 ARMY RESERVE CENTER IN DES MOINES, IA.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-06-29 (247 days from calculation)
+35 points
19 historical awards in this buyer and category group
+15 points
10 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.