Federal contract award
W912UM22C0001
FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SN ENDIST FAR EAST |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $16.4M |
| Current contract value | $16.4M |
| Potential contract value / ceiling | $16.4M |
| Start date | Oct 28, 2021 |
| Current end date | Oct 2, 2026 |
| Potential end date | Oct 2, 2026 |
| Latest award activity | Oct 16, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 24 of 24 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Oct 16, 2025 | P00008 | $-1.0M | SR022_VE FOR WALL TYPE CHANGE_FY21 ROKFC CASH A18R701 INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Sep 30, 2025 | A00017 | $14.3K | SR021_ADJUST OIL SUMP PIT AND OIL LINE_FY21 ROKFC CASH A18R701 INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Sep 5, 2025 | A00016 | $-167.6K | SR019_CHANGES FROM DIFFERING SITE CONDITION_FY21 ROKFC CASH A18R701 INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Sep 4, 2025 | P00007 | $-2.6M | FY21 ROKFC CASH A18R701, INSTALL COMMERCIAL POWER, CARROLL, KOREA TO CHANGE CURRENCY CONVERSION RATE TO 1250. |
| Aug 12, 2025 | P00006 | $0 | CLASS DEVIATION 2025-O0003 / Y21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jun 30, 2025 | P00005 | $0 | CLASS DEVIATION 2025-O0004-REVOCATION OF EXECUTIVE ORDER ON SUSTAINABILITY |
| Jun 25, 2025 | A00015 | $20.7K | SR018_URC FOR LAYDOWN AREA RELOCATION_FY21 ROKFC CASH A18R701 INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| May 2, 2025 | P00004 | $299.5K | CI#SR017 PART 2 MODIFICATION (LOCAL) FOR CI#SR015 (KEPCO) |
| Feb 24, 2025 | P00003 | $800.2K | PROVIDE THE ENGINEERING CHANGES TO ACCOMMODATE KEPCO POWER LINES AS PER THE DESIGNER'S RFI CLARIFICATION. |
| Jan 24, 2025 | A00014 | $32.2K | SR016_PROVIDE RADAR PAD_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jul 3, 2024 | A00013 | $73.6K | SR014_PROVIDE PROTECTION AND FENCE ON SLOPE_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Apr 29, 2024 | P00002 | $2.9M | CI#SR013 DELETE DRUPS AND PROVIDE MG SET |
| Mar 21, 2024 | A00012 | $19.0K | SR011_PROVIDE TESTS FOR EXISTING MV CABLE_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Mar 7, 2024 | A00011 | $4.4K | SR012_MODIFY TO SPECIAL JUNCTION BOX_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jan 9, 2024 | A00006 | $0 | SR010_TO MATCH THE MOD NUMBER BETWEEN RMS(A00006) & PD2(A00010)_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jan 6, 2024 | A00007 | $112.8K | SR009_ENGINEERING CHANGES FROM RFI1_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Dec 19, 2023 | A00010 | $101.8K | SR008_REROUTE EXISTING WATER LINE_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jul 20, 2023 | A00005 | $210.8K | SR004_PROVIDE 3 MEALS PER DAY_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jul 12, 2023 | A00004 | $128.6K | SR007_GEO INVESTIGATION AND DESIGN_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jul 10, 2023 | A00003 | $210.9K | SR006_PROVIDE 3 PMJS FOR CABLE PULLING_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jun 30, 2023 | A00002 | $378.9K | SR005_PROVIDE BATTERY PANELS_FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
| Jun 8, 2023 | A00001 | $23.5K | SR003_PROVIDE DWGS AND SPECS FOR OPDM SYSTEM_FY21 ROKFC CASH, INSTALL COMM POWER, CARROLL* |
| Apr 3, 2023 | P00001 | $359.1K | SR001_RE-REOUTE ELEC AND COMM LINE_FY21 ROKFC CASH, INSTALL COMM POWER, CARROLL* |
| Oct 28, 2021 | 0 | $14.5M | FY21 ROKFC CASH, INSTALL COMMERCIAL POWER, CARROLL*, KOREA |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.