Federal contract award
W912UM23C0006
FY22 DLA OMA PROJECT NO. SMYU212002, ADD/REPAIR PETROLEUM OPERATIONS, B-1223, OSAN AB, KOREA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SN ENDIST FAR EAST |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2AZ — REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $4.2M |
| Current contract value | $4.2M |
| Potential contract value / ceiling | $4.2M |
| Start date | Jul 17, 2023 |
| Current end date | Mar 13, 2026 |
| Potential end date | Mar 13, 2026 |
| Latest award activity | Feb 19, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 19 of 19 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Feb 19, 2026 | A00015 | $40.6K | C.I.#024 - MISCELLANIOUS ELECTRICAL WORK C.I.#025 - REPLACE SSMR SUB-PURLINS |
| Feb 5, 2026 | A00014 | $3.9K | C.I.#023 - PROVIDE FIRE DAMPER AT O.A DUCT |
| Sep 24, 2025 | A00013 | $23.8K | C.I# CR020, REMOVE EXISTING FUEL OIL STORAGE TANK C.I# CR021, ADD/RELOCATE A CHAIN LINK FENCE ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Sep 5, 2025 | A00012 | $4.6K | C.I #CR019, REPLACE CIRCUIT BREAKERS FOR PHASE 2 HVA ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Aug 13, 2025 | A00011 | $17.0K | C.I#CR015, PROVIDE SPARE COMM RACK C.I#CR016, PROVIDE AN EMERGENCY-SHUT OFF SWITCH ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Aug 12, 2025 | P00003 | $0 | CLASS DEVIATION 2025-O0003/ FY22 DLA OMA PROJECT NO. SMYU212002, ADD/REPAIR PETROLEUM OPERATIONS, B-1223, OSAN AB, KOREA |
| Jul 30, 2025 | A00010 | $-2.0K | CI # CR022, CHANGE FUNDING SOURCE OF CLIN 0007 FROM NEW WORK TO REPAIR/MAINTENANCE |
| Jul 8, 2025 | P00002 | $555.1K | C.I #CR009, INSTALL TEMPORARY CONTAINER OFFICES ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| May 13, 2025 | A00009 | $29.7K | C.I #CR011,CR012,CR013, REPLACE CIRCUIT BREAKERS FOR HVAC EQUIPMENT ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Apr 16, 2025 | A00008 | $-2.3K | C.I #CR014, ADJUST PILE QUANTITIES ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Feb 12, 2025 | A00007 | $12.5K | C.I# CR010, FUEL LAB DESIGN MODIFICATION ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Jan 21, 2025 | A00006 | $19.6K | C.I #CRO08, PROVIDE 50-PAIR COPPER CABLE / ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Sep 9, 2024 | A00005 | $2.0K | C.I #CRO07, REPLACE ELECTRICAL MANHOLE WITH HANDHOLE |
| Jul 29, 2024 | A00004 | $16.3K | C.I #CRO06, PROVIDE GLASS MAT GWB ON METAL DECK ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Jul 14, 2024 | A00003 | $22.7K | C.I #CRO04, REROUTE EXISTING SEWER LINES |
| Jun 18, 2024 | A00002 | $356.0K | C.I #CRO03, ADDITIONAL TIME TO COMPLETE PROJECT C.I #CRO05, REROUTE SECONDARY POWER LINE ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Mar 21, 2024 | A00001 | $132.4K | C.I #CRO02, REMOVE 250MM THK CONCRETE SLAB |
| Jul 24, 2023 | P00001 | $0 | ADD/REPAIR PETROLEUM OPERATIONS, B-1223 |
| Jul 17, 2023 | 0 | $3.0M | FY22 DLA OMA PROJECT NO. SMYU212002, ADD/REPAIR PETROLEUM OPERATIONS, B-1223, OSAN AB, KOREA |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.