Federal contract award

W912WJ22C0002

CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD,MA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST NEW ENGLAND
NAICS236220 — Commercial and Institutional Building Construction
PSCY1DB — CONSTRUCTION OF LABORATORIES AND CLINICS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$289.7M
Current contract value$289.7M
Potential contract value / ceiling$291.4M
Start dateJan 27, 2022
Current end dateAug 21, 2027
Potential end dateAug 21, 2027
Latest award activityMay 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 55 of 55 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 10, 2026P00028$543.1KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
May 27, 2026A00026$15.1KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
May 8, 2026A00025$136.1KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Apr 1, 2026A00024$230.1KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Mar 9, 2026A00023$331.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Feb 3, 2026A00022$46.3KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jan 21, 2026P00027$617.6KJC017 LAYDOWN AREA UNSUITABLE SOILS
Dec 19, 2025A00021$168.7KJC066 TELECOMMUNICATIONS CABLE TRAY CHANGE JC085 EXISTING STEAM LINE LEAK
Nov 14, 2025A00020$27.4KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Sep 30, 2025A00019$346.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Sep 22, 2025P00026$1.3MCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MA
Sep 5, 2025P00025$702.5KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MA
Aug 8, 2025A00018$275.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 25, 2025A00017$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 24, 2025A00016$328.7KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 14, 2025A00015$23.3KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jun 25, 2025A00014$35.9KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
May 22, 2025A00013$109.4KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
May 21, 2025P00024$120.4KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MA
Apr 15, 2025A00012$126.8KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Apr 1, 2025P00023$372.3KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Feb 28, 2025P00022$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Feb 24, 2025A00011$69.6KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Dec 19, 2024P00021$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Dec 3, 2024A00010$463CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Nov 22, 2024A00009$-273CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Oct 15, 2024A00008$14.4KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Sep 24, 2024P00020$100.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Sep 23, 2024P00019$-168.9KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Sep 10, 2024A00007$305.3KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Aug 26, 2024P00018$63.8MCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Aug 15, 2024P00017$382.1KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 17, 2024A00006$30.9KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 17, 2024P00016$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 15, 2024P00015$257.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jun 20, 2024P00014$260.3KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jun 11, 2024A00005$329.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jun 10, 2024P00013$500.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
May 2, 2024A00004$94.1KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Apr 17, 2024A00003$154.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Apr 12, 2024P00012$1.0MCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Mar 8, 2024P00011$492.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jan 4, 2024P00010$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jan 3, 2024A00002$13.7KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Oct 26, 2023A00001$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Sep 22, 2023P00009$200.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Aug 7, 2023P00008$150.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Aug 1, 2023P00007$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 26, 2023P00006$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Jul 21, 2023P00005$20.0MCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Mar 15, 2023P00004$264.0KCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Sep 26, 2022P00003$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD, MASSACHUSETTS
Feb 28, 2022P00002$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD,MA
Feb 1, 2022P00001$0CONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD,MA
Jan 27, 20220$193.0MCONSTRUCTION OF ADVANCED COMPOUND SEMICONDUCTOR LABORATORY/MICROSYSTEM INTEGRATION FACILITY (CSL-MIF) HANSCOM AIR FORCE BASE, BEDFORD,MA

Estimated positioning window

Oct 25, 2026 – Feb 21, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-08-21 (300 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
55 recorded award transactions
+10 points
Latest award action: 2026-05-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.