Federal contract award

W91QV126CA028

THE LRC, FORT A. P. HILL, VA HAS A REQUIREMENT FOR THE REPAIR THE WATER PUMP, RADIATOR, OTHER REPAIRS AND INSPECT THE FD ENGINE 8 E-ONE 1250 GPM PUMP PACKING, TANK TO PUMP VALVE, TANK VALVE, DISCHARGE VALVE AND CONDUCT PUMP TEST.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QM MICC-FT BELVOIR
NAICS811111 — General Automotive Repair
PSCJ023 — Maintenance, Repair and Rebuilding of Equipment: Ground Effect Vehicles, Motor Vehicles, Trailers, and Cycles
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$16.3K
Current contract value$16.3K
Potential contract value / ceiling$16.3K
Start dateApr 16, 2026
Current end dateJul 17, 2026
Potential end dateJul 17, 2026
Latest award activityMay 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 14, 2026P00002$0THE LRC, FORT A. P. HILL, VA HAS A REQUIREMENT FOR THE REPAIR THE WATER PUMP, RADIATOR, OTHER REPAIRS AND INSPECT THE FD ENGINE 8 E-ONE 1250 GPM PUMP PACKING, TANK TO PUMP VALVE, TANK VALVE, DISCHARGE VALVE AND CONDUCT PUMP TEST.
May 5, 2026P00001$6.3KTHE LRC, FORT A. P. HILL, VA HAS A REQUIREMENT FOR THE REPAIR THE WATER PUMP, RADIATOR, OTHER REPAIRS AND INSPECT THE FD ENGINE 8 E-ONE 1250 GPM PUMP PACKING, TANK TO PUMP VALVE, TANK VALVE, DISCHARGE VALVE AND CONDUCT PUMP TEST.
Apr 15, 20260$10.0KTHE LRC, FORT A. P. HILL, VA HAS A REQUIREMENT FOR THE REPAIR THE WATER PUMP, RADIATOR, OTHER REPAIRS AND INSPECT THE FD ENGINE 8 E-ONE 1250 GPM PUMP PACKING, TANK TO PUMP VALVE, TANK VALVE, DISCHARGE VALVE AND CONDUCT PUMP TEST.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.