IDV vehicle

6973GH24D00065

PRODUCTION OF UP TO TWELVE (12) BUS CONDITIONING UNIT (BCU-4000) WITH ROCKWELL COLLINS (FPFM)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6973GH FRANCHISE ACQUISITION SVCS
NAICS334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC1510 — Aircraft, Fixed Wing
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$0
Current contract valueNot reported
Potential contract value / ceiling$5.0M
Start dateJul 11, 2024
Current end dateNot available
Potential end dateNot available
Latest award activityJul 24, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 24, 2026P00005$0PRODUCTION OF UP TO TWENTY (20) BUS CONDITIONING UNIT (BCU-4000) W/ROCKWELL COLLINS (FPFM) 1 PROD UNIT P/AIRCRAFT & TWO (2) SPARES. ESTIMATED COST - $2,987,867.00
Dec 19, 2025P00004$0PRODUCTION OF UP TO TWENTY (20) BUS CONDITIONING UNIT (BCU-4000) W/ROCKWELL COLLINS (FPFM) 1 PROD UNIT P/AIRCRAFT & TWO (2) SPARES. ESTIMATED COST - $2,987,867.00
Jun 27, 2025P00003$0PRODUCTION OF UP TO TWENTY (20) BUS CONDITIONING UNIT (BCU-4000) W/ROCKWELL COLLINS (FPFM) 1 PROD UNIT P/AIRCRAFT & TWO (2) SPARES. ESTIMATED COST - $2,987,867.00
Jun 26, 2025P00002$0PRODUCTION OF UP TO TWELVE (12) BUS CONDITIONING UNIT (BCU-4000) WITH ROCKWELL COLLINS (FPFM) ESTIMATED COST - $2,987,867.00
Aug 16, 2024P00001$0PRODUCTION OF UP TO TWELVE (12) BUS CONDITIONING UNIT (BCU-4000) WITH ROCKWELL COLLINS (FPFM) ESTIMATED COST - $2,987,867.00
Jun 28, 20240$0PRODUCTION OF UP TO TWELVE (12) BUS CONDITIONING UNIT (BCU-4000) WITH ROCKWELL COLLINS (FPFM)

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.