IDV vehicle

75N99024D00019

M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeNIH A E CONSTRUCTION
NAICS541380 — Testing Laboratories and Services
PSCJ046 — Maintenance, Repair and Rebuilding of Equipment: Water Purification and Sewage Treatment Equipment
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$0
Current contract valueNot reported
Potential contract value / ceiling$2.9M
Start dateAug 5, 2024
Current end dateNot available
Potential end dateNot available
Latest award activitySep 10, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 10, 2026P00010$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Sep 8, 2026P00009$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Jul 30, 2026P00008$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Jul 23, 2026P00007$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Aug 12, 2025P00006$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Aug 8, 2025P00004$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Aug 8, 2025P00005$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Jul 10, 2025P00002$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Jul 10, 2025P00003$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Aug 14, 2024P00001$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE
Aug 12, 20240$0M30937030 BUILDING 10 CRC, 5-YEAR WATER PARAMETER SURVEILLANCE

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.