IDV vehicle

80SSC018D0019

THIS REGIONALIZED MULTIPLE AWARD CONSTRUCTION CONTRACT TWO (MACC-II) RESULTED IN TWENTY-FOUR (24) INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) IN SUPPORT MACC-II. THE MACC-II PROVIDES A CRITICAL IN-PLACE CONTRACTUAL MECHANISM THROUGH A REGIONALIZED MULTIPLE AWARD, INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO SUPPORT GENERAL CONSTRUCTION, ALTERATION, MODIFICATION, MAINTENANCE AND REPAIR, DEMOLITION, DESIGN-BUILD, AND NEW CONSTRUCTION OF BUILDINGS, FACILITIES, AND REAL PROPERTY AT JOHN C. STENNIS SPACE CENTER (SSC), JOHNSON SPACE CENTER (JSC) INCLUDING WHITE SANDS TEST FACILITY (WSTF), KENNEDY SPACE CENTER (KSC), AND MARSHALL SPACE FLIGHT CENTER (MSFC) INCLUDING MICHOUD ASSEMBLY FACILITY (MAF). MACC-II WILL ALSO SUPPORT EMERGENCY RESPONSE TO NATURAL DISASTERS AND EMERGENCIES. OTHER NASA CENTERS AND FEDERAL TENANTS AT NASA FACILITIES MAY UTILIZE MACC-II WITH SSC PROCUREMENT OFFICER APPROVAL. THE MACC-II IS NOT A REQUIREMENTS CONTRACT AND THEREFORE NOT MANDATORY. THE MACC-II IS INTENDED TO PROVIDE A HIGHLY FLEXIBLE CONSTRUCTION CONTRACTING VEHICLE FOR PARTICIPATING CENTERS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA STENNIS SPACE CENTER
NAICS236210 — Industrial Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeORDER DEPENDENT (IDV ALLOWS PRICING ARRANGEMENT TO BE DETERMINED SEPARATELY FOR EACH ORDER)
Obligations$0
Current contract valueNot reported
Potential contract value / ceiling$100.0M
Start dateOct 24, 2017
Current end dateNot available
Potential end dateNot available
Latest award activityJun 1, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 1, 2026P00007$0THIS REGIONALIZED MULTIPLE AWARD CONSTRUCTION CONTRACT TWO (MACC-II) SHALL RESULT IN THE AWARD OF A MAXIMUM OF TWENTY-FOUR (24) INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) IN SUPPORT MACC-II. THE MACC-II PROVIDES A CRITICAL IN-PLACE CONTRACTUAL MECHANISM THROUGH A REGIONALIZED MULTIPLE AWARD, INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO SUPPORT GENERAL CONSTRUCTION, ALTERATION, MODIFICATION, MAINTENANCE AND REPAIR, DEMOLITION, DESIGN-BUILD, AND NEW CONSTRUCTION OF BUILDINGS, FACILITIES, AND REAL PROPERTY AT JOHN C. STENNIS SPACE CENTER (SSC), JOHNSON SPACE CENTER (JSC) INCLUDING WHITE SANDS TEST FACILITY (WSTF), KENNEDY SPACE CENTER (KSC), AND MARSHALL SPACE FLIGHT CENTER (MSFC) INCLUDING MICHOUD ASSEMBLY FACILITY (MAF). MACC-II WILL ALSO SUPPORT EMERGENCY RESPONSE TO NATURAL DISASTERS AND EMERGENCIES. OTHER NASA CENTERS AND FEDERAL TENANTS AT NASA FACILITIES MAY UTILIZE MACC-II WITH SSC PROCUREMENT OFFICER APPROVAL. THE MACC-II IS NOT A REQUIREMENTS CONTRACT AND THEREFORE NOT MANDATORY. THE MACC-II IS INTENDED TO PROVIDE A HIGHLY FLEXIBLE CONSTRUCTION CONTRACTING VEHICLE FOR PARTICIPATING CENTERS. THIS SOLICITATION INCLUDES 4 SEED PROJECTS, ONE FOR EACH OF THE 4 CENTERS. DETAILS ARE FOUND IN THE INITIAL (MODEL) TASK ORDERS LISTED IN SECTION J OF THIS SOLICITATION AND REFERENCED IN SECTION B SCHEDULE: THE CONTRACTOR SHALL PROVIDE ALL LABOR, TOOLS, EQUIPMENT AND MATERIALS TO PERFORM EACH TASK AS DEFINED IN THE SPECIFICATIONS AND DRAWINGS IDENTIFIED FOR THE SPECIFIC INITIAL (MODEL) TASK ORDER. SEE SECTION J. AND REFERENCE BID ITEM 0002-0005.
Oct 20, 2025P00006$0THIS REGIONALIZED MULTIPLE AWARD CONSTRUCTION CONTRACT TWO MACC-II SHALL RESULT IN THE AWARD OF A MAXIMUM OF TWENTY-FOUR 24 INDEFINITE DELIVERY/INDEFINITE QUANTITY IDIQ IN SUPPORT MACC-II. THE MACC-II PROVIDES A CRITICAL IN-PLACE CONTRACTUAL MECHANISM THROUGH A REGIONALIZED MULTIPLE AWARD, INDEFINITE DELIVERY, INDEFINITE QUANTITY IDIQ CONTRACT TO SUPPORT GENERAL CONSTRUCTION, ALTERATION, MODIFICATION, MAINTENANCE AND REPAIR, DEMOLITION, DESIGN-BUILD, AND NEW CONSTRUCTION OF BUILDINGS, FACILITIES, AND REAL PROPERTY AT JOHN C. STENNIS SPACE CENTER SSC, JOHNSON SPACE CENTER JSC INCLUDING WHITE SANDS TEST FACILITY WSTF, KENNEDY SPACE CENTER KSC, AND MARSHALL SPACE FLIGHT CENTER MSFC INCLUDING MICHOUD ASSEMBLY FACILITY MAF. MACC-II WILL ALSO SUPPORT EMERGENCY RESPONSE TO NATURAL DISASTERS AND EMERGENCIES. OTHER NASA CENTERS AND FEDERAL TENANTS AT NASA FACILITIES MAY UTILIZE MACC-II WITH SSC PROCUREMENT OFFICER APPROVAL. THE MACC-II IS NOT A REQUIREMENTS CONTRACT AND THEREFORE NOT MANDATORY. THE MACC-II IS INTENDED TO PROVIDE A HIGHLY FLEXIBLE CONSTRUCTION CONTRACTING VEHICLE FOR PARTICIPATING CENTERS. THIS SOLICITATION INCLUDES 4 SEED PROJECTS, ONE FOR EACH OF THE 4 CENTERS. DETAILS ARE FOUND IN THE INITIAL MODEL TASK ORDERS LISTED IN SECTION J OF THIS SOLICITATION AND REFERENCED IN SECTION B SCHEDULE: THE CONTRACTOR SHALL PROVIDE ALL LABOR, TOOLS, EQUIPMENT AND MATERIALS TO PERFORM EACH TASK AS DEFINED IN THE SPECIFICATIONS AND DRAWINGS IDENTIFIED FOR THE SPECIFIC INITIAL MODEL TASK ORDER. SEE SECTION J. AND REFERENCE BID ITEM 0002-0005.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.