IDV vehicle
89303322DEM000077
WASTE ISOLATION PILOT PLANT (WIPP) MANAGEMENT AND OPERATING (M&O) CONTRACT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | EM-ENVIRONMENTAL MGMT CON BUS CTR |
| NAICS | 562211 — Hazardous Waste Treatment and Disposal |
| PSC | F999 — Other Environmental Services, Studies, and Analytical Support |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $1.9B |
| Current contract value | Not reported |
| Potential contract value / ceiling | $3.8B |
| Start date | Jul 11, 2022 |
| Current end date | Not available |
| Potential end date | Not available |
| Latest award activity | Sep 2, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 103 of 103 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 2, 2026 | P00102 | $-400.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 28, 2026 | P00101 | $37.7M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 27, 2026 | P00100 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 19, 2026 | P00098 | $-8.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 19, 2026 | P00099 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 23, 2026 | P00097 | $13.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 25, 2026 | P00096 | $1.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 10, 2026 | P00095 | $301.7K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 2, 2026 | P00094 | $0 | EO 14398 |
| May 19, 2026 | P00093 | $2.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 29, 2026 | P00092 | $162.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 31, 2026 | P00091 | $18.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 13, 2026 | P00090 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 5, 2026 | P00089 | $23.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 29, 2026 | P00088 | $33.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 27, 2026 | P00087 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 18, 2025 | P00086 | $96.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 1, 2025 | P00085 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 24, 2025 | P00084 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 7, 2025 | P00083 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 31, 2025 | P00082 | $-620.8K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 27, 2025 | P00081 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 30, 2025 | P00080 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 25, 2025 | P00079 | $24.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 16, 2025 | P00078 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 11, 2025 | P00077 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 4, 2025 | P00076 | $17.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 23, 2025 | P00075 | $192.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 14, 2025 | P00074 | $1.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 9, 2025 | P00073 | $-0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 30, 2025 | P00072 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 26, 2025 | P00071 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 25, 2025 | P00070 | $40.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 17, 2025 | P00069 | $19.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 3, 2025 | P00068 | $22.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 5, 2025 | P00067 | $21.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 29, 2025 | P00066 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 17, 2025 | P00065 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 16, 2025 | P00064 | $-1.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 31, 2025 | P00063 | $29.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 3, 2025 | P00062 | $7.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 26, 2025 | P00061 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 11, 2025 | P00060 | $6.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 6, 2025 | P00059 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 29, 2025 | P00058 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 15, 2025 | P00057 | $72.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 19, 2024 | P00056 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 11, 2024 | P00055 | $154.5K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 22, 2024 | P00054 | $5.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 21, 2024 | P00053 | $4.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 30, 2024 | P00052 | $5.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 29, 2024 | P00051 | $70.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 25, 2024 | P00050 | $10.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 24, 2024 | P00049 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 23, 2024 | P00048 | $12.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 29, 2024 | P00047 | $59.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 15, 2024 | P00046 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 1, 2024 | P00045 | $4.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 18, 2024 | P00044 | $42.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 27, 2024 | P00043 | $54.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 7, 2024 | P00042 | $-1.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 29, 2024 | P00041 | $34.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 16, 2024 | P00040 | $2.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 2, 2024 | P00039 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 30, 2024 | P00038 | $27.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 28, 2024 | P00037 | $23.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 28, 2024 | P00036 | $39.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 1, 2024 | P00035 | $44.2M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jan 11, 2024 | P00034 | $9.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 20, 2023 | P00033 | $61.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Dec 13, 2023 | P00032 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 30, 2023 | P00031 | $8.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 29, 2023 | P00030 | $10.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 16, 2023 | P00029 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 6, 2023 | P00028 | $340.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Nov 2, 2023 | P00027 | $65 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 31, 2023 | P00026 | $10.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Oct 16, 2023 | P00025 | $36.3M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 28, 2023 | P00023 | $16.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 28, 2023 | P00024 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 14, 2023 | P00022 | $-8.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Sep 13, 2023 | P00021 | $8.9M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 18, 2023 | P00020 | $-307.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 17, 2023 | P00019 | $8.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Aug 1, 2023 | P00018 | $1.9K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 27, 2023 | P00017 | $45.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 6, 2023 | P00016 | $1.1K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 28, 2023 | P00015 | $5.4M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jun 14, 2023 | P00014 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 31, 2023 | P00013 | $21.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 18, 2023 | P00012 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| May 2, 2023 | P00011 | $-80.0K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 17, 2023 | P00010 | $157.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 12, 2023 | P00009 | $-888.6K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Apr 5, 2023 | P00008 | $-1.1M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 31, 2023 | P00007 | $7.2K | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 27, 2023 | P00006 | $32.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 16, 2023 | P00005 | $57.0M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Mar 3, 2023 | P00004 | $67.8M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 17, 2023 | P00002 | $29.5M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 17, 2023 | P00003 | $0 | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Feb 7, 2023 | P00001 | $70.6M | THE MAJOR PURPOSE OF THIS CONTRACT IS TO OPERATE AND MAINTAIN THE WASTE ISOLATION PILOT PLANT (WIPP) AND TO IMPLEMENT THE DOE'S NATIONAL TRANSURANIC WASTE PROGRAM (NTP). THE OVERALL MISSION OF THE WIPP AND THE NATIONAL TRANSURANIC WASTE PROGRAM |
| Jul 11, 2022 | 0 | $5.0M | WASTE ISOLATION PILOT PLANT (WIPP) MANAGEMENT AND OPERATING (M&O) CONTRACT |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| John Blecher | Contact | john.blecher@emcbc.doe.gov 5137440980 | Source | Jul 21, 2021 |
| John Blecher | Contact | john.blecher@emcbc.doe.gov 5137440980 | Source | Jul 20, 2021 |
| John Blecher | Contact | john.blecher@emcbc.doe.gov 5137440980 | Source | Jul 13, 2021 |
| John Blecher | Contact | john.blecher@emcbc.doe.gov 5137440980 | Source | Jun 2, 2021 |
| John Blecher | Contact | john.blecher@emcbc.doe.gov 5137440980 | Source | Apr 12, 2021 |
| John Blecher | Contact | john.blecher@emcbc.doe.gov 5137440980 | Source | Jul 16, 2020 |
| John Blecher | Contact | john.blecher@emcbc.doe.gov 5137440980 | Source | Jul 16, 2020 |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.